Council archive · source document
07/0344 - MCU - Preliminary building work assessable against planning scheme [As Published] · 172007.344
NEereKywe Checklist - Applications Involving Land Development & Land Use Sections IDAS APPLICATION This checklist should be used for any IDAS application. Please check each of the following items before accepting an application at the counter. 1. APPLICATION FORMS 1.1 Form 1 PartA 1.1.1 Ensure that the form is fully completed. 1 1.1.2 Inthe case of an MCU or Op Works below the high-water mark, owners consent is required. 1.1.2.1 If there are multiple owners, the consent of each owner is required. 1.1.2.2 _ If the owner of the land is a company, either ACN No. or Company Seal required. 1.2 Form1 Part B-O Supporting Information 1.1.2 Ensure that for each box checked on Form A, the relevant additional Forms B-O are attached. 1.1.2.1. Ensure that each of Forms B-O which are attached are fully completed. 2. REFERRAL INFORMATION 2.1. Ensure that items 1-23 have been checked and/or completed with regard to referrals. 3. ENVIRONMENTALLY RELEVANT ACTIVITIES 3.1 Ensure that Part G is completed if EPA referral is required. NW 3.2. Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application fee is paid and recorded on the application. 4, FORM 2 - REQUEST TO CHANGE APPROVAL 4.1 Ensure that items 1-28 have been checked and/or completed including information regarding applicant details and owners consent. 5. PLANS 5.1 Ensure that at least 6 sets of the Plan of Development (5 for Reconfiguration and Operational Works) accompanies the application. In addition ensure that each set is complete. 5.2 Ensure that 1 of the copies of the Plan of Development is in an A3 or A4 format and is unbound. 6. SUPPORTING INFORMATION . oe , . 6.1 Ensure that at least 6 copies of any report accompanies the application (5 for Reconfiguration and Operational Works). If the application is accompanied by a covering letter, ensure that it is capable of reproduction. 6.2 In the case of reports, ensure that 1 of the copies is in an A3 or A4 format and is unbound. 7. FEE - - a we . : 7.4 Ensure that the application fee, as determined from the Council's adopted scale of fees, accompanies the application or has been paid. 7.2. Ensure that the fee which has been paid is recorded on the application form. : a W YY Si) Receiving Officer Having completed this form and accepted the appliéation, please deliver both to the following IDAS Application Receiving trays:- « Ifthe application is for a Material Change of Use exclusively -AOP1’s desk in the Land Use Section. « Ifthe application is for an Material Change of Use & Reconfiguration - AOP1’s desk in the Land Use Section. « Ifthe application is for Operational Works (for parking, access, sewerage or drainage) exclusively - AOD2 in the Land Development Section. « In all other circumstances ~ AOP1’s desk in the Land Use Section. Please DO NOT leave the application at the counter and DO NOT deliver the application to Records. SEP! g:\ant\forms\application checklist.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 30 pages
Page 2
February 20, 2007
2.7 FEB 2007
NOOSA
SAE COUNCIL
Mr Greg Jorgensen
Manager, Building Services
Noosa Shire Council
PO Box 141
Tewantin Q 4565
Dear Greg,
Re: Proposed Siting Relaxation
32 Ross Crescent, Sunshine Beach, Qld.
Please find enclosed the following documents:
" Kidd + Co Designers’ drawings 0642.WD203, 0642.WD204 and
0642.WD501 (2 x copies)
= Forms A & E - completed
«Check List
* Cheque for $395.00
We seek Council’s consideration to relax the proposed extension of the existing
house towards the northern boundary as shown on the enclosed drawings.
We seek Council's relaxation due to the existing structures on site and our
clients desire to provide a roof covering to outdoor spaces.
The adjoining property to the northern boundary will not lose sun exposure nor
be adversely affected by amenity.
We trust this meets with Council’s approval.
Yours faithfully,
Zam fae
Kid
GO)
designers
Stephen Kidd
Principal
lan Gorton
Associate
Carole Tretheway
Associate
20 Duke Street
Sunshine Beach OLD 4567
Postal address
PO Box 262
Noosa Heads QLD 4567
Telephone 07 5447 5633
Facsimile 07 5447 5833
[email protected]
[email protected]
[email protected]
www.kiddco.com.au
zh Arce tect as
&
Bee
Co Pro Riki
Bs ow sg lio>- Es
neecle df
Stephen Kidd
Enc.
Kidd + Co Designers
ABN 15 608 699 524
Page 3
Form 1 Development Application PartA Item 25 — Plans/drawings/reports accompanying this application. Proposed Alterations Additions 32 Ross Crescent Sunshine Beach O 4567 Pian / Drawing / Report Number | Title Date (i) 0642.WD.203 Lower Floor Plan - Proposed December 2006 (ii) 0642.WD.204 Upper Floor Plan ~ Proposed December 2006 (iii) 0642.WD.501 Elevations - Proposed December 2006 iv) (v) (vi) (vii) (viii) (ix) KAIPROJECT FILES\0642 Whittaker Ross Cres\ADMIN\FORMS\0642 070220 Attachment Item 25 Form 1 Part A.doc
Page 4
INTEGRATED PLANNING ACT 1997
Part A, Version 2.4, 29 May 2006
Form 1 Development Application
Common defails
PART
The.completion of all applicable questions on Part A is mandatory for all applications. Part A must be accompanied by the completed IDAS Assessment Checklist if
required, and by one (1) or more other completed parts of the Form as required. For more information on the parts of the Form refer to www.ipa.qid.gov.au.
‘Any information requested in the form may be provided in an attachment to the application. For further information about completing the following detaits, refer to Guide 1.
Description of land _|1. Street address: fneludinghouse number, street name, suburb/locality name & postcode) (if applicable)
Ne ae eed ot [ 32 ROSS CRESCENT, SUNSHINE BEACH, QLD 4567 |
Fparianibheinealvareiciiiad 2.” ’Name‘of water body or watercourse; within which the development is ‘proposed: (ifapplicable) :,
Advice for completing 02 - 02 applies if [ NIA |
development is proposed within a water body or — 7 - 4
watecourse. : 3.. Lot on plan description (eg. Lot 123 on RP 4567)/ GPS coordinates:
Advice for completing Q3 - Mosi land can be :
identified by a fot on plan description. These details” |. _ | LOT 563 ON RP 48112
<can be cbizined rom ite documents orthwovghihe | 4° ~The above description is for: (lick applicable box) | , een
‘ local government. 5 : a eee
‘ However, if the land on which the develapment is {XI (i) _ the land on which the development is proposed; or a Stee
proposed does not have a lot on plan description fie,
the development is proposed in a water body or. *:
- watercourse) provide —
£() the lot on plan description for
adjoining/adjacent land;.or
4 (li) GPS coordinates where there is
, Sdjoiningladjacent tand (eg. in Moreton Bay).
. Advice for completing Q7 - Q7 does not apply if the
; development is is within a water body of watercourse."
: Advice for completing Q8 -.Q8 applies.
Fd development i is" within'a toca, .government
« Note: Areas below highwater mark are
local government's area unless provided for under the "|
; Local Government Act 1993.
: ‘Advice for completing Q9 -.09.applies:if
{ development is on‘stratagic part land or a strategi
y port land tidal area. For more details refer to Guide'11'
Be dee ame ene ake war = pene
CO (il) “the tand adjoining the water body or watercourse, within which the developrient is
‘D (ili): the’ water body or walerourse,
+ Shop / tenancy number: .
‘| NA | ;
Port: authority for the’ strategic port land-or: strategic port land: tidal area on:which t!
proposed; or a
‘ Storey Tlevel:
a Two
Local: government z area in which the
NOOSA SHIRE COUNCIL
evelopment is proposed: (ég.-Port.of Brisbane,-Port of Townsville) (if applicabie}
N/A
‘Proposal. details
“It there is insufficient room available, de
provided In an attachment to the appiication.
may be
“Existing use: ofthe land: (eg: vacant, singlé-house,.shop etc.)
| SINGLE HOUSE
. .Proposed use of the land: (eg. 6 unit apartment building, 30 lof residential Subdivision, ERA. for aquacuture in
‘ponds with @ total area of 7 hai for which wastes are released into waters.etc). «
| SINGLE HOUSE
Other applicable parts of Form'1
Part A must atways be accompanied by other
completed parts of Form 1. For information about
when a part of Form t may apply refer. to Guide 1.
