Proposed Plan

Attached to the e-mail Operational Works Application OPW19/0193 - DA Form 1- Cover Letter - Proposed Plan - 91 Ewarts Rd COORAN.

of 25

Page text shows just the words. Original shows the document exactly as it was published.

Very large file: it may take a few minutes

The original of this document is very large (12.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
    NOTES:
                                                            WORKPLACE HEALTH AND SAFTY NOTES                                          General Consturction Notes
    1). CONCRETE CLASS
                                                            BELOW IS INFORMATION FOR THE BUILDER OF THIS PROJECT TO ENSURE THAT       Minimum Design Standards
                                                            MINIMUM WORKPLACE SAFETY ARE MET AND WORKERS ACKNOWLEDGE                  Construction of this building to be in accordance with the following Australian governing bodies.
    CONCRETE TO BE CLASS N25 FOR SLABS & CLASS N20
    FOR FOOTINGS & PIERS. 80 SLUMP. 20 NOM. AGGREGATE
                                                            THAT THEY UNDERSTAND THE SAFE MANUAL AND TECHNICAL HANDLING               ◊ Building Code of Australia (NCC)
                                                            REGULATIONS IN PLACE FOR THE REQUIRED PHYSICAL WORK. SPECIFIC
                                                            PROJECT WHS REPORT MUST BE KEPT ON SITE AT ALL TIMES.
                                                                                                                                      ◊ Queensland Development Code
    2). CONCRETE COMPACTION                                                                                                           ◊ Standard Building Regulation 2006
    ALL CONCRETE TO BE MECHANICALLY VIBRATED FOR
    COMPACTION IN TRENCHES OR FORMWORK.
                                                            THE PRINCIPAL CONTRACTOR FOR A CONSTRUCTION PROJECT MUST
                                                            REVIEW AND, AS NECESSARY, REVISE THE WHS MANAGEMENT PLAN TO
                                                                                                                                      Elements of Construction
    3). SITE SOIL CONDITIONS
                                                            ENSURE THAT IT REMAINS UP TO DATE.                                        Roof Construction
    IF SOIL OR SITE CONDITIONS VARY FROM THOSE                                                                                        Selected Roof Tiles to be fixed in accordance with manufactures specification.
                                                            A DUTY HOLDER, IN MANAGING RISKS TO HEALTH AND SAFETY, MUST               All ridge capping, steps, hips valleys and vent flashings to provide waterproofing system.
    INDICATED IN THE SITE INVESTIGATION REPORT THEN
                                                            IDENTIFY REASONABLY FORESEEABLE HAZARDS THAT COULD GIVE RISE TO           Provide reflective foil backed sarking to underside of roof sheeting.
    THE FOOTING AND SLAB DESIGN SHOULD BE VERIFIED
                                                            RISKS TO HEALTH AND SAFETY.                                               Colorbond guttering and PVC Downpipes to be connected to stormwater systems in accordance with the local authority.
    WITH E.B.I.S.
                                                                                                                                      Roof water requirements and calculations are provided on the site plan.
                                                            THE PERSON CONDUCTING A BUSINESS OR UNDERTAKING WHO DIRECTS
    4). SCALED DIMENSION                                                                                                              Wall Construction
                                                            THE CARRYING OUT OF WORK MUST PROVIDE THE PERSONAL PROTECTIVE
    DO NOT SCALE THIS DRAWING FOR SET OUT. REFER TO                                                                                   External Wall                         - Cladding to 90mmTimber Frame
                                                            EQUIPMENT TO WORKERS AT THE WORKPLACE, UNLESS THE PERSONAL
    DIMENSIONED WORKING DRAWINGS.                                                                                                     Internal Wall                         - 90mm Timber Frame
                                                            PROTECTIVE EQUIPMENT HAS BEEN PROVIDED BY ANOTHER PERSON
                                                            CONDUCTING A BUSINESS OR UNDERTAKING.                                     Internal Wall Lining                  - 10mm Plasterboard
    5). TERMITE MANAGEMENT                                                                                                            Internal Wet Areas                    - 6mm Aquacheck
    PROVIDE TERMITE MANAGEMENT SYSTEM TO REDUCE
                                                            THE LAYOUT OF THE WORKPLACE ALLOWS, AND THE WORKPLACE IS
    LIKELIHOOD OF TERMITE INFESTATION & TO DETER                                                                                      Glazing Construction
                                                            MAINTAINED SO AS TO ALLOW, FOR PERSONS TO ENTER AND EXIT
    CONCEALED ENTRY.                                                                                                                  Powdercoated Aluminium Frame Windows in accordance with AS4055 "wind loads for residential" & AS1288 "Glass in Buildings selection and installation"
                                                            AND TO MOVE ABOUT WITHOUT RISK TO HEALTH AND SAFETY, BOTH
                                                            UNDER NORMAL WORKING CONDITIONS AND IN AN EMERGENCY.
    6). FILL COMPACTION                                                                                                               Floor Construction
    COMPACT FILL UNDER SLAB TO 65% SAND DENSITY                                                                                       Floors in "Wet Areas" to be impervious in accodance with Australian Standards Finish and fall gradients to floor wastes.
                                                            A PERSON CONDUCTING A BUSINESS OR UNDERTAKING AT A WORKPLACE
    INDEX OR 98% STANDARD COMPACTION. USE ONLY CLEAN
                                                            MUST ENSURE, SO FAR AS IS REASONABLY PRACTICABLE, THE PROVISION
    SOIL - FREE OF ORGANIC OR COMPRESSIBLE MATTER.
                                                            OF ADEQUATE FACILITIES FOR WORKERS, INCLUDING TOILETS, DRINKING           Soffit Construction
                                                            WATER, WASHING FACILITIES AND EATING FACILITIES.                          4.5mm F.C Sheeting and Painted.
    7). ARTICULATION JOINTS
    ARTICULATION JOINTS TO BE CONSTRUCTED IN                                                                                          Termite Risk Management
                                                            A PERSON CONDUCTING A BUSINESS OR UNDERTAKING AT A WORKPLACE              Method to be in accordance with the NCC Part 3.1.3 and other relevant manufacturer specification. All new work shall be protected from termite attack
    ACCORDANCE WITH "CONCRETE INFORMATION" FROM THE
                                                            MUST MAINTAIN THE EMERGENCY PLAN FOR THE WORKPLACE SO THAT IT             in accordance with AS 3600.1 "Protection of the Building from Subterranean Termites. AS2870 Part 1 New Building Slabs. Construction must contain
    CEMENT AND CONCRETE ASSOCIATION OF AUSTRALIA -
                                                            REMAINS EFFECTIVE.                                                        approved stainless steel mesh collars to penetrations and construction joints.
    TECHNICAL NOTE 61.

