Skip to the record
NoosaWatch™: The source of truth.

Council archive · source document

10/0661 - Op Works - TransportType 5 [As Published] · 142010.661

of 20

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

 

sunshine Coast Checklist - Applications Involving Planning
Regional Council Assessment and Operational Works Assessment

 

 

RECEIPT OF IDAS APPLICATIONS AT TEWANTIN OFFICE

This checklist should be used for any IDAS application. Please check each of the following items before accepting an
application at the counter to determine if properly made. (This may not always be possible and can be further checked)

 

il. APPLICATION FORMS : " |
1.1. Form 1 required for all application & Forms 2-32 :

 

4.1.1 Ensure that the relevant forms are fully completed (mandatory), are current versions and include 4

 

payment of appropriate fee. (Do not receipt at this stage)

 

1.1.2. In the case of an MCU or Op Works below the high-water mark, owner's consent is required.

 

v

 

 

1.1.2.1 If there are multiple owners, the consent of each owner is required.

1.1.2.2 _ If the owner of the land is a company, either ACN No, Company name (clearly indicated by
signatory) or Company Seal required.

 

 

[2.—_ IDAS ASSESSMENT.CHECKLIST__~ _ . a . - _i
2.1 Ensure that relevant checklist/s have been completed with.regard to referrals. —— | = ==— =sm=— -+7>-—p-
== = ==" (if applicable, not mandatory) Cy

e 2.2 Ensure correct IDAS.Forms are provided where required for referral (ie most common are Form 11 for
Assessable Vegetation, Form 24 for Contaminated land and Form 28 for Prescribed Tidal Works)

 

 

3__v ENVIRONMENTALLY RELEVANT ACTIVITIES”.

 

 

3.1 Ensure that Part G is completed if EPA referral is required.

 

3.2. Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application

 

fee is paid and recorded on the application. (Refer Healthly Places for fees)

 

 

 

 

 

 

 

 

 

      

 

 

 

 

F Py "
Z_ FORM 2 REQUEST_TO.CHANGE APPROVAL. a
4.1 Ensure that relevant items have been checked and/or completed including information regarding .
applicant details along with owners consent if not current owner of land as shown on Council records.
If over multiple properties on one or more sites, consent of Body Corporate is required.
2, PLANS: a= = Ls ee eo ae eae
5.1. Ensure that generally at least 6 sets of the Plan of Development (5 for Reconfiguration and Operational
Works) accompany the application. In addition ensure that each set is complete. it
5.2 Ensure that 1 of the copies of the Plan of Development is in an A3 or A4 format and is -~

unbound.

 

 

 

  

 

TSUPPORTING INFORMATION. = oy

6.1 Ensure that generaily at least 6 copies of any report accompanies the application (5 for Reconfiguration | —

 

and Operational Works). If the application is accompanied by a covering jetter, ensure that it is

 

capable of reproduction.

 

 

 

 

 

6.2 In the case of reports, ensure that 1 of the copies is in an A3 or A4 format and is unbound.
6.3. Additionally an electronic version is preferred where possible for ease of electronic record keeping “n.

 

7.1 Ensure that the application fee, as determined from the Council's adopted scale of fees,

 

 

accompanies the application or has been paid.

 

 

¢ Planning Assessment MCU applications; Lot reconfiguration; Prescribed Tidal Works; Operational Work if Jetty
¢ Operational Works Assessment Operational Work not including Jetties
Please DO NOT leave the application at the counter and DO NOT deliver the application to Records.

 

 

 

T g:Manduse\administrative processes\application checklist.doc
Full text of the other 19 pages

Page 2

 

ee, GENCIES TRIGGERS (Mo:

iplcasetrete io. DASC ecists fey complete,

Department of Main Roads (Concurrence oF Advice)

¢ State Controlled Road
Dept Environmental Resource & Management

Advice
e Acid sulphate soils
« Wetlands
« Conservation estate
Concurrence
¢ Clearing of native vegetation on freehold land
¢ Environmentally Relevant Activity (for non-devolved Council as EPA)
e Contaminated land
= Environmental Management/Contaminated Land Register
= UXO
= Land recently used as a ‘notifiable activity’
* — Industrial land changed to sensitive uses (eg school)
Coastal related development.
Koala habitat

  

 

 

 

 

Queensland Transport (Concurrence)
° Railway
° Public Passenger Transport

 

Energex or other responsible entity (Advice)
° Electricity Easements/Substations

 

DIP (Concurrence)

. SEQ Regionai plan

 

VARIOUS

 

   

 

 

 

:RES OU. CE! ENTITL -EMENT (State land)" oe . 4

  

 

Department of | Environmental Resource Management

 

 

 

 

 

For further clarification refer to IDAS Guides prepared by Department of Infrastructure & Planning.

