Dennis - IDAS Form 23 · OPW13/0583

of 5

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Department of State Development, Infrastructure and Planning

IDAS form 23—Tidal works and development within
coastal management districts

(Sustainable Planning Act 2009 version 3.0 effective 1 July 2013)

This form must be used for development applications for:

© operational work that is tidal works (including prescribed tidal works) or operational work within a coastal
management district (mentioned in the Sustainable Planning Regulation 2009, schedule 7, table 2, item 13)

e material change of use that requires referral under the Sustainable Planning Regulation 2009, schedule 7, table 3,
item 5 because it involves:

- operational work carried out completely or partly in a coastal management district; or

- building work carried out completely or partly in a coastal management district that is the construction of a new
premises with a gross floor area (GFA) of at least 1000m? or the enlargement of the GFA of an existing
premises by more than 1000m?

e reconfiguring a lot that requires referral under the Sustainable Planning Regulation 2009, schedule 7, table 2, item
14 because the land is situated completely or partly in a coastal management district or the reconfiguration is in
connection with the construction of a canal

e building work that requires referral under the Sustainable Planning Regulation 2009, schedule 7, table 1, item 11
because it is on land completely or partly seaward of a coastal building line.

You MUST complete ALL questions that are stated to be a mandatory requirement unless otherwise identified on this
form.

Notes for completing this form

For all development applications you must:

e complete /DAS form 1—Application details

® complete any other forms relevant to your application

e provide any mandatory supporting information identified on the forms as being required to accompany your
application.

Attach extra pages if there is insufficient space on this form.

All terms used on this form have the meaning given in the Coastal Management and Protection Act 1995, the Coastal
Protection and Management Regulation 2003, the Sustainable Planning Act 2009 (SPA) or the Sustainable Planning
Regulation 2009.

 

This form can also be completed online using MyDAS at www.dsdip.gid.gov.au/MyDAS

 

 

Mandatory requirements

 

 

1. Confirm the following mandatory requirements accompany Confirmation of Method of
this application lodgement lodgement

 

Written description of the proposal, including a report that addresses any Confirmed
relevant policies.

 

 

 

 

 

2. __ What Is the nature of the work or development proposed by the application? (Tick all applicable boxes.)

 

 

Operational work—complete table A [_] Material Change of Use—complete table B
Cc Reconfiguring a Lot—complete table C oO Building Work—complete table D

Great state. Great opportunity.

 

Government
Full text of the other 4 pages

Page 2

 

Table A—Operational Work

 

 

Does the operational work involve the following? (Tick ail applicable boxes.)

a) Tidal works as defined under the Coastal Protection and Management Act 1995 (e.g. basins, breakwater, bridges,
boat ramps, decks and boardwalks, docks, dockyards, groynes, jetties, marinas, pipelines, pontoons, powerlines,
seawalls, slips, training walls, wharves and the reclamation of land under tidal water)?

L] No Yes

If yes, what is the purpose?

 

 

 

Pontoon System & Boat Ramp

 

Private purpose (e.g. private pontoon)
O Another purpose (e.g. commercial marina)

Does the tidal works also require resource allocation under the Coastal Protection and Management Act 1995?

No [1 Yes

If applicable what is the estimated value of the proposed works?

 

 

 

 

b) Interfering with quarry material as defined under the Coastal Protection and Management Act 1995 (e.g.
excavating or moving sand, gravel or any other earth material on state coastal land such as roads, esplanades,
parks or unallocated state land) on state coastal land above high-water mark.

No C] Yes
If yes, which of the following?

oO Works for coastal management purpose involving beach nourishment, dune fencing, revegetation of dunal areas
with endemic native plants, or stinger net enclosures.

oO For purposes directly related to the provision of lifesaving or rescue services by a volunteer community
organisation.

oO For other purposes (please state below).

 

 

 

If applicable what is the estimated value of the proposed works?

 

 

 

 

c) Disposing of dredge spoil or other solid waste material in tidal water?
No (1 Yes

If applicable what is the estimated value of the proposed works?

 

 

 

 

d) Constructing an artificial waterway?
No oO Yes

If applicable what is the length of the waterway?

 

 

 

 

e) Removing or interfering with coastal dunes on land, other than state coastal land, that is in an erosion prone area
as defined in the Coastal Protection and Management Act 1995 and above high water mark (e.g. lowering dune
vegeiation on freehold and leasehold land)?

No C1 Yes

If applicable what is the estimated value of the proposed works?

 

 

 

 

 

 

IDAS form 23—Tidal works and development within
coastal management districts
Version 3.0—1 July 2013

Page 3

 

Table B—Material change of use

 

a) Does the material change of use involve the following? (Tick all applicable boxes.)
oO Operational work carried out completely or partly in a coastal management district
b) Does the material change of use involve building work carried out completely or partly in a coastal management

district that is:

O the construction of new premises with a gross floor area of at least 1000 m”

L] the enlargement of the gross floor area of existing premises by more than 1000 m?

