Our Ref: 20240911
Council Ref: MCU24/0153 and OPW24/0202

10 July 2026


         Noosa Council
         PO Box 141
         Tewantin QLD 4565
         Sent via email: [email protected]

         Attention: Development Assessment Team


Dear Sir/Madam,

REQUEST FOR MINOR CHANGE TO DEVELOPMENT APPROVAL -
DEVELOPMENT PERMIT FOR A MATERIAL CHANGE OF USE (MULTIPLE
DWELLING - 6 SMALL DWELLINGS) AND DEVELOPMENT PERMIT FOR
OPERATIONAL WORKS (ENGINEERING AND LANDSCAPE WORKS) AT 51
ELANDA STREET, SUNSHINE BEACH (LOT 403 RP48112)

On behalf of the applicant, please find enclosed a request for a Minor Change to development approval to
be assessed by Noosa Council.

This request for a Minor Change under s78 of the Planning Act 2016 is in accordance with the definition
of a Minor Change (Schedule 2 of the Planning Act 2016) and it is considered that the change does not
result in a substantially different development. In support of the application, please find attached:

    ●​   Copy of the Negotiated Decision Notice;
    ●​   Planning Act Form 5;
    ●​   Landowner Consent;
    ●​   Revised Architectural Plans prepared by Archend.

Payment of the relevant fee will be made once a reference number and confirmation of fee amount has
been received.

PROPOSED CHANGES TO APPROVAL
The proposed development seeks to undertake modifications to the existing development approval due to
design refinement, construction cost efficiency and building code compliance matters. A summary of the
key changes are clouded on the plans, and detailed below:

    ●​ Site cover: 45% to 44.6%;
    ●​ Landscaping: 35% on-site landscaping has been maintained as approved. It is noted that only
       60% soft landscaping is required of the 35%. The approval achieved 67%; as a result of the
       proposed changes, a slight reduction of 7.9m2 down to 63% is proposed. Despite the reduction,
Full text of the other 3 pages

Page 2

        the total percentage of soft landscaping exceeds the preferred 60%. Part of the Unit 1 landscape
        courtyard has been changed to hardscape due structural slab thickness requirements.
   ●​   Gross floor area: 75% (565m2);
   ●​   Basement level: unit storage has been introduced under the ramps;
   ●​   Inclusion of new bike parking and mailbox area in front of visitor parking;
   ●​   Ground, Level 1 and Level 2 Floor Plans: slight internal floor plan adjustments;
   ●​   The Level 1 balcony has been extended towards the north-eastern rear boundary by 1m,
        achieving a 7m setback in lieu of the preferred 8m. This is considered to achieve a better
        outcome that highlights a stepped design without affecting the building form;
   ●​   Ground level: Retaining walls around the pool (refer to the renders on the final two pages for the
        design variation), the mailbox, and the plenum for the basement mechanical ventilation);
   ●​   Roof terrace level:
             ○​ A fire stair / gate / service access has been introduced at the front of the building. This
                 has resulted in very minor changes to the shape of the roof terrace;
             ○​ The setback to the outermost projection is maintained.
             ○​ Glazed clear balustrades for fall protection for the stairs servicing the private pools is
                 proposed to ensure views from northern neighbours remain unobstructed. This is a
                 building code requirement.
   ●​   Modifications to the external appearance. Notably, the western (street facing) facade has been
        updated to include breeze blocks for the required ventilation in the services room and to improve
        airflow on the upper levels;
   ●​   Additional earthworks to accommodate the car stacker;
   ●​   Civil and landscape designers have been engaged and can complete updated design within 1
        week of Council’s confirmation of minor change support.

Changes to Conditions - Material Change of Use

Condition 3

Condition 3 of the approval provides a list of the approved plans relating to the development. It is
requested that the submitted plans are included in the Approved Plans Table.

