Council archive · source document
132003.221172.4 Request textend relevant period
I
’J
ISunshine Coast
Regional Council
Request to Change Existing Approval and/or
Extension to Relevant Period
NOTES: entity issued the approval?
ALL questions MUST be completed unless theform indicotes unshine Coast Regional Council
otherwise. Other entity -
please specify:
This form must be submitted to Council accompanied by the
for a mobile and temporary ERA?
applicable fee.
Attach extra pages if there is insufficient space on theform.
~proval
If Council was the Assessment Manager for the existing approval, Iz::J ;;s complete
-
below
and the opprovol was issued by the Court, then:-
Insert the name of each local government area in which the
(a) a request to change the development approval and/or mobile and temporary ERA is proposed to
conditions is made to the Court; and
operate/operating.
(b) a request to extend the relevant period for the approval is
made to Council.
AI/ terms used on the form have the meaning given in the
Sustainable Planning Act 2009 or the Sustainable Planning
Regulation 2009. I 3. Nature of request
Please tick ALL applicable categories
I 1. Details of the person making the request
TO change the development approval
Full name -
individual or company Io change the development conditions
To extend the relevant period before lapsing
HAQ.Mf’tN FAMlL)’ ""l’FN~’-
Please attach documentation outlining the details of
Contact name -
~greN HarmaN
for company
\ and the reasons and justification for the requested
change or extension.
Postal address
I 4. Location of the premises
~\-,
~,~ ’:#~8~1
.
Postcode L_ .
Street address
Unit no. Street no. Street name
Contact phone number Fax number -
if applicable
~\ I Elanoo. sf
Suburb Postcode
I (07)S}4g I :;If) \ I
I ~s.h\(\" (\(eAd" -
14$"G7
Mobile number -
if applicable
I (O<\-l~) l?o 4J I Lot and plan description
Lot no Plan type & plan no
E-mail address -
if applicable
~<t ra (-) 4-f I I")
’kd"e.~ C2 ;2.\!’\CCOOSg. COvY\-ClJ
I 2. Details of the existing approval
Type of approval -
please tick ALL applicable categories
.....-’/
~ Development Permit
Preliminary Approval 15. Concurrence Agencies
f---
f---
Compliance Permit Was there one or more concurrence agencies involved in
Material Change of Use
th iginal approval?
f---
Reconfiguring a Lot No
I---
Operational Works Yes -
provide details below
f---
Building Works Note Under s372 of the Sustainable Planning Act 2009 the person
-
I---
Plumbing or Drainage Works making the request is required to give a copy of this request to all
concurrence agencies.
Compliance Certificate 1
Environmentally Relevant Activity (ERA) I Concurrence Agency Date copy given
Application number Date issued / /
/ /
23’5’"’7 I J1I Q/ 03
/ /
PD-DA.FM401/1-30/04/2010 Page 1 of 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
132003.221172.4 Request textend relevant periodRelated documentApplication case desk ↗
About this file
- File size
- 8.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.