Judgement - 11C Church Street
5400 OMP
SITE CALUCATIONS PROPOSED RESPONSE
SETBACK GROSS FLOOR AREA
6000 WALL LOT 4 SP301620 TOTAL 15 UNITS
3.5m WIDE DRAINAGE UNIT 1 INTERNAL 97.5 m² SD AREA 7517m² 11 SMALL DWELLINGS (SD)
BOUNDARY SETBACK
EASEMENT UNIT 2 INTERNAL 88.8 m² SD 4 DWELLINGS
3250 OMP
SETBACK
3850 WALL
3470 OMP
SETBACK
4070 WALL
SETBACK
SETBACK
UNIT 3 INTERNAL 97.7 m² SD
LANDSCAPING MINIMUM 40% AND 60% OF THIS PROPOSED LANDSCAPING (3245m²) 56.8%
CHURCH STREET
UNIT 4 INTERNAL 97.1 m² SD SOFT LANDSCAPING PROPOSED SOFT 99%
V4 V3 UNIT 5 INTERNAL 97.1 m² SD
UNIT 6 INTERNAL 124.8 m² PRIVATE OPEN SPACE MINIMUM 25m² ACHIVED
UNIT 7 INTERNAL 86.7 m² SD PRIVATE OPEN SPACE MINIMUM 20m² ACHIEVED
5400 OMP
15 FL 94.63 m UNIT 8 INTERNAL 98.8 m² SD
SMALL DWELLINGS
SETBACK 5
FL 94.56 m
4
FL 93.65 m 3
FL 92.50 m
2 1
FL 92.71 m
UNIT 9 INTERNAL
UNIT 10 INTERNAL
98.8 m²
106.8 m²
SD
MAX GRADIENT 10% ACHIEVED
FL 92.57 m SITE COVER MAX 40% PROPOSED 27.7%
6000 WALL FL 94.63 m UNIT 11 INTERNAL 107.6 m²
14
V1 PLOT RATIO MAX 0.4:1 PROPOSED 0.19:1
UNIT 12 INTERNAL 82.5 m² SD
SETBACK UNIT 13 INTERNAL 82.4 m² SD CARPARKING PROPOSED CARPARKING
BRIDGE UNIT 14 INTERNAL 85.0 m² SD MINIMUM 1 PER 2 BED 1 PER 2 BED = 5
STORMWATER TREATMENT UNIT 15 INTERNAL 106.8 m² MINIMUM 2 PER 3 BED 2 PER 3 BED = 20
FL 94.50 m LETTER MINIMUM VISITOR 1 PER U 4 UNITS 6 VISITOR PARKING SPACES
13 BOX
SHARED BINS
TOTAL GFA 1458.5 m²
(MINIMUM 32) TOTAL 31 CARPARKING SPACES
V2
9 8 7 6
12 FL 94.29 m FL 94.40 m FL 93.65 m
FL 92.50 m FL 92.68 m BOUNDARY
1350
9650 WALL
NORTH
BOUNDARY
SETBACK SUMMER SUN
11 FL 94.03 m SHARED
RIPARIAN BUFFER BOUNDARY 9050 OMP
WINTER SUN
1400
5600 41100
RETAINING WALLS SETBACK
V5 DDA PROPOSED STORMWATER EASMENT
W E
5.6m WIDE DRAINAGE
BOUNDARY
FL 94.18 m V6 EASEMENT
10
BOUNDARY
S
BOUNDARY
SE
1.4m WIDE NATURAL DRAIN STORMS
EASEMENT
DARY STREAM CENTRE LINE
BOUN BOU
NDA
RY
STORMWATER
TREATMENT
RY
NDA
BOU
2 PROPOSED
1 : 1000
EASEMENT PLAN
RIPARIAN BUFFER LEGEND
RY
DA REFER SURVEY PLAN 11-3216AQ1 Date: 9-11-21
UN
BO
Denotes the 10m setback from the stream
centreline
1 SITE
1 : 500
PLAN COMPLETE Denotes stream centreline.
Address: No. Issue Details Date
Client: Drawing Name:
BUILDING DESIGN 25 RFI RESPONSE 08-07-2022
AUSTRALIA WIDE Zaccale Pty Ltd 11C Church Street, Pomona QLD 4568 27 RFI REDESIGN 07-09-2022 SITE PLAN - PROPOSED
RESIDENTIAL 28 Revision 28 07-08-2022
COMMERCIAL 31 REDESIGN 30-09-2022
RENOVATIONS 33 DRAIN REFERENCE 05-10-2022
ACCESSIBLE Project number 11808
PH. 0405 097 553
Project: Property Details: 34 SANDSTONE RETAINING 05-10-2022
35 ENGINEERING REDESIGN 22-11-2022
[email protected]
www.alldd.com.au Residential Multi Unit Development LOT 4 SP301620 7517m² 38 REDESIGN 18-05-2023
Current Issue Date 25-07-2023
VBA DP-AD 37989 40 FENCING 19-05-2023 Scale (A3) As indicated
QBCC 1084590 42 AMENDMENTS 12-06-2023
BDAA 6779 Drawing no. PA102
Status: REDESIGN
THIS DRAWING IS THE COPYRIGHT AND PROPOERTY OF ALL DESIGN AND
43 CONDITIONS REVIEW 25-07-2023
DRAFTING. IT IS NOT TO BE COPIED, RETAINED OR USED FOR ANOTHER PURPOSE.
15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.