Original source · versioned page text
Attachment 7 - Civil engineering report and plans
Plans and drawings: the text below has words only, no drawings.
Original PDF page 5, section 1. The text section number identifies this passage in the reader.
STP CONSULTANTS
Emt A SP1975
75
Figure 2.2 – Existing access easements (Qld Globe)
2.2 PROPOSED DEVELOPMENT
The proposed development consists of demolition and reconstruction of accommodation wings, administration
building, and a community centre as depicted in Figure 2.3 below.
EXISTING TRACK CROSSING
REFUSE COLLECTION AREA STORMWATER OUTLET
REFER TURNING PATHS
SERVICE DELIVERY AREA
REFER TURNING PATHS
Figure 2.3 – Proposed site layout Stages 1, 2, 3A and 3B (Enrich Architecture)
Civil Engineering Report | STP21-1452 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.