T g:Manduse\administrative processes\application checklist.doc

Page 3

 

a]

 

 

 

 

 

 

 

 

 

 

 

Application Details - IDAS form 1

(Sustainable Planning Act 2009 version 1.0 effective 18 December 2009)

  
    
     
    

You MUST complete ALL questions unless the form indicates gthegwse. Incomplefé forms-o-tauns without all
necessary information and documentation will result in your apglic: Ruelop map mae applicatiory

For all development applications, you must:
. complete this form (Application details - IDAS form 1)
. complete any other forms relevant to your application

* provide any mandatory supporting information identifieda
application.

All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustaifrable
Planning Regulation 2009.

 

Applicant details (note: the applicant is the person responsible for making the application and need not be the
owner of the land. The applicant is responsible for ensuring the information provided on all IDAS application forms is
correct. Any development permit or préliminary approval that may be issued asa consequence of this application will
be issued to the applicant.) » . : ‘

 

 

 

Piease note: If there is more than one applicant, provide additional applicant details by clicking the "Add another
applicant” button below.

 

Name's (individual or company name in full) PILE-IT PTY LTD T/A NOOSA JETTY BUILDERS

 

 

 

 

 

 

For companies, contact name DANNY REED
Postal address PO BOX 299 NOOSAVILLE QLD 4566
Contact phone number 10408 137 526

 

 

Mobile number (non-mandatory)

 

 

Fax number (non-mandatory) 07 5474 3480

 

 

 

 

e-mail address (non-mandatory) noosajetty [email protected]

 

 

it. What is the nature of development proposed? (tick all applicable boxes)

O
O
w
O

 

material change of use of premises
building work
operational work

reconfiguring a lot

 

 

 

oh.

Page 4

,

0

 

[2. What type of approval.is being sought?

 

 

& development permit

LD preliminary approval
(1 both - provide details below

 

js. Is the application for a mobile and temporary environmentally relevant activity (ERA)? |

 

] No

(1 Yes - complete table A and then go to question 5

 

4. Location: of the premises (complete table B and/or table C as applicable. Identify each lot in a separate row)

 

 

Table B - street address/lot for the premises or street address/lot on plan for the land adjoining or adjacent to the
premises

 

 

 

Street Address Lot on plan
description
Local government area
Unit | Street Street name and official Post |i ot No Plan type (e.g. Logan,Cairns)
No. | No. suburb/locality name code ‘| and plan no. |
1 10 |Neptune Circ, Noosaville 4566 |361 |RP863246 Sunshine coast regional

 

 

 

 

 

 

 

 

 

(Street address / lot on plan

ml Street address / lot on plan for the land adjoining or adjacent to the premises (appropriate for development in
water e.g. jetty, pontoon)

 

Table C - premises coordinates (appropriate for development in remote areas, over part of a lot or in water ¢.9.
channel dredging in Moreton Bay)

 

Coordinates (note: place each set of

 

 

coordinates in a separate row) Zone Datum Local government
' - , ' reference area (If applicable)
Easting Northing | Latitude | Longitude
[1] GDA94
1 (J wess4
LJ other

 

 

 

 

 

 

 

 

 

 

5. Total-area of the premises on which the development is proposed (indicate hectares or m?)
630m2

6. Current usé/s of the premises (e.g.’vacant land, house, apartment building’ cane’ farm, etc.) -

 

 

 

 

 

1 |house

 

 

 

 

7. Provide a brief description of the proposal (e.g. six unit apartment building, 30 lot residential subdivision etc.)

 

timber jetty and pneumatic boat storage device

 

