Skip to the record
Accept no imitations.

Original source · versioned page text

MCU14/0106 & OPW15/0001 Appendix F - Ecological and Bushfire Management Response

of 76

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (27.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Noosa Civic Expansion
Bushfire Assessment Report




8                References
Australian Standard AS3959-2009 Construction of buildings in bushfire prone areas.
BoM and CSIRO (2014) State of the Climate 2014 http://www.csiro.au/state-of-the-Climate-2014
Cardno (2014). Noosa Civic Extension – Bushfire Assessment Report (version 1). Prepared for QCI Noosa
Civic Pty Ltd and submitted as part of the Noosa Civic Expansion development application (Ref: MCU14/0106
& OPW15/0001).
Cardno (2014b). Noosa Civic Extension - State and Local Government Ecological Assessment. Prepared for
QCI Noosa Civic Pty Ltd and submitted as part of the Noosa Civic Expansion development application (Ref:
MCU14/0106 & OPW15/0001).
Draft State Planning Policy Guideline - State Interest - Guidance on flood, bushfire and landslide hazards
(December 2013).
Fire Check Consultants (Undated). Fire Management Plan (Version 1.04) – Noosa Civic State 1, Eenie Creek
Road, Noosaville Queensland.
Leonard, J., Newnham, G., Opie, K., and Blanchi, R. (2014). A new methodology for state-wide mapping of
bushfire prone areas in Queensland. CSIRO, Australia.
Noosaville Natural Hazard: Bushfire & Acid Sulfate Soils Overlay (Map OM9.4).
Noosa Plan (2013) - Natural Hazards Overlay Code.
State Planning Policy 1/03 Guideline – Mitigating the Adverse Impacts of Flood, Bushfire and Landslide (SPP
1/03 Guideline)
State Planning Policy (SPP) – Natural Hazards, Risk and Resilience -Technical Manual - A ‘fit for purpose’
approach in undertaking natural hazard studies and risk assessments (August, 2014).
The Consultancy Bureau (2004). Noosa Shire Business Centre Stage 1 Bushfire Management Plan.
Tran, C. (2002). Southeast Queensland Fire and Biodiversity Consortium - Fire Management Operational
Manual Best Practice Guidelines and Procedures.




QIC Noosa Civic Pty Ltd                          Version 2                                      23 April 2015
J13041_Bushfire Assessment V2.docx         Commercial in Confidence                                 Page 30
Log in to download the original file

MCU14_0106 & OPW15_0001 Appendix F - Ecological and Bushfire Management Response.pdf · 27.6 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.