Other:parts of Form 1.completed.as part of this application: (eg. Part D, Part 1, etc)
[E 7]
Applicant details
Clearly identify who is making the appfication. The
applicant need not be the owner of the land.
When signing and lodging this application
The applicant is responsible for ensuring the
information provided is correct. The assessment
manager, any referral agency & the Chief Executive
(where applicable) will rely on this information when
assessing and deciding the application.
lf the applicant ts a company -.a contact person
must be shown.
17.
18.
Applicant's name: 15. Contact person:
Wi ¥ @ WHITTAKER | | Stephen Kidd |
Contact number: 16. Facsimile number/e-mail address:
~ | (07) 5447 5633 (07) 5447 5833
[email protected]
Postal address:
| PO Box 262, Noosa Heads, Qld. 4567 |
Signature: , / ) 19. Date:
22/02/2007
filets
[7
V
Page 5
INTEGRATED PLANNING ACT 1997 Part A, Version 2.4, 29 May 2006
Land owner's consent (if applicable) 20. Land owner's consent to the making of this application:
Section 3,2.1(3) of the 1PA prescribes that an Name
application must contain, or be supported by, the
written consent of the land owner/s, if the application
th omatel change of use; - ) a A hn qi hk bil
{li} reconfiguration of a lat; ti)
(iil) work on tand below high-water mark & not within a if tW ‘
canal as defined under the Coastal Protection end) =|. _S oe LW! h itoke Cod
Management Act 1995;or -
(iv) work on rail corridor tand defined under the (iii)
Transport infrastructure Act 1994.
Section 3.8.1(2){a) of the [PA provides that m
landowner’s consent is not required fora mobile or (iv)
temporavERA, fbn nen nnn nnn nnn eee n en een nner reece
For more information refer to Guide 1. , (v)
Date
Lee 2/2177.
23/02/07 |
Resource entitlement (if applicable) 21. .Does this application involve.a State resource prescribed under’a regulation (other than involving
Section 3.2.1(5) of the IPA requires evidence of quarry material on State coastal land under the Coastal Protection and Management Act 1 995)?
resource entitlement be given for applications thal
TXINO -go to a24 0 YES goto 22 ~
involve a prescribed State resource. bee
application cannot be'taken'to be properly made’ |-22. ‘This application is accompanied by evidence: (lick applicable box)» .
Section 3.2.1(10}{a)(il) of the IPA prascribes that an ‘
- wiloutevidence ofthe resource entlement. - ) - [) (i) ofthe allocation of, or entitlement to, the resource — attach evidence and go to Q23{u)
Advice for completing Q21 & 22
Refer to schedule 10 of the integrated’ Planning CD (ii) the chief executive of the department administering the resource is‘satisfied:the
Regulation 1998 that prescribes the nature of evidence development is consistent with an allocation of, or entitlement fo, the resource - go
tequired by the State in support af the lodging of this 10 023 —_——————————
development application. .
: ‘ :(] (ili) the chief executive of the department administering! the resource is satisfied the
development application may proceed in the absence of-an-allocation of, or
entitlement to, the resource — go to.a23
ut,
23. “Evidence of the resource entitleme:
Advice for completing Q23 ,
‘The information in (i) — (v) is mandatory if evidence i
Tequired.undar’Q22 (iij‘or (iii):above. *
The official stamp of the Department of Natural an
* Resources, Mines and Water is mandatory where the - ~"1 applicable)":
application involves any water or riverine quarry." ta .
material. under the Water Act 2000. a
Section 3.2.1(5A) allows the resource’ ‘manager to limit
the time the evidence may be used. Q23 (vi) must be
completed if the evidence time ted.
pene of evidence (if applicable) -*- 2 :
Assessment triggers 24. Is the IDAS Assessment Checklist completed and.attached to this application?
Feet ol Pak amor eh “BY YES (NO - the assessment manager may refuse to accept this application on the
must be completed for all other applications. . * .grounds that the application has not been properly made
Plans /.drawings / reports i 25, Plans/drawings/reports accompanying. this application: site
Suppo popes! & enable aearnent bole. Plan / Drawing / Report Number Title Date
Io eesiaton dutty poi oaety oreuhie (i) Please refer to attached list
notification to understand the scope. of the proposal
and any potential impact
PLEASE NOTE: The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide alt applicable information required by Part A
and any other relevant part of Form 1.
OFFICE USE ONLY (applicable to assessment manager's)
FEES DATE RECEIVING OFFICER'S | REFERENCE
‘) RECEVED | NAMEIS i NUMBERIS
Notification of Engagement of Private Certifier (Optional formal)
' To. Council. | have been engaged as the private ceriifier for the building work referred ic in this application.
Date orengagemeny i 4Kccrediafion Number, __ Name: Signature:
Page 6
INTEGRATED PLANNING ACT 1997
WwW Form 1 Development Application
Part E, Version 2.0, 4 October 2004
Operational &/or building work
assessable against a local government’s planning scheme
ART
on
Completion of all question on Part E is mandatory for all applications involving the assessment of operational work and/or building work (including detailed
engineering plans and other plans, detailed engineering plans for subdivisiona! works and conceptual design plans for engineering & building work when the application does
not involve assessment of a material change of use of premises at the same time) assessable against a local govemment's planning scheme.
Nature of the application
A development permit authorises
. development to occur, while a preliminary
approval is a step in the approval process
and does not authorise development to occur.
The types of work that are assessable against
a planning scheme are determined by the
scheme for a particular local govemment and
will vary across the State.
To determine the types of work that are
assessable under a particular planning
«scheme, contact the relevant local
1.
This application is for (tick one (1) or both if applicable)
C1 Preliminary approval - provide details of the type of work eg. roadwork, stormwater, water and sewerage
infrastructure, etc
|
AND /OR
{X] Development permit - provide details of the type of work eg. roadwork, stormwater, water and sewerage
infrastructure, etc
| Siting relaxation of proposed extension towards the northern boundary
goverment. 2. Are the works subsequent to a previous development approval?
[XJ NO (DYES - provide details of all previous approvals (eg. file references)
| Other than building approval |
3. _ {s the subdivision for a canal estate?
JNO CJ Yes
; Portable Long Service Leave levy (if |4. Is payment of a Portable Long Service Leave (PLSL) levy applicable to the proposal?
: applicable) _
Prior to issuing a development permit for the w ‘YES - complete 05
"works, the assessment manager Is required {1 NO - 05, 6&7 do not apply
{ by law to “sight” an approved form, issued by
‘leave, which signifies thatthe PLSL levy 5. Has the PLSL levy been paid?
: has been paid, ° YES - compieteas
X NO - the applicable levy must be paid before a development permit can be given for the works
6. How much was paid?
| TBA _
7. Whatis the receipt number of the payment?
| TBA
PLEASE NOTE
This application cannot be accepted unless accompanied by Part A of Form 1.
The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information
requested by Part A and any other relevant part of Form 1.
OFFICE USE ONLY (applicable to assessment manager)
DATE RECEIVED |
REFERENCE
NUMBER/S
Page 7
INTEGRATED PLANNING ACT 1997
{i) tsa PLSL levy applicable in this instance? (No
Part E, Version 2.0, 4 October 2004
YES - comptete Qi)
(ii) Has the approved form (issued by QLeave and which signifies that the PLSL levy has been paid) been sighted by the assessment
manager / private certifier at the time of lodgement of this application?
NO (0 YES - provide receipt details below
L _|
Page 8
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 18.0, 10 November 2006
Form 1 Development Application
IDAS Assessment
Checklist
(Formerly the “Referrals Checklist”)
IMPORTANT NOTE FOR ALL APPLICANTS:
1. This checklist was formerty referred to as the “Referrals Checklist’. Some of the ‘Guides’ to using the IDAS Application Forms continue to refer to this document as the
"Referrals Checklist”. The name of this checklist was changed from 25 July 2005 to more accurately describe its function.
2. Under the IPA and IDAS framework, an application may require assessment by the local Council and/or certain Queensland State entities (e.g. Environmental Protection
Agency, Dept. of Natural Resources, Mines and Water, Queensland Heritage Council etc.).
3. This checklist is provided to assist applicants to determine when an application requires assessment by a Queensland State entity and may also assist the applicant to
determine the assessment manager’ for the application.
4, Therefore, the completion of afl questions in section 1 of this checklist is mandatory for all applications (other than those requiring the completion of Parts A & B only).