 

 

Application Derails - IDAS forn 1
Version 1.0 18 December 2009

 

Page 5

OO}

ie. Is owner's consent required for this application? (refer to notes at the end of this form for more information)

 

 

[J No

] Yes - complete either table D, table E or table F as applicable

 

Table D (note: do not complete this table if lodging the application on-line using Smart eDA)

 

 

Name of owner/s of the land _|diseeKeasby Sais ©. Meese? & Guedts 1. vest

 

Ve, the above-mentioned owner/s of the land, consent to the making of this application.
‘

Signature of owner/s of the land RA \,
x AN =

Date 29+ A. OV

Table E FO.

 

 

 

 

O

 

 

 

 

 

Name of owner/s of the land

 

 

(] The owner's written consent is attached or will be provided separately to the assessment manager

 

Table F OO.

 

 

Name of owner/s of the land

 

 

oO By making this application, |, the applicant, declare that the owner has given written consent to the making of
the application.

 

 

9. Does the ‘application involve a state resource? (e.g. the application involves state land, or taking quarry
materials: Refer, to the notes at the end of this form for more information)

 

 

No L]Yes - complete table G

 

 

10. Identify if any of the following apply to the premises (tick applicable box/es)

 

 

& adjacent to a water body, watercourse or aquifer (e.g creek, river, lake, canal) - complete table H
(__ onstrategic port land under the Transport Infrastructure Act 1994 - complete table |

L]__ ina tidal water area - complete table J

 

Table H Name of water body, watercourse or aquifer

 

1 |Noosa Waters Canal

 

 

 

 

11. Are there’any existing easements on the premises? (e.g. for vehicular access, electricity, overland flow,
water, etc.) : .

 

 

 

DJNo [Yes - ensure the type, location and dimension of each easement is included in the plans submitted

 

Application Details - IDAS form 1
Version 1.0 18 December 2009

 

Page 6

 

(IO

12. Does.the proposal include new building work or operational work on the premises? (including any
~ Services) .

 

 

LINo & Yes - ensure the nature, location and dimensions of proposed works are included in plans submitted

 

13. Is the payment ofa portable long service leave levy applicable to this application? (refer to the notes at the
« end Of this form for‘more information) ... .

 

]} No - Go to question 15 ( Yes

 

15, Has the local government agreed to apply a superseded planning scheme to this application under
$éction 96 of the Sustainable Planning Act:2009? aa

 

 

 

 

X] No

Ls Yes - provide details below

 

16. List below.all of the forms and supporting information that accompany this application (include all IDAS
forms, checklists, ‘mandatory supporting information etc. that will be submitted as part of this application. Note: this
question, does not.apply, for, applications made online using Smart eDA) ’

ote

 

 

¥

 

Method of lodgement to

Description of attachment or title of attachment
assessment manager

 

 

 

1 |Formé6 over the counter
2  |Checklist over the counter
3 | John Norden Plans over the counter

 

 

 

 

 

 

17, Applicant's declaration

 

 

da By making this application, | declare that all information in this application is true and correct (note: itis
unlawful to provide false or misleading information).

Ya PF

 

 

 

 

 

ai IDAS farm 4
Version 1.0 18 December 2009 |

Page 7

mr
CIO
Notes for completing this form

Question 8:

« Section 263 of the Sustainable Planning Act 2009 sets out when the consent of the owner of the land is required
for an application. Section 260(1)(e) of the Sustainable Planning Act 2009 provides that if the owner's consent is
required under section 263, then an application must contain, or be accompanied by, the written consent of the
owner, or include a declaration by the applicant that the owner has given written consent to the making of the
application.

« Owner's consent is not required for a mobile and temporary ERA.

Question 9:

e Section 264 of the Sustainable Planning Act 2009 provides that if a development involves a state resource, a
regulation may require the application to be supported by certain evidence prescribed under the regulation.
Schedule 14 of the Sustainable Planning Regulation 2009 prescribes the state resources for which evidence is
required to be given, and the evidence required, to support the application.

