Skip to the record
Every meeting, every word.

Original source · versioned page text

UPDATED DA - Attachment 10 Stormwater Management Plan

of 17

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
                                                                                                                                                                                                                                                                                                                       JOINS SHEET C201
                                                                                                                                                                                                                                                                                                                                                                                                       IT IS THE RESPONSIBILITY OF THE
                                                                                                                                                                                                                                                                                                                                                                                                   CONTRACTOR TO CONTACT THE RELEVANT
                                                                                                                                                                                                                                                                                                                                                                                                  AUTHORITIES TO CONFIRM THE LOCATION OF
                                                                                                                                                                                                                                                                                                                                                                                                     ALL EXISTING SERVICES PRIOR TO THE
                                                                                                                                                                                                                                                                                                                                                                                                       COMMENCEMENT OF EXCAVATION




                                                                                                                                                                                                PUBLIC ACCESS TO RESOURCE RECOVERY




                                                                                                                                                                                                                                                                                                                                                                                      3.0
                                                                                                                                                                                                WASTE VEHICLE ACCESS ONLY




                                                                                                                                                                                                                                                                                                                                                                                      3.5
                                                                                                                                                                                                                                                                                                                                               DELIVERY / COLLECTION ZONE




                                                                                                                                                                                                                                                                                                                                                                                                                                                              JOINS SHEET C201
                                                                                                                                                                                                                                                            7.0
                                                                                                                                                                                                                                                      PUBLIC ACCESS
                                                                                                                                                                                                                                                      TO RESOURCE
                                                                                                                                                                                                                                                        RECOVERY
                                                                                                                                                                                                                                                                                                                                                       TRANSFER STATION BUILDING
                                                                                                                                                                                                                                                                                                                                                           [NOM. FFL RL 15.500]




                                                                                                                                                                                                                                                                                      DRIVE THRU RESOURCE
                                                                                                                                                                                                                                        5.0




                                                                                                                                                                                                                                                             12.0 (4 x 3.0 m LANES)
                                                                                                                                                                                                                                      WASTE




                                                                                                                                                                                                                                                                                          SORTING AREA
                                                                                                                                                                                                                                     VEHICLES
                                                                                                                                                                                                                                       ONLY




                                                                                                                                                                                                                                                                                                                               LOWER HARDSTAND AND RESOURCE RECOVERY BIN PAD
                                                                                                                                                                                                                                                                                                                                    WASTE AND STAFF VEHICLE ACCESS ONLY
                                                                                                                                                                                                                                                                                                                                                                                                                22 x CARPARKING BAYS
                                                                                                                                                                                                                                                                                                                                                                                                                (5.4 m x 2.6 m)
                                                                                                                                                                                                                                                                                                                                         2.6




                                                                                                                                                                                                                                                                                                                                                 5.4
                                                                                                                                                                                                                                                                                                                                                       INDICATIVE BIO-BASIN LOCATION
                                                                                                                                                                                                                                                                                                                                                       [NOM. 94.0 m² FILTER AREA]
JOINS SHEET C203




                                                                                                                                                                                                                                                                                                                                                                                                  Check all dimensions before commencement of work.
                                                                                                                                                                                                                                                                                                                                                                                                  Check Site boundary dimensions from the Title plans
                                                                                                                                                                                                                                                                                                                                                                                                  Check Building Boundary clearances by set out.
                                                                                                                                                                                                                                                                                                                                                                                                  Notwithstanding the information supplied on this drawing,
                                                                                                                                                                                                                                                                                                                                                                SCALE 1:250 (A1) - 1:500 (A3)     the location, depth and extent of underground or overhead
                                                                                                                                                                                                                                                                                                                                                                                                  services are to be confirmed and protected on site by the
                                                                                                                                                                                                                                                                                                            JOINS SHEET C203                                                                      contractor prior to commencement of works.

                                                                                                                                    Approved
Checked -               CJT                                                                                                                                                            Drawing title -                                          Project -   DOONAN RESOURCE                                                     Site -                                                          Project No.     244035       Sheet No.             C202
Design -              CJT          Drawn -     CJT
                                                                                                                                                                                       GENERAL ARRANGEMENT SHEET 2                                          RECOVERY REDEVELOPMENT                                              561 EUMUNDI-NOOSA ROAD,                                         Digital Ref :   C200 SITE LAYOUTS        Issue :        A
Scales -              AS SHOWN                                                                                                      COVEY ASSOCIATES PTY LTD   124 DUPORTH AVENUE                                                               Client -
                                                                                                                                                                                                                                                            NOOSA SHIRE COUNCIL                                                 DOONAN                                                            This Document is copyright and shall not be copied
                                                                A   10.02.2025   PRELIMINARY ISSUE                       CJT
                                                                                                                                    ABN 59 137 305 992         PO BOX 16                                                                                                                                                                                                                          without written approval, nor shall it be used except
Document Stage -                   PRELIMINARY                                                                                      (07) 5443 7777             MAROOCHYDORE QLD 4558                                                                                                                                                                                                              for the Development and the Site Specified.
                                                               Issue Date                      Description              By          [email protected]
                   c:\12dS\data\12DSERVER\244035_3605\Design (Covey)\Drawings - Concept Design\Uncontrolled\C200 SITE LAYOUTS.dwg                                                                                                                                                                                                                                                               Plot 11 February 2025 - 8:55 PM
Log in to download the original file

UPDATED DA - Attachment 10 Stormwater Management Plan.pdf · 7.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.