5. {tis the responsibility of the applicant to accurately complete this checklist.
6. Depending on the nature of the application, an applicable State entity may be either the assessment manager or an IDAS referral agency for the application.
7
. The assessment manager for the application will rely on the information provided in this checklist (as well as any material lodged in support of the application) to identify
e@ any applicable referral agencies for the application in the Acknowledgement Notice. The assessment manager will also rely on this information when identifying if the
application triggers referral coordination2.
8, — Toassist you in answering the following questions a series of guides are available free from the IPA website www.ipa.qid.qov.au. Guide 25 explains the role of the IDAS
Assessment Checklist in the IDAS application process, and its relationship to the Form 1 development application.
9. Any other parts of Form 4 that this checklist requires to be completed are available from the Council or the applicable State entity, or can be downloaded free from
www.ipa.qid.qov.au,
10. Section 2 on page 10 provides advice about the referrals that can be required for applications for building work assessable against the Building Regulation 2006.
SECTION 1 - STATE ASSESSMENT (completion mandatory)
Note: The following state assessment triggers apply to development other than for bullding work assessable against the Building Regulation 2006.
Environmentally relevant activity 1. The application involves: (tick applicable box/es)
For more information refer to Guide 4. (Can environmentally relevant activity (ERA) for which a code for environmental compliance
Unless you answered “none of the above” to Q1, the
application requires assessment by the has not been made - complete Part G of Form 1
- administering authority’. D (ii) a mobile or temporary ERA for which a code of environmental compliance has not been
+ [fan entity, other than the imiistrng axtosiy, is made - complete Part G of Form 1
, the assessment manager application, oe
. administering authority is a concurrence agency for &) (iii) none of the above
* the application in relation to this matter.
* Note: An application involving ERA 19 and/or 20 will
also require completion of Part Ky of Form 1 for
- approval where an allocation under the Water Act
@ ; 2000 is required,
State-controlled road matters 2. The application involves: (tick applicable box/es) :
Ghassan enor nae of above C2 ne (i) development on land contiguous’ to a State controlled road and for -
aeniicaton oe era oe Denatent ( (a) material change of use assessable against the planning scheme;
“In certain croumstances DMR wil be an advice CO (b) reconfiguring a lot unless -
agency, while in other circumstances DMR will be a the total number of lots is not increased; and
crete oathew aon wil ase yout e the total number of lots abutting the State-controlled road is not increased;
determine where DMR is an advice or concurrence J (c) operational work (not associated with a material change of use assessable against the
agency for the application. planning scheme or reconfiguring a lot mentioned in (b) above)-
« associated with access to a State-controlled road; or
« for filling or excavation; or
« involving the redirection or intensification of site stormwater from the land, through a
pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a
State-controlled road.
1 The assessment manager is responsible for assessing and deciding an IDAS application. The assessment manager for an application is prescribed in schedule 8A of the IPA.
2 For additional information refer to Guide 6 ‘Does my application tigger tha referral coordination process?’
3 The ‘administering authority’ may be either the Environmental Protection Agency, the relevant local government (for a devolved ERA} or the Queensland Department of Primary Industries and
Fisheries (for a detegated ERA).
4 Land contiguous to a State-controlled road is defined in schedule 14 of the IP Regulation to mean land - if part of the land is within 100m of the State-controtied road; or that is part of a future State-
controlled road.
Page 1
Page 9
INTEGRATED PLANNING ACT 1997
State-controlled road matters (cont)
IDAS Assessment Checklist, Version 18.0, 10 November 2006
C (ii) development on tand not contiguous to a State-controlled road and -
(0 (@) material change of use -
* assessable against the local government's planning scheme; and
mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule;
UO (b) reconfiguring a fot for a purpose mentioned in schedule 5 of the IP regulation
and exceeding the thresholds set by that schedule;
(0 (c) operational work (not associated with a material change of use assessable against the
planning scheme or reconfiguring a lot mentioned in (b) above)—
assessable against the focal government's planning scheme; and
« mentioned in schedute 5 of the IP Regulation and exceeding the thresholds set by
that schedule,
(iii) none of the above
Clearing vegetation
For more information refer to Guide 12.
Unless you answered "none of the above" to Q3, the
application requires assessment by the Department
of Natural Resources Mines and Water (NRMW}.
(fan agency other than NRMW is the assessment
* manager for the application, NRMW is a
‘concurrence agency for the application in relation to
this matter.
Hf you ticked Q3{i) or (ii), your application requires
referral to NRMW for assessment regardtess of
whether vegetation clearing is propased or not.
The application involves: (tick applicable bowes)
Oi) material change of use -
(a) assessable against the planning scheme;
(b) on alot containing -
¢ acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or
¢ ifthere is no property map of assessable vegetation for the lot - remnant vegetation;
(c) where the existing use of the land is a rural or environmental use; and
(d) where the size of the land is 2 hectares or larger - complete Part J of Form 1
OD (i) reconfiguring a lot -
(a) on alot containing a category 1, 2 or 3 area shown on a property map of
assessable vegetation or, if there is no property map of assessable vegetation for
the lot, remnant vegetation;
(b) where the size of the lot before the reconfiguration is 2 hectares or larger;
(c) where 2 or more lots are created; and
(d) where the size of any lot created is 25 hectares or smaller - complete Part J of Form 1
Dil) operational work -
(a) for the clearing of native vegetation where the vegetation clearing is made
assessable under Schedule 8 of the IPA; and
(b) not associated with a material change of use assessable against the planning
scheme mentioned in (i) or reconfiguring a lot mentioned in (ii) - complete Part J of
Form
{X] (iv) none of the above.
’ Strategic port land
For more information refer to Guide 11.
if you ticked (i) - the relevant Port Authority is the
assessment manager for the application.
“Hyou ticked (i} Queensland Transport is a
concurrence agency for the application.
The application involves:
(1 (i) development on strategic port land as defined in the Transport Infrastructure Act 1994 (TI
Act) - complete Part | of Form 1
C1 (ii) a material change of use that is inconsistent with the land use plan approved under the
TI Act for the strategic port land - complete Part ! of Form 1
(ii) none of the above
Acid sulfate soils
For more information refer to Guide 10.
Untess you answered “none of the above" to Q5, the
application requires assessment by Department of
Natural Resources Minas and Water (NRMW).
tf an agency other than NRMW is the assessment
manager for the application, NRMW is an advice
agency for the application in relation to this matter.
The application involves development on land situated in an identified local government area
and where the surface of the land is: (tick applicable box)
(0 (i) below 20m AHDS and the development will involve the excavation of 1000m? or more of
soil or sediment at or below 5m AHD, or
(2 (ii) at or below 5m AHD and the development will involve filling the site with 1000m? or more
of material
& (iii) none of the above
5 The identified local government areas are: Aurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Burnett, Caboolture, Caims, Calliope, Caloundra, Cardwell, Carpentaria, Cook,
Cooloola, Dounglas, Fitzroy, Gladstone, Gold Coasi, Hervey Bay, Hinchinbrooke, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirium Vale, Mornington, Noosa, Pine Rivers,
Redcliffe, Redtand, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday.
6 Australian Height Datum (AHD).
Page 2
Page 10
INTEGRATED PLANNING ACT 1997
Major hazard facilities or possible 6.
major hazard facilities
For more information refer to Guide 17.
H you answered "YES" to Q6, the application
requires assessment by the Department of
Emergency Services (DES).
if an agency other than DES is the assessment
manager for the application, DES is a concurrence
agency for the application in relation to this matter.
IDAS Assessment Checkist, Version 18.0, 10 November 2006
Does the application involve a material change of use for a major hazard facility or possible
major hazard facility as defined under the Dangerous Goods Safety Management Act 2001?
NO
(CI YES - complete Pert L of Form 4
Water related development under the | 7.
Water Act 2000
For more information about items (a) — (6), refer to
Guide 15. For more information about item {e),
refer to Guide 14 Does my application involve
assessment of a referable dam?
“Unless you answered ‘none of the above" to Q7, the
application requires assessment by the Department
of Natural Resources Mines and Water (NRMW}.
If an agency other than NRMW is the assessment
manager for the application, NRMW is a
concurrence agency for the application in relation to
this matter.
The application involves:
(1 (i) operational work, for taking or interfering with water under the Water Act 2000, that is:
(tick applicable box/es)
0 (a) ina watercourse, lake or spring, or from a dam constructed on a watercourse (eg.