    8). LOAD BEARING
                                                            A PERSON CONDUCTING A BUSINESS OR UNDERTAKING AT A WORKPLACE              General Notes
                                                            MUST ENSURE THAT NO PERSON AT THE WORKPLACE IS EXPOSED TO A                1.           Design wind load N4.
    LOAD BEARING WALLS SHOULD BE SUPPORTED BY SLAB
                                                            SUBSTANCE OR MIXTURE IN AN AIRBORNE CONCENTRATION THAT EXCEEDS             2.           Residential timber framed construction AS1684.2
    THICKENINGS. WHERE THIS DOES NOT OCCUR, VERIFY THE
                                                            THE EXPOSURE STANDARD FOR THE SUBSTANCE OR MIXTURE.                        3.           Pine framing to be min stress grade MGP 10 & min joint group JD4.
    DESIGN WITH E.B.I.S.
                                                                                                                                       4.           Hardwood to be min stress grade F14 & min joint group J2.
                                                            A PERSON CONDUCTING A BUSINESS OR UNDERTAKING AT A WORKPLACE               5.           Timber for trusses to be min joint group JD4.
    9. SITE INSPECTIONS
                                                            MUST ENSURE THAT, IF FLAMMABLE OR COMBUSTIBLE SUBSTANCES ARE               6.           WC doors opening inwards to be fitted with lift off hinges & be fitted to allow the door to be removed when in the closed position.
    THE FOOTING & SLAB PREPARATIONS SHOULD BE VERIFIED
                                                            KEPT AT THE WORKPLACE, THE SUBSTANCES ARE KEPT AT THE LOWEST               7.           Trusses to be fixed in accordance with the manufacturers specifications. All other fixings to be in accordance with AS1684 timber solutions tie down.
    BY INSPECTIONS DURING CONSTRUCTION. WHERE
                                                            PRACTICABLE QUANTITY FOR THE WORKPLACE.                                    8.           All dimensions take precedence over scale. Ordering of materials.
    PREPARATION VARY FROM THE DESIGN THEN ADEQUACY
    SHOULD BE VERIFIED WITH E.B.I.S                                                                                                    9.           Builder & trades are to confirm all measurements, details & specifications prior to setout.
                                                            THE PERSON CONDUCTING THE BUSINESS OR UNDERTAKING AT A                     10.          Any errors are to be addressed to the designer as no responsibility will be taken after construction has commenced.
                                                            WORKPLACE MUST MINIMISE THE RISK OF AN OBJECT FALLING ON A                 11.          All trades are to comply with the current Australian standards relating to their work.
    10). HOT WEATHER CONDITIONS
                                                            PERSON BY PROVIDING ADEQUATE PROTECTION AGAINST THE RISK UNDER             12.          All wet areas to be in accordance with the Australian domestic construction manual and NCC 3.8.1.
    DURING HOT OR WINDY CONDITIONS ADDITIONAL
                                                            THIS SECTION.                                                              13.          Fridge & washing machine supplied by owner.
    PRECAUTIONS SHOULD BE TAKEN TO CONTROL
    EVAPORATION, TO REDUCE THE RISK OF PREHARDENING                                                                                    14.          All ground levels are approximate only.
                                                            THE PERSON CONDUCTING THE BUSINESS OR UNDERTAKING FOR WHICH                15.          Verify all dimensions prior to commencement.
    CRACKING IN CONCRETE. THIS MAY TAKE THE FORM OF A
                                                            THE WORKER IS CARRYING OUT WORK MUST ENSURE THAT AIR SUPPLIED              16.          All pole dimensions are to center of pole unless noted otherwise.
    SPRAY ON ANTI - EVAPORATIVE AGENT AND ESTABLISHING
