Original source · versioned page text
UPDATED DA - Attachment 10 Stormwater Management Plan
Plans and drawings: the text below has words only, no drawings.
STORMWATER MANAGEMENT PLAN
Client: Noosa Shire Council Location: Doonan
CONTENTS
1.0 INTRODUCTION 4
2.0 SITE DESCRIPTION 4
2.1 Site Location 4
2.2 Existing Land-use, Topography and Drainage 5
2.3 Proposed Land-use 5
3.0 STORMWATER QUANTITY 6
4.0 STORMWATER QUALITY 7
4.1 Water Quality Monitoring 7
4.1.1 Treatable Areas 7
4.1.2 Scenario Method 7
4.2 MUSIC Model Parameters 8
4.3 Proposed Stormwater Treatment Train 9
4.4 MUSIC Modelling Results 9
5.0 MAINTENANCE PERIOD 10
5.1 Bioretention Basins 10
5.1.1 ‘Construction Period’ Maintenance Requirements 10
5.1.2 ‘Maintenance Period’ Maintenance Requirements 10
5.1.3 ‘Operational Period’ Maintenance Requirements 10
6.0 CONCLUSION 11
7.0 REFERENCES 12
2 Project No: 244035
M25-0042 Rpt Issue A
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.