@ pump, gravity diversion, stream re-direction, weir or dam) - complete Part Kz, Ks, Ks Ks, or Ko of
Form 1 whichever is applicable;
(1 (b) for an artesian bore anywhere in the State, no matter what the use - complete Part
Ks of Form 1;
CJ (c) for a subartesian bore, in declared groundwater area’, for use for purposes other
than stock and/or domestic use - complete Part K; of Form 1;
(2 @@) for a subartesian bore, in certain declared groundwater area, for use for stock
and/or domestic purposes - complete Part K: of Form 1;
(Ce) for constructing a referable dam? or that will increase the storage capacity of a
referable dam by more than 10% - complete Part Ks of Form 1; or
© (A) for taking or interfering with overland flow water - complete Parts Ks and G of Form 1
_ KX {ii)_ none of the above.
Removal of quarry material from a 8.
watercourse
For more information refer to Guide 16.
Ifyou answered "YES’ to Q8, the application
requires assessment by the Department of Natural
Resources Mines and Water (NRMW).
If an agency other than NRMW is the assessment
manager for the application, NRMWis a
concurrence agency for the application in relation to
- this matter.
Noto; Part G of Form 1 is required to be completed
as the activity of removing quany material from a
watercourse is also an Environmentally Relevant
Activity (ERA).
Does the application involve development for the removal of quarry material from a watercourse?
requiring an allocation notice under the Water Act 2000?
XX] NO
(YES - complete Parts Kr and G of Form 1
7 The declared ground water areas are listed in Guide 13 Development in a declared catchment area.
8 Referable dam is defined under the Water Act 2000.
9 Watercourse ts defined in sch 10 of the IPA.
Page 3
Page 11
INTEGRATED PLANNING ACT 1997
Operational works in a tidal area or
coastal management district
For more information refer to Guide 18. For more
information about prescribed fidal work in local
goverment tidal areas refer to Guide 24.
Unless you answered “none of the above" to Q9, the
appication requires assessment by the
Environmental Protection Agency {EPA}.
Hf an agency other than EPA is the assessment
manager for the application, EPA is a concurrence
agency for the application in relation to this matter.
Local government is the assessment manager for all
prescribed tidal work.
Operational work below high water
mark
For more information refer to Guide 18. For more
Information about prescribed tidal work in tocal
goverment tidal areas refer to Guide 24,
Unless you answered “none of the above” to Q10,
the application triggers referral to Queensland
Transport (QT) (Maritime Safety Old) as a
- Concurrence agency.
Local government is the assessment manager for all
prescribed tidal work.
9.
IDAS Assessment Checklist, Version 18.0, 10 November 2006
The application involves operational work that is: ( tick the applicable box/es)
Dw
Of
Dit)
Riv)
tidal work'® as defined under the Coasta! Protection and Management Act 1995 (the
Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; oF
tidal work that is prescribed tidal work"| other than in a canal? -complete Part P of Form 1; Of
carried out within a coastal management district under the Coastal Act and for — complete
Part M of Form 1 if any boxes (a) to ()) betow are ticked.
( (a) constructing or installing works in a watercourse between MHWS and HAT (ie.
other than those works in tidal water) where the development has been determined not
to be assessable against the Water Act 2000 ;
constructing a canal’? intended to be connected to tidal waters;
constructing an artificial waterway;
reclaiming land under tidal water;
disposing of dredge spoil or other solid waste material in tidal water;
interfering with quarry material on State coastal land above high-water mark;
draining or allowing drainage or flow of water or other matter across State
coastal land above high-water mark;
temoving or interfering with coastal dunes on land, other than State coastal land,
that is in an erosion prone area and above high-water mark;
constructing a bank or bund wall to establish a ponded pasture on land, other
than State coastal land, above high-water mark; or
none of the above.
Ob)
Ot)
OW
Oe)
OW
QO)
Dir)
mT)
10, The application involves operational work that is: ( tick the applicable box/es)
C (i) tida! work’ as defined under the Coastal Protection and Management Act 1995 (the
Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; or
O (i) tidal work that is prescribed tidal work"4 - complete Part P of Form 1; oF
O (ili) carried out within a coastal management district'S under the Coastal Act and for -
XI (iv)
Of)
OD)
Ove)
disposing of dredge spoil or other solid waste material in tidal water - complete Part
MofFom 1;
reclaiming tand under tidal water - complete Part M of Form 1; or
constructing a canal'®, if the canal is associated with reconfiguring a lot - complete
Part M of Form 1;
none of the above.
Coastal management
For mare information refer to Guide 18,
Unless you answered "none of the above” to 11,
the application requires assessment by the
- Environmental Protection Agency (EPA).
: Hf an agency other than EPA is the assessment
manager for the application, EPA is a concurrence
agency for he application in relation to this matter.
10 Tidal work Is defined in sch 10 of the IPA.
11.
The application involves: (tick the applicable box/es)
Ow
OW
O iii
Dw
Rv)
a material change of use assessable under a planning scheme involving operational
work carried out completely or partly in a coastal management district’
a material change of use assessable under a planning scheme involving building
work, carried out completely or partly in a coastal management district that is -
« the construction of a new premises with a GFA" of at least 1000m?
« the enlargement of the GFA of existing premises by more than 1000m?
reconfiguring a lot assessable under schedule 8 of the IPA where the land is situated
completely or partly in a coastal management district
reconfiguring a lot'® assessable under schedule 8 of the IPA and in connection with
the construction of a canal'® ~ complete Part M of Form 1
none of the above
11 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain dal works completely or partly within a local government tidal area.
12 Canai means canal as defined under the Coastal Protection and Management Act 1995
13 Tidal work is defined in sch 10 of the IPA.
14 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a toca! government tidal area.
15 Coastal management district is defined in sch 10 of the IPA and means a coastal management district under the Coastal Protection and Management Act 1995, other than an area declared as a
coastal management district under section 47(2} of that Act.
16 Canal means canal as defined under the Coastal Protection and Management Act 1995
17 GFAis defined in sch 14 of the {PA to mean the gross floor area. Far a definition of how to calculated GFA, go to the planning scheme against which the application is being assessed.
48 Under $117 of the Coastal Protection and Management Act 1995, an application for econfiguration, where the reconfiguration is associated with the construction of an artificial waterway, must be
accompanied by the apptication for the operational works to construct the artificial waterway.
Page 4
Page 12
INTEGRATED PLANNING ACT 1997
Development within the limits of a
port
For more information refer to Guide 18. For
information about prescribed fidal work rever to
Guide 24,
lf you answered "YES" to Q12, the application
triggers referral to the Port Authority.
‘The Port Authority is a concurrence agency if the
development is -
within 200m of a shipping channel or an entry
and exit shipping corridor for the port
© within 1000m of a swing basin, a commerciat
shipping wharf, a mooring, anchorage or spoil
grounds;
+ @ within 1000m of a planned port facility identified
in a land use plan approved under the Transport
Infrastructure Act 1994.
tn ail other situation the Port Authority is an advice
agency.
Marinas
For more information refer to Guide 18. For
information about whether a marina is prescribed
tidal work refer to Guide 24. The local goverment
is the assessment manager for all prescribed tidat
work,
you answered “YES” to Q13, the application
triggers referral to Queensland Fire and Rescue
Service as an advice agency.
13.
IDAS Assessment Checklist, Version 18.0, 10 November 2006
Does the application involve development below high water mark’? and within the limits of a port
under the Transport Infrastructure Act 1994?
—X) NO
(0 YES - complete Pert M of Form 1, or Part P of Form 1 if the work is prescribed tidal work
Does the application involve operational work that is tidal work for a marina®° with more than 6
vessel berths?
JNO
(DYES - complete Part M of Form 1, or Part P of Form 1 if the tidal work is prescribed tidal work
Tidat works in strategic port land tidal
areas
For more information refer to Guide 18.
Unless you answered “NO to Q14, the relevant Port
Authority Is the assessment manager for the
application and the Envirc
Agency (EPA) and Queenstand Transport (an are
concurrence agencies for the application.
Heritage
For further information refer to Guide 19.
tf you answered “YES" to Q15, the application
triggers referral to the Queensland Heritage Council
concurrence agency for the application.
=
15.
4.
Does the application involve tidal works within a strategic port land tidal area2'?
INO
(71 YES - complete Part M of Form 1
Does the application involve development in a heritage registered place as defined under the
Queensland Heritage Act 1992?