Question 13:
¢ The Building and Construction Industry (Portable Long Service Leave) Act 1991 prescribes when the portable
long service leave levy is payable.
e The portable long service leave levy amount and other prescribed percentages and rates for calculating the levy
are prescribed in the Building and Construction Industry (Portable Long Service Leave) Regulation 2002. O

Question 14:

* The portable long service leave levy need not be paid when the application is made, but the Building and
Construction Industry (Portable Long Service Leave) Act 1991 requires the levy to be paid before a development
permit is issued.

¢ Building and Construction Industry Notification and Payment Forms are available from any Queensland post
office or agency, on request from QLeave, or can be completed on the QLeave website at
www.gleave.aid.gov. au. For further information contact QLeave on 1800 803 481 or www.gleave.g d.gov.au.

Privacy -the information collected in this form will be used by the Department of Infrastructure and Planning (DIP) in
accordance with the processing and assessment of your application. Your personal details will not be disclosed for a
purpose outside of the DAS process, except where required by legislation (including the Right to Information Act
2009) or as required by Parliament. This information may be stored in a departmental database. The information
collected will be retained as required by the Public Records Act 2002.

 

OFFICE USE ONLY

 

 

 

 

 

Date received Reference numbers oO

 

 

NOTIFICATION OF ENGAGEMENT OF A PRIVATE CERTIFIER

 

 

 

 

 

. Council. | have been engaged as the private certifier for the
To: we aan an
building work referred to in this application.
Date of BSA Certification Building
Name : weg:
engagement license number classification/s

 

 

 

 

 

 

 

 

 

AD sp belais DAS form 7
Version 1018 December 2009 |

Page 8

CIO

QLEAVE NOTIFICATION AND PAYMENT (for completion by assessment manager of private certifier if applicable)

 

Date receipted
form sighted by|Name of officer who
assessment sighted the form

manager

QLeave Project |Amount

Number paid ($) Date paid

Description of the work

 

 

 

4

 

 

 

 

 

 

 

The Sustainable Planning Act 2009 (SPA) is administered by the Department of Infrastructure and Planning. This
form and all other required application materials should be sent to your assessment manager and any referral

agencies.

Ago jig - IDAS form +
version 1 0 18 December 2009

  

 

Page 9

 

 

 

 

 

 

 

 

 

 

Integrated Pay EnSScES RS DOD)

* =

 

Building or operational work assessable
against a planning scheme - IDAS form 6

(Sustainable Planning Act 2009 version 1.0 effective 18 December 2009)

This form must be completed for development applications for building works or operational work assessable against
a planning scheme.

You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without ail
necessary information and documentation will result in your application not being a properly made application.

For all development applications, you must:
¢ complete Applicant details - IDAS form 1

* complete any other forms relevant to your application

° provide any mandatory supporting information identified on the forms as being required to accompany your
application. .

All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable Planning
Regulation 2009.

This form can also be used for development on strategic portland under the Transport Infrastructure Act 1994.

 

4. What is the nature of the work that requires assessment against a planning scheme? (tick applicable box/es)

 

 

(2 building work - complete table A {XJ operational work - complete table B

 

Table B

What is the nature of the operational work made assessable in the planning scheme? (tick applicable box/es)

(J road works C stormwater () water infrastructure
(J drainage Works (J earthworks (J sewerage infrastructure
(] landscaping CD signage (J clearing vegetation under the planning scheme

CL other - please specify below

What type of approval is being sought? (if you have indicated multiple works in the above question, please
use an attachment to this form to detail each approval request)

[X} development permit (J preliminary approval (J both - specify below
{s the operational work necessary to facilitate the creation of new lots? (e.g. subdivision)
—X] No (1 Yes - specify the number of lots being created

Are there any current approvals associated with this application? (e.g. material change of use)

 

>] No {(1] Yes - provide details below ©

 

 

 

Department of Infrastructure.and Planning Im Gain

 

 

 

Page 10

LILO

 

 

 

 

 

2. What is the dollar value of the proposed building work? (inc GST, materials and labour)! $ 25,000

 

 

Building and operational work assessable against a planning scheme - IDAS form 6
Version 1.0 18 December 2009

Page 11

LI

 

3. Confirm the following mandatory supporting information accompanies this application

 

Confirmation

of lodgement Method of lodgement

 