                                            Approved Plans
     Plan No.        Rev.                           Plan Name                                    Date
         08            F      Site Plan, prepared by Archend                                    08.07.26
        08-A           F      Site Plan - Site Cover, prepared by Archend                       08.07.26
         11            F      Site Plan - Landscaping Areas prepared by Archend                 08.07.26
         15            F      Floor Plan - Basement, prepared by Archend                        08.07.26
         16            F      Floor Plan - Ground Floor, prepared by Archend                    08.07.26
         17            F      Floor Plan - Level 1, prepared by Archend                         08.07.26
         18            F      Floor Plan - Level 2, prepared by Archend                         08.07.26
         19            F      Floor Plan - Roof, prepared by Archend                            08.07.26
         20            F      Floor Plan - Ground GFA, prepared by Archend                      08.07.26
         21            F      Floor Plan - Level 1 GFA, prepared by Archend                     08.07.26
         22            F      Floor Plan - Level 2 GFA, prepared by Archend                     08.07.26
         23            F      North Elevation, prepared by Archend                              08.07.26
         24            F      South Elevation, prepared by Archend                              08.07.26
         25            F      West and East Elevations, prepared by Archend                     08.07.26
         26            F      Section A, prepared by Archend                                    08.07.26
         27            F      Section A2, prepared by Archend                                   08.07.26
         28            F      Section B and B2, prepared by Archend                             08.07.26



                                                                                                           2

Page 3

        29              F     Renders - Design Variation, prepared by Archend                    08.07.26
        30              F     Renders - Design Variation 2, prepared by Archend                  08.07.26

Changes to Infrastructure Charges Notice

Not required.

JUSTIFICATION FOR PROPOSED CHANGE TO APPROVAL
The proposed change is considered to satisfy the definition of a Minor Change, as the proposed change
does not cause:
   ●​ The inclusion of prohibited development in the application;
   ●​ Referral to a referral agency if there were no referral agencies for the development application;
   ●​ Referral to extra referral agencies;
   ●​ A referral agency, in assessing the application under s55(2), to assess the application against, or
       have regard to, a matter, other than a matter the referral agency must have assessed the
       application against, or had regard to when the application was made; or
   ●​ Public notification to be triggered.

In determining whether the proposed Minor Change would result in a substantially different development,
the assessment manager must consider the individual circumstances of the development, in the context
of the change proposed. A change may be considered to result in a substantially different development if
any of the following criteria are not met for the proposed change:

4.1 Involves a new use.

The requested Minor Change does not involve a new use for the site. The proposal will be maintained for
a Multiple Dwelling (6x units <100m2).

4.2 Results in the application applying to a new parcel of land.

No new land parcels are proposed to be included or excluded from the development.

4.3 Dramatically changes the built form in terms of scale, bulk and appearance.

The proposed changes will not result in change in the scale, bulk and appearance that is dramatically
different to the current built form to what has currently been approved and constructed. The proposed
works will occur within the largely existing building footprint. External finishes have been revised slightly
as a result of the proposed changes; the most notable being the inclusion of the breeze blocks for the
required ventilation in the services room and to improve airflow on the upper levels to the western
facade. Some landscape and built form elements have also evolved as a result of design development,
building cost efficiencies and building code requirements. The key building form and landscape changes
relate to ensuring the development is 3 storeys under the building code.

4.4 Changes the ability of the proposed development to operate as intended.

The proposed Minor Change does not affect the ability of the approved development to operate as
intended as a Multiple Dwelling. The proposed changes do not increase the number of units previously
approved.




                                                                                                            3

Page 4

4.5 Removes a component that is integral to the operation of the development.

The proposed change to the existing approval does not remove a component that is integral to the
operation of the development.

4.6 Significantly impacts on traffic flow and the transport network, such as increasing traffic
to the site.

The proposed change will not significantly impact the existing traffic flow and transport network. The
existing car parking will be maintained as per Condition 24 (12 car parks).

4.7 Introduces new impacts or increases the severity of known impacts.

There are no new impacts or an increase in the severity of known impacts to the site or the surrounding
lots.

4.8 Removes an incentive or offset component that would have balanced a negative impact
of the development.

The proposed change to the existing approval does not remove an incentive or offset component that
would have balanced a negative impact of the development.

4.9 Impact on infrastructure provisions.

The requested Minor Change to the approval does not impact on infrastructure provision.

SUMMARY
We thank the Council on behalf of the applicant for assessing the above application. Based on the
information provided in this application we respectfully request that Council proceed to issue a minor
change approval supporting the proposed development in full.

Yours faithfully,
Adapt Development Management Pty Ltd




Tiani Boulton
Director
E: [email protected]
M: 0404924160




                                                                                                      4

Used in these records

About this file

File size
256 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Minor Change Assessment Report.pdf · 256 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.