INO
(7 YES - complete Part C of Form 1
Declared catchment areas 16. The application is in an area declared to be a catchment area under the Wafer Act 2000 and
For more information, including a list of the declares involves: (tick the applicable box/es)
catchment areas within Queenstand, refer to Guide ‘ . * . ee
B " san ixeensien x= (1 () _ reconfiguring a fot if any lot resulting from the reconfiguration is less than 16 hectares;
Uress you answered “none of the above ta a6, C1 (ii) development assessable against the planning scheme involving the establishment or
beeen entof ee ES OY Water expansion of a waste water disposal system, other than a disposal system for carrying
(NRMW). out an environmentally relevant activity under the Environmental Protection Act 1994;
If an agency other than NRMW is the assessment a
manager fo the application, NRMW is a W (iil) none of the above
concurrence agency for the apptication in relation to
this matter.
Contaminated land 17. The application involves: (tick the applicable box/es)
Applications involving material change of use and/
of reconfiguring a lot may trigger this referral.
For more information refer to Guide 5.
Unless you answered ‘none of the above" to 17,
the application requires assessment by the =.
Environmental Protection Agency (EPA). if.an
agency other than EPA Is the assessment manager
for the application, EPA will be a concurrence
agency for the application in relation to this matter.
(1 (i) reconfiguring a tot for which all of part of the premises are —
(a) premises mentioned in the IPA, schedule 8, part 1, table 2 -
« item 5, including the exemption otherwise provided for by paragraph (d);
« item 6, including the exemption otherwise provided for by paragraph (e); or
« item 7, including the exemption otherwise provided for a mining activity or petroleum
activity; or
{b) in an area for which an area management advice has been given for unexploded
ordnance - complete Part N of Form 1
Di(ii) a material change of use —
(a) made assessable under the IPA, schedule 8, part 1, table 2, items 5 to 7; or
(b) assessable against the planning scheme and if all or part of the premises is in an area
for which an area management advice has been given for unexploded ordnance -
complete Part N of Form 7
& (iii) none of the above
19 High water mark is defined in the Coastaf Protection and Management Act 1995 and means the ordinary high water mark at spring tide.
20 Marina is defined in the Transport Operations (Maritime Pollution) Regulation 1995.
21 Strategie port land tidal areas are the areas generally 50 metres seaward of high water mark adjacent to strategic port land.
Page 5
Page 13
INTEGRATED PLANNING ACT 1997
Electricity infrastructure
For more information refer to schedule 2of the IP
Regulation.
Unies you answered “none of the above” to Q18,
the application triggers referral to the agency to
which the easement is granted in favour of as advice
agency.
(DAS Assessment Checklist, Version 18.0, 10 November 2006
18. The application involves: (tick the applicable box/es)
CJ (i) reconfiguring a tot where any part of the lot is -
subject to an easement in favour of a distribution entity or transmission entity under the
Electricity Act 1994 and the easement is for a transmission grid or supply network under
that Act; or
« situated within 100m of a substation site;
a material change of use, assessable against a planning scheme and not associated
with reconfiguring a lot if -
any part of the premises is subject to an easement in favour of a distribution entity or
transmission entity under the Electricity Act 1994 and the easement is for a transmission
grid or supply network under that Act; and
© any structure or work that is the natural and ordinary consequence of the use is, or will be,
located wholly or partly in the easement;
a material change of use, assessable against a planning scheme and not associated
with reconfiguring a lot if any part of the premises is situated within 100m of a substation
site;
operational work that is filling or excavation assessable against the planning scheme,
not associated with reconfiguring a lot, if -
* any part of the premises is subject to an easement in favour of a distribution entity or
transmission entity under the Electricity Act 1994 and the work is located wholly or partly in
the easement;
the work is located wholly or partly within 10m of a substation site;
BX (v)_ none of the above.
Oi)
D iii)
Ot)
Land designated for community
infrastructure
Applications involving development on land
designated for community infrastructure may trigger
this referral.
For more information refer to schedule 2 of the 1P
Reaulation
Ifyou answered "YES' to Q19, the application
requires assessment by the chief executive of the
department administering the Act authorising the
development for the designated purpose.
If an agency other than the designator Is the
assessment manager for the application, the
designating agency will be a concurrence agency for
the application in relation to this matter.
Does the application involve development assessable against the planning scheme and on land
designated for community infrastructure?
(i) intended to be supplied by a public sector entity; and
(ii) on land not owned by or on behalf of the State; and
(iii) other than development -—
(a) for the designated purpose; or
{b) carried out by, or on behalf of, the designator.
&J No
(Yes
Page 6
Page 14
INTEGRATED PLANNING ACT 1997
SEQ Regional Plan
For more information refer to schedule 2 of the !P
Regulation.
Refer to Chapter 2, part SA and schedule 10 of the
Integrated Planning Act 1997, and schedule 2 of the
Regulatory Provisions for relevant definitions.
Unless you answered “none of the above” to Q20,
the application requires assessment by the Office of
Urban Management (OUM).
Fisheries matters
For more information refer to schedule 2of the SP
Regulation,
Unless you answered "none of the above” to Q21,
the application requires assessment by the
Department of Primary Industries and Fisheries
(DPI&F).
If an agency other than DPI&F is the assessment
manager for the application, DPI&F is a concurrence
agency for the application in relation to Items (i) -
e (iv) and an advice agency in relation to Item (v).
IDAS Assessment Checklist, Version 18.0, 10 November 2006
20. The application involves (tick applicable boxes) -
DL (i) a material change of use of premises —
(a) in a Major Development Area in the Urban Footprint for -
UO (i) anurban activity -
(1 in an area included in a structure plan where the IPA, section 3.1.6
applies;
(_sinan area not included in a structure plan where -
« the IPA, section 3.1.6 applies to the application for the material change
of use; or
« the premises exceeds 10,000m2; or
the gross floor area (GFA) on the premises will exceed 10,000m2; or
« impact assessment is required under the relevant planning scheme
DD (ii) intensive animal husbandry, or
OO (il) residential development involving a rural residential purpose
(b) in the Regional Landscape and Rural Production Area for -
© (i) anurban activity and not specified in section 2.4(2); or
Ci) residential development invoiving a rural residential purpose and not
specified in section 2.6(2)
(c) in the Rural Living Area for an urban activity and not specified in section 2.8(2);
{d) in the Investigation Area for -
© (i) anurban activity and not specified in section 2.10(2);
© (ii) residential development involving a rural residential purpose and not
specified in section 2.12(2); or
2 (ii) intensive animal husbandry
(1 (ii) reconfiguring a lot-
On land in a Major Development Area in the Urban Footprint that is:
(a) notincluded in a structure plan; and
{b} not specified in section 3.1(2).
J (iii) none of the above
21. The application involves: (tick the applicable box/es)
C(i)_ an assessable material change of use for aquaculture - complete Part O: of Form 1;
Di (i)_ assessable operational work that is the construction or raising of a waterway barrier -
complete Part O3 of Form 1;
UC {ili) assessable operational work completely or partly within a declared fish habitat area-
complete Part O2 of Form 1;
CH (wv) assessable operational work that is the removal, destruction or damage of a marine
plant - complete Part O2 of Form 1;
(J (v) development assessable under the IPA, schedule 8, part 1, on land that adjoins a
declared fish habitat area;
KX] (vi) none of the above.
Page 7
Page 15
INTEGRATED PLANNING ACT 1997
Integration of land use and public
transport
For more information refer to Guide 23, schedule BA
of the IPA, & schedule 2 of the IP Regulation.
Unless you answered “none of the above", the
application triggers referral to OT as a concurrence
agency.
IDAS Assessment Checklist, Version 18.0, 10 November 2006
22. The application involves: (tick the applicable box/es)—
C0 (i) a material change of use assessable against the planning scheme for a purpose
mentioned in schedule 13C of the IP Regulation and exceeding the thresholds set by that
schedule.
O (ii) reconfiguring a lot—
(J (a) on land that is completely or partly within a public transport corridor, and the
total number of lots increases;
[J (b) on land that is completely or partly within a future public transport corridor or
an airport's public safety area;
(©) _ onltand that is within 400m of a public passenger transport facility or a future
public passenger transport facility, and the total site area is 5000m? or greater;
(J (6) for a residential purpose within the 25 ANEF contour for an airport;
(J (e) _ for aresidential purpose resulting in 100 or more allotments.