Ali applications for operational works

 

site plans drawn to scale which show the following:

e the location and site area of the land to which the application relates
(relevant land)

e the-north point

* the boundaries of the relevant land

© the allotment layout showing existing lots, any proposed lots (including
the dimensions of those lots), existing or proposed road reserves, confirmed | over the counter
building envelopes and existing or proposed open space (note:
numbering is required for all lots)

any existing or proposed easements on the relevant land and their
function

e any access limitation strips

« all existing and proposed roads and access points on the relevant fand

 

a statement about how the proposed development addresses the local
government's planning schemes and any other planning documents {_] confirmed
relevant to the application

 

Applications for operational works involving earthworks (filling and excavating)

 

drawings showing:
existing and proposed contours
areas to be cut and filled
the location and level of any permanent survey marks or reference
stations used as datum for the works [_|confirmed
e the location of any proposed retaining walls on the relevant land and
their height
e the defined flood level (if applicable)
the defined fill level (if applicable)

 

Applications for operational works involving roadworks

 

drawings showing:

« existing and proposed contours

« the centreline or construction line showing chainages, bearings, offsets
if the construction line is not the centreline of the road and all!
intersection points

¢ information for each curve including tangent point chainages and
offsets, curve radii, arc length, tangent length, superelevation (if
applicable) and curve widening (if applicable)

¢ kerb lines including kerb radii (where not parallel to centreline) and
tangent point changes (where not parallel to centreline)

e edge of pavement where kerb is not constructed (_|confirmed

e position and extent of channelisation

location and details of all traffic signs, guideposts, guardrail and other

street furniture

pavement markings including details on raised pavement markers

catchpit, manhole and pipeline locations

drainage details (if applicable)

cross road drainage culverts (if applicable)

concrete footpaths and cycle paths

location and details for access points, ramps and invert crossings

changes in surfacing material

 

 

 

 

Building and operational work assessable against a planning scheme - IDAS form 6
Version 1.0 18 December 2009

 

Page 12

 

ooo

 

Confirmation
of lodgement

Method of iodgement

 

Applications for operational works involving stormwater drainage

 

drawings showing:

e existing and proposed contours
* drainage locations, diameters and class of pipe, open drains and

 

 

easements (_]confirmed
* manhole location, chainage and offset or co-ordinates and inlet and
outlet invert levels
e inlet pit locations, chainage and offset or co-ordinates and invert and
kerb levels
Applications for operational works involving water reticulation
drawings showing:
e kerb lines or edge of pavement where kerb is not constructed
e location and levels of other utility services where affected by water
reticulation works
pipe diameter, type of pipe and pipe alignment
water main alignments (1 confirmed

water supply pump station details (if applicable)
minor reservoir details (if applicable)

conduits

location of valves and fire hydrants

location of house connections (if applicable)
location of bench marks and reference pegs

 

Applications for operational works involving sewerage reticulation

 

drawings showing: .
location of all existing and proposed services

location of all house connection branches

kerb lines or edge of pavement where kerb is not constructed
chainages

design sewer invert levels

design top of manhole levels

type of manhole and manhole cover

pipe diameter, type of pipe and pipe alignment

location of house connections (if applicable)

sewer pump station details (if applicable)

location of all existing and proposed sewer lines and manhole locations

(confirmed

 

Applications for operational works involving street tighting

 

drawings showing:

location of all light poles and service conduits

location of all other cross road conduits

type of wattage and lighting

any traffic calming devices _

additional plans for roundabouts and major roads (if applicable)
details of any variations to normal alignment

details of lighting levels

[| confirmed

 

 

 

 

Building and operational work assessable against a planning scheme - IDAS form 6

Version 1.0 18 December 2009

 

Page 13

LOU

 

Confirmation
of lodgement

Method of lodgement

 

Applications for operational works involving public utility services

 

drawings showing:

any existing tight poles and power poles
any existing underground services
details of proposed services

alternation to existing services

(leonfirmed

 

Applications for operational works involving landscaping works

 

 

drawings showing:

the location of proposed pliant species

a plant schedule indicating common and botanical names, pot sizes
and numbers of plants

planting bed preparation details including topsoil depth, subgrade
preparation, mulch type and depth, type of turf, pebble, paving and
garden edge

the location and type of any existing trees to be retained
construction details of planter boxes, retaining walls and fences

the proposed maintenance period

irrigation system details

CJconfirmed

 

 

 

Notes for completing this form:
e This form can also be used for development applications for building works or operational works assessable
against the land use plan for Cairns airport land or Mackay airport land. Whenever a planning scheme is

mentioned, take it to mean the land use plan for the airport land.

