Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

UPDATED DA - Attachment 10 Stormwater Management Plan

of 17

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
                                    STORMWATER MANAGEMENT PLAN

Client: Noosa Shire Council                                               Location: Doonan

CONTENTS


1.0    INTRODUCTION                                                                      4

2.0    SITE DESCRIPTION                                                                  4

       2.1    Site Location                                                              4

       2.2    Existing Land-use, Topography and Drainage                                 5

       2.3    Proposed Land-use                                                          5


3.0    STORMWATER QUANTITY                                                               6

4.0    STORMWATER QUALITY                                                                7

       4.1    Water Quality Monitoring                                                   7
              4.1.1   Treatable Areas                                                    7
              4.1.2   Scenario Method                                                    7

       4.2    MUSIC Model Parameters                                                     8

       4.3    Proposed Stormwater Treatment Train                                        9

       4.4    MUSIC Modelling Results                                                    9


5.0    MAINTENANCE PERIOD                                                               10

       5.1    Bioretention Basins                                                       10
              5.1.1   ‘Construction Period’ Maintenance Requirements                    10
              5.1.2   ‘Maintenance Period’ Maintenance Requirements                     10
              5.1.3   ‘Operational Period’ Maintenance Requirements                     10


6.0    CONCLUSION                                                                       11

7.0    REFERENCES                                                                       12




                                                2                       Project No: 244035
                                                                       M25-0042 Rpt Issue A
Log in to download the original file

UPDATED DA - Attachment 10 Stormwater Management Plan.pdf · 7.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.