O (ii) operational work assessable against the planning scheme, but not associated with a
Material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, on land that—
(1 (a) _ is completely or partly within a public transport corridor or a future public
transport corridor;
(CD (b) _ will result in work that encroaches into an airport's operational airspace.
& (iv) none of the above.
Railway safety and efficiency 23, The application involves: (tick the applicable box/es)—
Sethe Dk cehadule Dot hott Zi schetie BA Dia material change of use assessable against the planning scheme for a purpose
Uniess you answered ‘none of the above’, the mentioned in schedule 13D of the IP Regulation and exceeding the thresholds set by that
application triggers referral to QT as a concurrence schedule.
agency. O (ii) reconfiguring a fot—
(O(a) _ onland that is completely or partly within a future public transport corridor,
future railway land or a railway tunnel easement;
(J (b) on land that is within 400m of a Citytrain passenger railway station or a future
Citytrain passenger railway station, and the total site area is 5000m? or
greater;
(J (c) _ on land that abuts rail corridor land, commercial corridor land or future railway
land, and the total number of lots increases;
(1d) on land that abuts rail corridor !and, commercial corridor land or future railway
land and an easement abutting the corridor or future railway land is created;
CJ (e) on land that is completely or partly within 100m of, and abutting an approach
to, a railway level crossing, and the total number of lots increases;
C1 (f) for a residential purpose resulting in 100 or more allotments.
CO (ili) operational work assessable against the planning scheme, but not associated with a
Material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, involving extracting, excavating or filling greater than 50m3, on land that—
(J (a) _ is completely or partly within rail corridor land or commercial corridor land, and
the work is not for rail transport infrastructure or other rail infrastructure;
(0 (b) is completely or partly within future railway land, or a railway tunnel easement;
C6) abuts rail corridor and, commercial corridor land or future railway land, and
the work is within 25m of the railway boundary.
{iv) none of the above.
Moonie to Brisbane pipeline 24, The application involves the easement for the construction or operation of the Moonie to
For more information refer to schedule 2of the IP.
Requiation.
Unless you answered “none of the above’, the
application triggers referral to the hotder of pipeline
licence No 1 issued under the Petroteum Act 1923,
currently Santos QNT Pty Ltd, for advice.
Brisbane strategic pipeline, and involves: (tick the epplicable box/es})—
OC (i) a material change of use assessable against the planning scheme and not associated
with reconfiguring a lot, and any structure or work will be located wholly or partly in the
easement.
D (ii) reconfiguring a lot
OU (ili) operational work assessable against the planning scheme, that is filling, excavation,
compaction, drilling, boring or piling not associated with a reconfiguring a lot, and the
work is located wholly or partly in the easement.
[X] (iv) none of the above.
Page 8
Page 16
4
INTEGRATED PLANNING ACT 1997
Koala habitat area
For more information, refer to Guide 26 and
schedule 2 of the 1P Requlation.
Unless you answered “none of the above’, the
application requires referral to the Environmental
Protection Agency as a concurrence agency.
IDAS Assessment Checklist, Version 18.0, 10 November 2006
25. The application involves: (tick the applicable box/es)—
(0 (i) a material change of use of premises in a koala conservation area or koala
sustainability area made assessable under a planning scheme, that is not for a domestic
activity and will result in -
(J (a) clearing of native vegetation over an area greater than 2500m?;
UD (b) anew building and any reasonably associated structure with a total footprint
greater than 1000mz2;
(3 (c)_ an extension to an existing building and any reasonably associated structure if
the extension has a total footprint greater than 1000m2;
(1 (0) extracting gravel, rock or sand from an area greater than 5000m2;
(1 (e) excavating or filling an area greater than 5000m?;
(1) (f additional traffic in a koala conservation area or koala sustainability area,
between 6p.m. on a day and 6a.m. on the following day.
D (ii) reconfiguring a fot in a koala conservation area or koala sustainability area that will
result in —
(1 (a) anincreased number of lots;
J (b) clearing of native vegetation over an area greater than 2500m2,
(I (ii) operational work in a koala conservation area or koala sustainability area made
assessable under Schedule 8, Part 1, Table 4, items 1A to 1G (not associated with
reconfiguring a fot mentioned in (ii) above) that will result in the clearing of native vegetation
over an area greater than 2500m?.
(CO (iv) operational work in a koala conservation area or koala sustainability area made
assessable under a planning scheme (not associated with a material change of use
mentioned in (i) or reconfiguring a fot mentioned in (ii) above) that is not for a domestic activity
and will result in —
(J (a) clearing of native vegetation over an area greater than 2500m?;
(FD (b) extracting gravel, rock or sand from an area greater than 5000m?;
DD (c) excavating or filling an area greater than 5000m?.
&] (v) none of the above.
Referral coordination
An information request requires referral coordination
if the application involves —
{i} 301 more concurrence agencies; or
(i) a facility or area assessable under a
planning scheme and prescribed in
schedule? or 8 of the IP Regutation: or
(ii) development which is subject to an
application for preliminary approval
mentioned in $3.1.6 of the IPA.
For more information go to Guide2 and Guide 6.
26. Does the application trigger referral coordination?
NO
(2 YES, as the application: (tick the applicable boxes)
Oi) triggers 3 or more concurrence agencies;
CJ (i) involves a material change of use made assessable under a planning
scheme and prescribed in schedule 7 of the IP Regulation;
D (ii) involves a material change of use (other than a dwelling house, outbuilding
or farm building) made assessable under a planning scheme, or
reconfiguring a fot, in an area prescribed in schedule 8 of the IP Regulation;
C1 (iv) _ is for a preliminary approval mentioned in $3.1.6 of the IPA
Referral agency responses prior to
lodgement
Under $3.3.2 of IPA a referral agency may give a
referral agency response on a matter within its
jurisdiction about a proposal before an application
for the proposal is made fo the assessment
manager.
This is commonly the case where an application
requires referral to 2 building referral agency (eg.
Qld Fire and Rescue Service).
27. Did a referral agency give a referral agency response under $3.3.2 of the IPA before the
application was made to the assessment manager?
{] NO
(DYES - attach @ copy of the referral agency/s response/s
PLEASE NOTE:
The assessment manager may refuse to accept an application, which, at the time of lodgement, fails to provide the
completed IDAS Assessment Checklist {if applicable).
OFFICE USE ONLY (applicable to assessment manager)
[DATERECEIVED |
[_REFERENCE NUMBERIS | 7]
Page 9
Page 17
NEW pool ballast tank / refer 10 pool
‘contractors specifications for size
extsting outdoar shower,
new fitings as sched,
NEW planer 49°20,
© wz
trees be retained
X
LANDSCAPED GARDEN
NEW DP with RWH to detall /
‘collecting water from Balcony oves
‘
\
Vy
\\
FFL of ties over conc, \
slab bw Gas Batter to
facie the operation
cl the automatic gate
preter
dedes NEW cone,
\ stales'as' sched, J
Le Ale qireatnitinead over:
f_ipem fefer to eng.
Woo
= ENTRY WALKW,
ties
IL
cetsting MC to Existing Farnly
|. ¢-— relocated (exact location to bo. *
determined or-ste)
tr
=
«lee
| in-of
hinges carpet
xisting NC to remain.
of unit fo be .
determined on-sto
xi xl x
remove exising ime strips | NEWPLANTER 35,577 eis
r
ing AC cond,
}] G01
= | |
eat 7 | ‘al
LL =>
PLANTER,
[Tow RUZ7.150
fie of NEW s
+ 4 &— concrata batoony i
over
LANDSCAPING BO
2} 2
=
ay
1.5m setback fine :
8
x x ob
ra
TOwRL29.950 © 257°54'20"
Terrace/Courts/ Walkways.
sam
150,Am?
143.9m?
40,.7mt
47m
1624m?
35.7 m?
683m?
S.1m?
55a
610.2m*
TOW RL29,550,
LOWER FLOOR PLAN - PROPOSED
TOW RL28.760 = TOWRL78,350 TOW RLZ7.950
Existing Structure
New Brick Veneer Walls
New Masonry Block Walls
New Framed Walls
1 Qame
NEW masonry boundary
tence # retaining wall
ROSS CRESCENT
06.22.69)
Note: Existing A/C Unit to Bed 1 and Study
to remain
Note; Please refer to Eng. docs. for glazing
rebate weatherproot step and 700 drawing caries
Note: Allateps indicated on Plans retate
for detad
to Finished Floor Levels, not Structural Note: All existing floor wastes to be modified
Floor Levels, where required in accordance wiih Noosa Shire.