Privacy -please refer to your assessment manager for further details on the use of information recorded in
this form. : ,

 

OFFICE USE ONLY

 

 

 

 

 

Date Received Ws‘ tue Reference Numbers leo { fo &t

 

 

 

The Sustainable Planning Act 2009 is administered by the Department of Infrastructure and Planning. This form and
O all other required application materials should be sent to your assessment manager and any referral agencies.

 

Building and operational work assessable against a planning scheme - IDAS form 6

Version 1.0 18 December 2009

 

Page 14

é

©

 

 

 

 

 

 

 

 

 

 

d| Development'Assessment'System COTS @ ©
i

ay oy

 

Development assessment checklist - IDAS
checklist 1

(Sustainable Planning Act 2009, version 1.0 18 December 2009)

This checklist applies to the carrying out of development generally.

You are not required to complete this checklist as part of your development application, however you may submit the
checklist with your application if you wish. The purpose of the checklist is to assist you in identifying:

* whether you need to make a development application for the proposed development
» if a development application is required, the relevant IDAS forms you need to complete as part of your application
+ whether you need to give a copy of your application to any referral agencies.

If your development involves a material change of use, reconfiguring a lot or operational works, it is recommended
that you complete Material change of use - IDAS checklist 2, Reconfiguring a lot - IDAS checklist 3 or Operational
works - IDAS checklist 4, as applicable.

\f you are unsure how to answer any questions on this checklist, phone or visit your local government, or go to the
Department of Infrastructure and Planning's website at www.dip.qld.gov.au.

All terms used in this checklist have the meaning given in the Sustainable Planning Act 2009 or the Sustainable
Planning Regulation 2009.

 

Part 1 - General questions

 

 

1.1 Have you received a referral agency response in relation to this proposed development prior to making
an application?

 

 

KxINo
(Yes

 

To assist you in preparing your application, completing Referral agency responses - IDAS checklist
6 is recommended

 

 

1.2 Do you wish the proposed development to be assessed against a superseded planning scheme?

 

 

i No

 

. You must complete Request to apply a superseded planning scheme - Sustainable Planning Act
OYes form 2 and give this notice to the relevant local government. If the local government agrees to
your request, details must be provided in Application details - IDAS form 1

 

 

 

4.3 Does the proposal involve removing quarry material from a watercourse or lake for which an allocation
notice is required under the Water Act 20007

EXJNo

LJ Yes } It is recommended that you complete part 2 of this checklist

 

 

 

 

 

1.4 ls any part of the proposed development intended to be carried out ona Queensland heritage place under
the Queensland Heritage Act 1992? ‘

>] No

ClYes } It is recommended that you complete part 3 of this checklist

 

 

 

 

 

 

 

GERD) Gin Wea

(CN Taslentstald

 

 

 

Page 15

LOU

 

1.5 Does the. proposal involve-development on-a local heritage place?

 

 

—XJ No

 

 

[Yes |- It is recommended that you complete part 4 of this checklist

 

 

1.6 Does the proposal involve an environmentally relevant activity, other than an agricultural ERA, a mining
activity or a chapter 5A activity?

