Original source · versioned page text
Attachment 7 - Civil engineering report and plans
Plans and drawings: the text below has words only, no drawings.
Original PDF page 3, section 1. The text section number identifies this passage in the reader.
STP CONSULTANTS
Contents
1. Introduction ........................................................................................................................................................3
2. Site Description ..................................................................................................................................................3
2.1 Easements..................................................................................................................................................3
2.2 Proposed Development .............................................................................................................................4
3. Stormwater Management Plan .........................................................................................................................5
3.1 Flood Studies..............................................................................................................................................5
3.2 Stormwater Detention................................................................................................................................5
3.3 Stormwater Quality ....................................................................................................................................5
3.4 Site Stormwater Drainage .........................................................................................................................5
3.5 Existing Stormwater Infrastructure...........................................................................................................5
3.6 Site Earthworks ..........................................................................................................................................7
4. Water Supply and Sewerage ..............................................................................................................................7
4.1 Water Connection ......................................................................................................................................7
4.2 Sewer Connection ......................................................................................................................................7
5. Roadworks and Traffic Impact ..........................................................................................................................8
5.1 Parking and Access ...................................................................................................................................8
6. Conclusions ......................................................................................................................................................10
7. Appendix A – Schematic Stormwater Layout ................................................................................................11
8. Appendix B – Access Track Crossing.............................................................................................................12
Civil Engineering Report | STP21-1452 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.