Note: All interior walls to habliable rooms
to be sound insulated f refer to 700 series Note: Sound insulation to Upper Level timber
JAC Beetle smoke alarm with battery back-up,
kidd
+CO
designers
20 Ditke Street
‘Sunshine Beach QLD 4567
PO Box 262
Noosa Heads QLD 4567
Telephone 07 5447 5633
Focsimie 07 5447 5833
info@kiddco,com.au
wow kiddo, com, au
Thsdraning is be
readin conpuretion wih
Engnoers Drawings &
Reports,
‘Constuxon to corrply
wit ol efevart SAA.
BCA Codes & standard
dg Bylaw 1975 & a0
Project
Proposed Renovation
‘Location,
32 Ross Crescent
Sunshine Beach
‘Chen
Whittaker
Drawing Tile
Lower Plan - Proposed
Sede Dato
as shown Dec, 06
‘Drawn By Job Now
GS 0642
(Draping No, (tesua No.
WD.203 C)
Page 18
© sched. refer fo 700 2
series for detal
> wie TN & sper as sched,
> eee NEW stairs nd herdral "WHS. Miidimademime nh ee
oO, 1s sched. refer to 700 series) + [AE -coneedded indon drat benes ma ¥ .
2 ‘ony TIT =i
oe A baw Unb la htilatg wie ee a DRIVEWAY \
new ; p ‘ " 0 — Te Leo = &— sptter a8 sched. (olew) | |
of 2 t, i <r
HE mo ' : : . \
pace eee Parr KITCHEN «|: ‘aww, DINE =. ERE \ \
ros =| timber | In Chearstory | thnjer i
NEW handrad as ached refer to ws ee Gl ‘toner H Vem, fC tateraarocibeat 5
TT ee 3 t ' 4 1. — for ental
Tmeindit ear ee ga eo
; if =|} 013 . yo}, W | $
ling af NEW sun cont trol battens over as sched./ ve = , : of flooring 4 I a]
= SO stepar—! af a) ; oof thet = =="
re _ Refer TOD see ordeal — eo, iad. tier Kt up eg sion <1 eearstony 11 existing beam over, = : Ce Pn ®
i —— = Bs —4 ' o“ 4 : TE HA spittor as sched,
aew Ts lt . EN] «raking ceiing "raking ceting —*
post fo eng, ‘ My STUDY \ || a a — AL r|
' : capet . a : NEW raking handral
‘woo i foes H : = oener toca ff <— ove pst ae sche ©
a or oi +d sort y hot Ee, +f ratert0 700 serles fordetad = - os sa
+ , FFA, 39.280} ‘ LIVING
Mt ‘ : ee
‘ a eer
: | Sting beam over a
& FFL z7se0] ————— oar
“Was Ofishr et l : cP ff~ spite as sched.
: = p16 = e
LIRR . ® |
a : rt
“BS 1 ‘ |
wii oath] & ty DRI }
i tie 1 {
‘ee CI * fe |
Poe . wy FEIN J ! i
‘ 1€— existing beam over a t ®& i
wa © . B - \ , ' = |
is fi |
‘Tene posto eng
j
° |
6 © ® © I
I i
UPPER FLOOR PLAN - PROPOSED eo j
4:100 @A2 Wim Existing Structure /
: fy ~—CNew Brick Veneer Walls
(za _sNew Masonry Block Walls
c= New Framed Walls
Note: Existing AAC Unit to Bed 1 and Study Note: Please refer lo Eng. docs, for glazing
foreman rebate weatherproot step and 700 drawing series
Note: All steps indicated on Plans retate-
to Finished Floor Levels, not Structural
Floor Levels.
fot details
Noter All exlsting floor wasles to be modified
where required in accordance wiih Noosa Shire.
Counci’s
Note: All interlor walls to habitable rooms,
tobe sound insulated / reter to 700 series
for dela’
Nole: Sound Insulation to Upper Level timber
floors as sched.
ROSS CRESCENT
designers
20 Duke Streat
‘Sunshine Beach QLD 4567
PO Box 262
Noosa Heads QLD 4567
Telephone O7 $447 5633
Facshnile . OF S447 $833
Into kiddeo.com.au
ween kiddeo..com,au
Project
Proposed Renovation
Location
32 Ross Crescent
Sunshine Beach
Gient
Whittaker
Drawing Tite
Upper Plan - Proposed
Sede Date
as shown Dec, 06
Drawn By dob No:
6s 0642
Orawing No, seve fa,
WD.204 C)
Page 19
NEW windows lo dearstoxy
¥
NEW metal roof over:
38
NEW sun control
battens
NEW doors
NEW handrad
wer upstand
NEW meta
awning
NEW masonry
wal with
exprexsed
grooves
woo co
NEW masonyy walls __
with expressed grooves
(5 NEW masorey front
~~ Yppoundary wal
EAST ELEVATION
1:100 @A2
NEW roof NEW metal roof to existing structure
NEW metal
NEW fy-over root (beyond) 7 lie
NEW sun-control
battens,
Tew
NEW hebel awning o S, -|
NEW rendered masonry wall wih
expressed grooves
= WEST ELEVATION
1:100 @ A2
NEW
”
NEW stairs NEW door NEW glazed doors NEW glazed doors
NEW meta roof ta
existing tout farting “]
soowns)
o
NEW suncontrot
|
NEW handradl
Lv ‘over upstand
NEW metal root and framing 1
NEW sun ¥
control battens ‘|
Monet
NEW handrad ——)>
NEW concrete
tpstand beam to eng,
vangaay
¢—_ NEW masonry walls with
‘oxpressed grooves @ 00ers,
NEW windows,
NEW windows
SOUTH ELEVATION ‘
NEW window
1:100 @ A2 \
NEW metal oot over
I existing tool framing
NEW window and awning
NEW roof extension
to existing roof
NEW metal roof
J ‘ond framing
NEW fowvres
‘extension of existing rool |
“ew trorten wou
NEW sun
‘control battens.
NEW sun-control
‘ man] P27,
+
32815
NEW post
NEW handrall
‘over concrete upetand
QL — NEW handed
5967
rom
WO? (beyond)
[NEW masonry wall wih
expressed grooves,
NORTH ELEVATION
1:100 @ A2
kidd
+CO
designers
20 Duke Sireet
‘Sunshine Beach QLD 4567
PO Box 262
Noosa Heads OLD 4567
Telephone 07 S447 5633
Facsimée 07 5447 5833
Infofkiddeo.com, au
wwew. kiddeo,com,au
Tie dratirg tobe
readin conjretion with
Engineers Orawngs &
Reports,
Constnucfon to comely
wih al relevard SAA &
BCA Codes & stance
Big Byaw 1975 & as
Project
Proposed Renovation
Location
32 Ross Crescent
Sunshine Beach
Client
Whittaker
Drowning Tile
Elevations
Scie Date
as shown Dec, 06
Drawn By Job No:
Gs 0642
issu No,
‘Orawing No.
wD.501 C)
Page 20
$330 00T x 7 OMe (2660 ~ oun . *
“307 an ON
3a oa 50 . ~
ua -
“ tee 18
» HEB 148090) HEB 1.8000)
2 Ofiat 1 BO Ofna 180 PUMP UP CONNECTION
oe 252000 ey sow saree
W332 5 Type See Teesna
$L342) ante ’ |
Type? “ :
“HcB 1 50.00) :
Oat 150,
CB 1.05 (OF soa +
‘$4 3120 , HCA 3340.
Ofteet 471 . ‘Type Stub . One 100 |
iL s298 42940
geass ‘$2900
8 P
° : Tyee PGice 190000) |
4 Omet 1050,
+ wens 00 ” sas
Otfeet 9.68 , Type P
013 . Y cA 19.00 10)
U3) MO, Offset 10 50 \
Tyee? . uno = 28
. S710 f
. ‘Type Sub .
15 co 18 50 0) , “neo 1900 (0)
1a Ofheat Ofteat 10.00 \
1.27 L278 27 Ofhet : ;
sls? * a “
tee ae MES 30
c824000) Hee 1990.00)
$805/04/08 47 Ofet 488 ¢ tne
LL 30,1 Wy, 29.79 4 Zc
22 ©, sm,
My Tyee» e8 2037 (10)
ft Oftuat 671 .