                                                            RESPIRATORY EQUIPMENT IS AVAILABLE FOR USE BY, AND IS PROVIDED             17.          Given dimensions assume a 90mm Timber frame.
    A TEMPORARY WIND BREAK
                                                            TO, THE WORKER IN AN EMERGENCY.                                            18.          Footings construction to be in accordance with Geotechnical report & Engineer's detail for this allotment.
    11. BLOCK WORK REINFORCING                                                                                                         19.          Carpenter to ensure tie down and support studs to girder locations as required by truss manufacturer.
                                                            A PERSON CONDUCTING A BUSINESS OR UNDERTAKING MUST ENSURE                  20.          Normal bracing being adopted at 50% raking value in each direction as per AS1684.2.
    VERTICAL STARTER BARS ARE TO BE PROVIDED TO
                                                            THAT RELEVANT WORKERS ARE PROVIDED WITH SUITABLE AND ADEQUATE              21.          For ply panels less than 900mm wide use M12 rods each end in addition to the minimum requirements.
    COINCIDE WITH THE LOCATIONS SPECIFIED BY THE
                                                            INFORMATION AND TRAINING AS NOTED IN THE WORK HEALTH AND SAFETY            22.          M12 rods beside openings, at end of wall and in between at every truss location.
    DESIGNER. THESE ARE GENERALLY AT ALL CORNERS,
                                                            REGULATION 2011 OR CURRENT                                                 23.          M12 bolts or nominal fixing at 1200 centers.
    EITHER SIDE OF OPENINGS AND AT 1200 MAX CENTERS
    AND ARE TO BE CAST INTO THE FOOTING AND OR SLAB                                                                                    24.          Wall bracing to suit (N3).
                                                            CURRENT AS AT 1 JULY 2013 INFORMATION, TRAINING AND INSTRUCTION            25.          Lintels carrying girder trusses will be sized accordingly.
                                                            IN RELATION TO THE                                                         26.          All doors, driveways, paths clothes lines, stormwater lines, landscaping, letter box, hot water system, ground pits, electrical appliances & plumbing
    12. REFERENCED DOCUMENTS
                                                            FOLLOWING—                                                                              symbols are diagrammatic only, for shape or position refer to builders specification for details of all fixtures.
    THESE PLANS ARE TO BE READ IN CONJUNCTION WITH
                                                            (A) THE NATURE OF ALL HAZARDS RELATING TO A CONFINED SPACE;                27.          All timber:- cutek timber preserver to be applied to all cut ends to avoid timber rot.
    ENGINEERING DRAWINGS
                                                            (B) THE NEED FOR, AND THE APPROPRIATE USE OF, CONTROL                      28.          Smoke alarms complying with AS3786 to be installed and connected to consumer mains power in accordance with NCC part 3.7.2.
                                                            MEASURES TO CONTROL RISKS TO HEALTH AND SAFETY ASSOCIATED
                                                            WITH THOSE HAZARDS;
                                                            (C) THE SELECTION, FIT, USE, WEARING, TESTING, STORAGE AND
                                                            MAINTENANCE OF ANY PERSONAL PROTECTIVE EQUIPMENT;
                                                            (D) THE CONTENTS OF ANY CONFINED SPACE ENTRY PERMIT THAT MAY
                                                            BE ISSUED IN RELATION TO WORK CARRIED OUT BY THE WORKER IN
                                                            A CONFINED SPACE;
                                                            (E) EMERGENCY PROCEDURES.




