Original source · versioned page text
MCU14/0106 & OPW15/0001 Appendix F - Ecological and Bushfire Management Response
Very large file: it may take a few minutes
The original of this document is very large (27.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Noosa Civic Expansion
Bushfire Assessment Report
6 Bushfire Management Plan
A Bushfire Management Plan (The Consultancy Bureau, 2004) was prepared in accordance with the
Conditions of Approval for the existing Noosa Shire Business Centre Stage 1 development.
An updated Bushfire Management Plan (Cardno, 2015) has been prepared for the expanded Noosa Civic
development which encompasses the Noosa Shire Business Centre Stage 1 and the proposed Noosa Civic
expansion. The updated Bushfire Management Plan (Cardno 2015) is presented in Appendix D and is
generally consistent with:
> the specifications of the approved Noosa Shire Business Centre Stage 1 Bushfire Management Plan (The
Consultancy Bureau, 2004); and
> the specifications of SPP 1/03 Guideline – Appendix 8 Undertaking a Bushfire Management Plan.
The Bushfire Management Plan (Cardno, 2015) provides:
a) the purpose, aim and objectives of the bushfire management plan (e.g. to define the level of hazard
on the land and identify actions and responsibilities for the management of the hazard);
b) a summary of the results of the bushfire hazard assessment undertaken for the site, including:
i. identification of the various parts of the site and adjacent lands that have been determined to
be high, medium and low bushfire hazard area; and
ii. the impacts of the proposed development on the level of fire hazard experienced by other land
in the surrounding area, including any land containing water, electricity, gas or
telecommunications infrastructure;
c) fire hazard mitigation specifications, including:
i. reporting and notification pathways in the event of a bushfire;
ii. general specifications and materials for building design and construction in accordance with
the Building Code of Australia;
iii. fire fighting infrastructure, including water supply, equipment and fittings, fire breaks and
maintenance/access trails;
iv. details of long term management requirements, including the frequency, extent and intensity
of burning in areas proposed to be subject to fuel reduction and ecological burns; and
v. the parties to be responsible for specific actions taken under the terms of the bushfire
management plan.
QIC Noosa Civic Pty Ltd Version 2 23 April 2015
J13041_Bushfire Assessment V2.docx Commercial in Confidence Page 28
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.