Council archive · source document
Delegated Report Request to change development approval OPW12 0139 01 - 1032383 [As Published] · OPW12/0139.01
REPORT COVER SHEET
PLANNING
APPLICATION NO: OPW12/0139.01
AUTHOR: Mark Lewis
PROJECT DIRECTOR: Mark Lewis – Senior Engineering Officer
TO BE COMPLETED BY PROJECT MANAGER / REPORT AUTHOR:
Is the application required to be decided by the Iconic Panel?: Yes / No
Is referral required to the Councillor Delegated Sign Off Mailbox?: Yes / No
Has a site inspection been undertaken?: Yes / No
Has Infrastructure Policy Branch been notified and a request for an Infrastructure
Contributions calculation been made?: Yes / No
Material to give to the Project Director
□ A copy of any previous edited version of the report
□ Plans and documents recommended to become Approved Plans and Documents
□ Location plan / aerial photographs at appropriate scales
□ Copy of all specialist advice and/or memos (or alternatively tagged in the file)
□ Site photos (where obtained)
□ Copy of all referral agency responses (or alternatively summarised in the body of the
report)
□ Copies of all adjoining approvals and past approvals for the site as may be relevant
PLANNING OFFICER MANAGER
Signature:
Signature:
Position: Position: Senior Engineering Officer
Date: Date: 29 September 2014
Document Set ID: 19819152
Version: 1, Version Date: 03/11/2014
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Delegated Report Request to change development approval OPW12 0139 01 - 1032383 [As Published].pdfRelated documentApplication case desk ↗
About this file
- File size
- 121 KB (small file)
- File type
No other editions are linked here.