 CONSTRUCTION
SCALE:              No.                      Description               Drawn     Date
                                                                                          PHONE (07) 5476 8690                                                         Martens Building Design                  CLIENT:
                                                                                                                                                                                                                           A. & S. Leontakianakos
                                                                                                                                                                                                                                                                                      SHEET:
                     1                     PRELIMINARY                 KURT    04/04/19
 1 : 1@ A3                                                                                FAX (07) 5476 9380                                                               0432 224 604                                                                                               A-12-
                                                                                                                                                                                                                                                                                        12-01 NOTES

                                                                                                                 TRU              BUILT
                     9                   WORKING DRAWINGS              KURT    07/07/19   MOBILE 0418 986595
DATE:                                                                                                                                                                    [email protected]                     ADDRESS:                                                              REVISION:             WIND RATING          FIRE RATING
07/07/19                                                                                       PO BOX 1244                                                             ABN: 20 218 687 996                      LOT 61 #91 EWARTS ROAD,                                                           9                N5                 BA L 19
                                                                                               BUDERIM 4556
DESIGNED:
                                                                                               LIC NO. 729650
                                                                                                                                                                          QBSA: 126 4589                        COORAN, QLD,
                                                                                                                                                                      Signed:___________________                                                                                      TRU BUILT JOB NO.:              MBD NO.:
Rod Soppe                                                                                                          R & V DEVELOPMENTS PTY. LTD.                                                                                                                                                   1008                           J 1907
                                                                                                                                                                        Kurtis Martens / Owner
Log in to download the original file

Proposed Plan.pdf · 12.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.