 

 

KX] No

 

ClYes |- It is recommended that you complete part 5 of this checklist

 

 

 

1.7 ls any part of the development on strategic port land or airport land (other than development for a
material change of use that is inconsistent with the land use plan for the strategic port land or airport land)

 

 

) No

 

 

OYes |} It is recommended that you complete part 6 of this checklist

 

 

1.8 ls any part of the development on land below a high water mark: within the limits of a port under the

 

 

 

 

 

 

 

 

 

 

 

 

 

 

@ Transport Infrastructure Act 1994? . . “
—X] No
(Yes |} It is recommended that you complete part 7 of this checklist
1.9 Is any part of the premises designated for community infrastructure?
{XJ No
LJYes |} It is recommended that you complete part 8 of this checklist
1.10 Does the proposal involve the establishment or expansion of a waste water disposal system? .
XJNo ;
LJ Yes | It is recommended that you complete part 9 of this checklist

 

 

4.11 Is the development on land that adjoins a declared fish habitat area under the Fisheries Act 19947:

 

 

&) No
OO Yes |- It is recommended that you complete part 10 of this checklist

 

 

 

 

Privacy - please refer to your assessment manager for further details on the use of information recorded in
this checklist.

Disclaimer:
While the Department of Infrastructure and Planning (DIP) believes that this information contained on this
checklist and provided as part of this process will be of assistance to you, it is provided on the basis that you will
not rely on the information without first making your own enquiries regarding the interpretation and application of
the applicable legislation to your circumstances.

To the full extent permitted by law DIP expressly disclaims all liability (including but not limited to liability for
negligence) for errors or omissions of any kind or for any loss (including direct and indirect losses), damage or
other consequence which may arise from your reliance on this process and the information contained on this
checklist.

 

Development application assessment checklist - IDAS checklist 1
Version 1.0 18 December 2009

 

Page 16

OU

 

OFFICE USE ONLY

 

Date received

 

 

 

Reference numbers

 

 

 

 

The Sustainable Planning Act 2009 is administered by the Department of Infrastructure and Planning.

 

Development application assessment checklist - IDAS checklist 1

Version 1.0 18 December 2009

 

Page 17

 

Sunshine Coast ‘Tanp use SECTION FEES

Regional Council

 

CIVICA TYPE RECEIPT TYPE
SALE OF DOCUMENTS
Superseded Planning Scheme Documentation 520:
Copy of Permit/Approval Letter 110
The Noosa Plan Documentation 111

APPLICATION FEES
Material Change of Use - Code/lmpact MCU

 

 

 

 

 

 

 

 

/ Consistent 521
" Inconsistent 521
. Assessment under Superseded Planning Scheme . 521
, ’ Modification to a Development Permit MOD DP : 521
Extension of a Currency Period 521
Lot Reconfiguration RECONFIG 521
Bldg Work assessable against the Planning Scheme 521
) PBE LODGEMENT REVIEW -
Half Hour 522
One Hour / 522
ADVERTISING .
+ Purchase Advertised Applications . 523
JETTIES
< Jetty Application Fee 9 20 524
JettyBond ~ oo 51
(Category 4)
BONDS :
Performance Bond 51
(Category 9)
SEARCH FEE
Search of Land Use Section file 412
Liquor Licensing Request . 113
e ; TOTAL $ Weare
NAME: The Gry Kesh,
ADDRESS: Po  8so “1;
: MEA Mov L~ | LS+F
FILE NO: tof bbl DATE: | {if Siro
RECEIPT NO: bas Ss 2 \3 _ Signature of TP Officer: [2% Kowa
AUTHORITY NO: { if
[4/2212[ Cet (i

Page 18

 

CALCULATION OF FEES

 

APPLICATION

FEE

TOTAL
FEES

 

MCU - CODE ASSESSMENT
Details of Development

Consistent 1.0
Inconsistent 3.0

FEE CALCULATION

 

MCU - IMPACT ASSESSMENT
Details of Development

Consistent 1.0

Inconsistent 3.0
>»

FEE CALCULATION

«

 

OPERATIONAL WORKS
Details of Development

FEE CALCULATION

 

 

 

TOTAL FEES

 

 

@'

Page 19

 

| beo/0h

 

 

le ONDOM _

 

 

 

 

Soe D UREN)
WZ XON Odd J SNVERY FUROUIOY
EZBic] URIBE, OL GINS

sueeurtirg uOyeeq WD | UTMONIS
228 E9Z OTO NOV 4

 

 

 

 

—— 7

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

+

/

 

 

 

 

 

 

 

 

 

aus / NWId aLIS

 

 

 

 

 

LOVE HOUVN ALNNOS
VAASM HSvd
SYZTESB dy

LSE LOT

 