 

 

Table C—Reconfiguring a lot

 

a) Does the reconfiguring a lot involve the following? (Tick all applicable boxes.)

OJ Land situated completely or partly in a coastal management district

Oo The construction of a canal
b) How many lots will be created?

 

 

 

 

 

 

Table D—Building work

 

a) _ Is the building work on land completely or partly seaward of the coastal building line under the Coastal Protection

and Management Act 1995?

L] No CL yes

 

 

3. _ Is the tidal works located within a local government tidal area? (Tick all applicable boxes)

 

L] No

Yes—provide details below

 

 

Local government:

SUNSHINE COAST LECIONAL Coun UL

 

 

Mandatory supporting information

 

 

 

 

4. Please provide the following information Confirmation of Method of
lodgement lodgement

For all applications

A statement addressing the relevant part(s) of the State Development Confirmed

Assessment Provisions (SDAP). Ll Not applicable

 

For applications involving operational work that is tidal works

 

A copy of the certificate of title for the land (including tidal land) that
would abut or adjoin the proposed works.

Confirmed
L] Not applicable

 

Plans showing:

e the real property description and boundaries of the land (including
tidal land) that would abut or adjoin the proposed works

e the proposed works (including existing works to be removed) in
relation to relevant tidal planes (e.g. mean high water springs)

e the slope angles of the beds and banks of the tidal area and the
finished levels of the proposed works.

Confirmed
LJ Not applicable

 

 

For tidal work that will occupy a navigable waterway provide a water
allocation area plan providing evidence that the proposed work will not
prejudice the access rights of adjoining property owners.

Confirmed
L_] Not applicable

 

 

 

 

IDAS form 23—Tidal works and development within
coastal management districts
Version 3.0—1 July 2013

Page 4

 

Details of the largest vessel, if any, to be moored at the structure. Confirmed
1] Not applicable
For prescribed tidal works, details of how the proposed work addresses Confirmed

the IDAS code for prescribed tidal work in the Coastal Protection and licabl
Management Regulation 2003, schedule 4A. L] Not applicable

 

 

 

 

 

 

If applicable, certification that the design of tidal works is suitable for Confirmed
intended use, signed by a Registered Professional Engineer of C] Not applicable
Queensland (or equivalent).
For applications involving material change of use
Plans certified by a registered professional engineer of Queensland C Confirmed
(RPEQ) or a registered surveyor showing: E] Not applicable
e the real property description and boundaries of the land
e the proposed works in relation to the location of the coastal

management district and coastal hazards.
For applications involving reconfiguring a lot
Plans certified by a registered surveyor showing: CL] Confirmed
e the real property description and boundaries of the land CO Not applicable

e The location of the coastal management district and coastal hazards
in relation to the land being reconfigured

e Any land being surrendered as a separate lot on the plan of
subdivision.

 

For applications involving building works seaward of a coastal building line

 

Plans certified by a registered professional engineer of Queensland Confirmed
(RPEQ): LJ Not applicable
e the real property description and boundaries of the land

e the proposed works in relation to the location of the coastal building
line.

 

 

 

 

 

Notes for completing this form

e Please ensure all applicable fees are paid, noting that referral agency fees are to be paid to the Department of
Environment and Heritage Protection.

e For an application requiring referral to the Department of Transport and Main Roads (DTMR), it is recommended
that the applicant contact DTMR to ensure that required information for assessment of the application is provided.

Privacy—Please refer to your assessment manager, referral agency and/or building certifier for further details on the
use of information recorded in this form.

 

OFFICE USE ONLY

 

 

Date received Reference numbers

 

 

 

 

 

 

The Sustainable Planning Act 2009 is administered by the Department of State Development, Infrastructure and
Planning. This form and all other required application materials should be sent to your assessment manager and any
referral agency.

Department of State Development, Infrastructure and Planning

PO Box 15009 City East Qld 4002 IDAS form 23—Tidal works and development within
' as 74 6B) coastal management districts
[email protected] Version 3.0—1 July 2013

www.dsdip.qid.gov.au

Page 5

ATTACHMENT

IDAS FORM 23 — Tidal works and development within coastal management districts
4. — STATE DEVELOPMENT ASSESSSMENT PROVISIONS (SDAP)
The proposal is within a natural waterway and does not require dredging or the removal of

any marine vegetation. Further, it does not require any foreshore stabilisation works and is
not within a Wild River or a Marine Park.

Used in these records

About this file

File size
481 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Dennis - IDAS Form 23.pdf · 481 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.