NOLLATYDS30

 

ALuSadOUd Twas

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TI¥M JO dOL

 

 

 

 

 

 

 

 

 

 

 

TIVM JO dOL

 

seqeloossy 9
uspJON uYOr ff : Z
V/L QLT Ald YNTEEVY Zz z
SYS.LVM VWSOON : x 5
LINDYIO ANNLdSN _ te _ LP .—¢
OL'ON Vo ONS HOWS SMBYOS
LSE LOT HE 107 am TSALS SSTINIVIS OML
ALLS? GaSOdONd| . 2 | = raya OMH pial Sb BE
AGSSND BP as i ———CSOSSS—~S~S~«S CB
TEAS wey SO ;
Oeveriea Z0 sean | Sez ad 1 So S OMgvs FWXALOIO
CREEL ON eouRST) : : IN OALVIOOSSV any ONIHOild
SYy3aqiing ANVONNOS ALNSEOME | 8 3NOLS 4O NVI 398 OL
ALiSr VSOON s a te SS = \
SV ONIOVELL \ , 4
GLT Ald Lrsd cyAeneviss zene | | Las
on r
om 6 LINONID ANNLd3N
Z NOILLWAATA ; = A
. L NOLLVAS13
8
3000 ONMd - 6512 Sv HLM RRR IGG RRRRRIIIR RC
SONVCUOOOW NI GSTIVISN 39 TIVHS Sd TV
COOMONWH OSAO¢ddY 38 TIVHS Sid Ty
‘Sad
“OHV 90 TS MALY ANNININ ]
Cx x x i
i OHY OF Ta
OHY OL TY | x30 OHV 0°L Ta 2030

 

 

OHV 00° TY TSAS1 GOO1S Gaduoosy WANIXYN

 

 

 

 

Page 20

 

HOOKER:

75x 38 HWO
1/75 x Noi4 TYPE 17
STAINLESS STEEL
SCREWS G 450 CRS

  
 

   

JETTY USE:
SINGLE USER, PRIVATE
NO VEHICULAR ACCESS

WALKWAY DECK VERTICAL
DESIGN LIVE LOAD - 2.0 kPa
MAXIMUM MOORED VESSEL - 5m
BERTHING VELOCITY - 0.5 m/sec

    

150 x 75 HWD.
216 SIS
2M16SS

PRES:
@ 200 HO MARINE HWO POLES

WITH AS 2156 - PILING COOE
200 x 75 HWD

Bells \

150 x 75 HWD.

10 PL 200 x 75 HWD

ANGLE BRACKET
216 S/S TO EACH MEMBER

 

2M16 SS

z 150 x 75 HWOD

150 x 75 HWD

pera 3 \

NOTES:

1. UNLESS NOTED OTHERWISE ALL TIMBER SHALL BE
DURABILITY CLASS 1 OF APPROVED SPECIES AND HAVE
A STRESS GRADE OF F14 MIN.

2. UNLESS NOTED OTHERWISE ALL CONSTRUCTION SHALL
COMPLY WITH THE ENVIRONMENTAL PROTECTION AGENCYS'
OPERATIONAL POLICY - "BUILDING AND ENGINEERING
STANDARDS FOR TIDAL WORKS.

3. ALL STAINLESS STEEL BOLTS, RODS, ETC., SHALL BE
APPROVED MARINE GRADE 316. ALL OTHER STEELWORK
INCLUDING NUTS, BOLTS, WASHERS, SCREWS, NAILS, ETC.,
SHALL BE HOT DIPPED GALVANISED OR STAINLESS STEEL.

4. TOP OF PILES SHALL BE SEALED AND FULLY CAP FLASHED
OR RINGED.

5. DIMENSIONS AND LEVELS SHALL NOT BE SCALED FROM
THE DRAWINGS.

   

LOT 361
No.10

 
 

PROPOSED JETTY

NEPTUNE CIRCUIT
NOOSA WATERS

PTY LTD T/A

John Norden
& Associates

   
   

ACN 010 263 877
Structural / Civi Design Engineers

 

Used in these records

About this file

File size
1.2 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

10_0661 - Op Works - TransportType 5 [As Published].pdf · 1.2 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.