Ky , th 2858 "
Ds, SU 2695
eB 10.40 00)
‘Offset 1.00
sB0s/04/06 oe
» Ly 20.31 seosioaos size fee Beet
HCO 24,71 10) 28 SLL 27.268 Tyee 400
Onset 787 ,
204g $B05/04/05,
suas (27.21
TypeP HIB 9.00 (10)
meinen 30 (Es ane
Staal 262
169 ,
suse .
Type P
HB 8 00 (10)
‘Ofsel $00
W978
SL 1893,
‘Type Stub
SBO503101 ™
Page 21
Ru,
a
mens
hes SEN B18 f
24y Lr.
LR
ts
=
S
g yw tSila
G Flo 42¢
S$ CIP.
Naz
srr ¢
\.,
= (siege me
178:
25% 54208) BL
Say Bf
eo we
8657 gl eR
B 22.7 Bly 1
B Su 9 a8 5430 27},
we wg) he
Re 38 P6182] HP 3
are
q EGA
a > a ~
i Bisel 4 3) hes:
a is &5€
wy
BB 416% B 232%
90% THT3Q" ‘
p 166.67 user] \ ..
R410 § [® 26% Bp sme
- 415 Se
ty ay one 3 suey
a le 444 20%. Nar ose &y ee,
90° AIS 22.7p & fo7emy 8) 7
RE,
ANON Td WS on—
% 2106,
EAI A? gy GOR
NRL wat he Re 579
75°25 g ~~
Ms AE "7,
AS F"p
‘o “ a
e578
g “7
% 2724p
e att EN 4 Peps
je ie Be S77 Og
UE — yo
SSG, «576
sr
eZ 2 mt
Oe Pee
gegnslend (or NSPE 109%
Page 22
i oy thy, - 90° - ne :
SY AM. Pe » fina2 tale] Sub. 717 i
ae & 4aiti
Les * NS 1
MY, ey su —__
SPF ae. L194, Ye ts t
2 RES ITS H¢ 90 we tt —_—
x 1S 254 Nee Se ig ne
wy Sea > EN, go C
a “Say : ~—t
ts * ' .
me My ie 5 : 7 :
oi TAO er t28730" |
Le is iz 7
° knew OY .
BN Laine !
pay | Yi“
Re _ Ae
ome "30° 6227
ert By sets 829
9
ma
a
290: m
29p NO, ;
Q ew 378 \ &
BD eb tt 97 oo 3493 ” mM
= oe ot Ty30' mae -
*% gleei0 ¥ a
609" = ~ .
E608 & =
3 «(8607 & =
2 on, (608 EF nH ty
+ % ATER f oo “ m |
or mS Maas SY
; CHO A 15 vy z
% “ay —— x
2423 a a 3 at
°° y oh i ? me t >
ie "79%p > 603. a rer net
oe t
422 : :
S 7 Diagram sy
Ne ~
a M
(Pa 438 8S 24hp
SIT 30" Liss 637 . Poon oh aN
Ho ese 2 aS y Sy
fd Toga “St_ au . fa 3432030 "601 3 ae ee
Ae
e600."
Se, 0 ss . Sprmps LAL 7
599 We Powe on
WT57907
en. fe | sites”
pe soes/ FH ly
579 /s80
ah 581 a
1p > 582 ‘ah ts: a
4
Sf os =
7 toe 7 the, =
2. bP erg e ’ chy. s sath ¢ 2
Ce PS] a5" Bs S87 Rte e789 ~
CTE % 588 3 zap \ Q.
Jha aA 1,
es 575 57 4 (55237, “es e-eoip Ra
ee “ 6 — ye)
Rig oe 57 513 96 ee ELIF v
- s witaluas Ce ay \ Mu
Copyright protects this nian, Unauthorised reproduction or enencment ls not permitted. Contact the surveyor or Consutting Surveyors Queensland tor Information.
Page 23
Qa ! a il
eee eee
a az Bs
f
ty Asim - BS.
REX a)
a dha of
ag a PR
_ a Qs a
Re:
zim lyf
S3c Aa
ae4 &
Bain or
pm Pz
= A} a
SF ax i 3
-f ig 8 i 4
.. ue wy i 3s o
: In* = i Se
, Bgl Pa
16 : 1 : ‘23 i: oy ‘
se a
Wes ved
f
PATHWAY! s
Sy! serio" ia] my
e/a Rg
s3e.e720" oaanyY “uro
123 Prim cv
vn ~<AmP sum
=x o4am zon
= Sgeo £20
ms i moe oms
a$ (fas 8%o
on 1 “or
S> Si = a
Zz yt Pio, So
a Riad a7
: read Si4m Aa
7 ™m 8 2 Su
fe ‘E22 22
#2 gig BS 23
ri SIS u
§ > aR ou reo
rods a} mam >on
' aig >
% aie i) z- =z
" is iB So 38
im = nan nw
i iz > >
|e i 18
x tn
Pe OY
bd a.
we
a2
ae
Sa
So
wm
sayeysy ayng Wy]
“Yau! Ue Of sUeYIF FT _JIWIS
Al
fasnjeubls)
Aausofiy sy Aq
asa qygnd of uoasay UMOYS speos Mau ays ajeupap pue
‘voisiapgns Jo ueig Sty; of wasbe { pue) Siyy Jo sojatidosg SY
NIPATHWAY)
1132573"
=
5.
oo
&
x
e 3 j
Copyright protects this plan, Uneuthorised reproduction or amencinent ie not permndted. Contact the surveyor or Consutting Surveyors Quesnstend for intonation.
™
—
—
cO
—
:
1
1
{
Page 24
—3LON—
Note: fron Spikes shown thus +
SHON OTH
MINRd IMAG 33S NV Id"
SHE J0-AdO} TWNIDWO GOS”
es ny
ow
zea
eaa8
: Ri we
: ee Ey]
. Soe ="
ao . i
\ aes. A
: “Face § *¢
: Tag N45 €
i; 3 ERoa Se
= z= BO] ¢
' vv PuE “y <
: » F356" Ni: o
| Ree sie os
i “Ez yi S e
i 1S awe 9
| 5 hi Peers 8
13 | 8524
1 oR 6 oh 3
| ~ z 35 8
I oS a.
% yet
. > an. o . A git, Rt Ec
e 2 § , |. ge i
iQ 5 . Q ee
2 had Vl we
+ °o a NS
i " r
Pa ~
: sa
; be) HQ :.
i gis g "
iz : 3B lon
© x; ERE <
| af Fig e gy!
i => fe <
' ‘ Ra
So
NS
Rs)
CLL87
od
©
mn
“
<=
o
Qo.
.<
a
ao
z
A)
Se,
iS:
my.
oS
NO
Wa
ma
as
Kay
>
9
x
{ss
hay
29
pars
‘cduction oF amendment is not permited. Contact the surveyor orConsuiting Surve\ors Queensiend for information,
(439)
i
5
Page 25
LOT YH SEE BO.P F902
Levs ©7494 5%0 SHR 8 BEOORCT ae)
i
Sub, 440 See GTi Ne. 5%
Sub. 499 See LS. No 15519 (4.2.
Sub, 363 See GTP.No, 685 — -
Subs 434 & 635 See Olan Ne 1784378" tRed de : nm Fn,
fe SHE . we ae 7
Sut. 136 See 13. No. 16366
Sub. £3? See BUP, No.SIS: Co
Subs. 581 & 58% See Plan No. 1799738" . f :
Sub, 496 See BUP. No, 6722 f= vos
Subs, 610 to 612 See Comp. Plan No 1806574" |_——282_
Sub. 61% See B.UP. No. £358 j a —t
Sub. $32 See BUP, No, 4731
Subs. 360° te 609 Sef~Fom,,, Pic. No. 183107 (" ~-
Sut. 4935 See BUF. Ne. 4 J
Suos. 156 & 157 See Plan No, 181372 fees
Sub. 133 See B.UP. No, S186 ‘
Sub. 565 See 'S. No. 18627 (Laws. & Partners! C
Re? Sub
Sub, 585 See B.UP. No, 276
Sub, 392 See LS. No. 19912 (t.0.4)
Subs. 626 & 427 See £5. No. 25623
Suds, 606 & 601 See Comp, Plas Ne, 1875SSP'
19053, eon ot :
|
Sub. 572 See Tony. * ic, 196437 :
lots %2 2 43 See Lome. Plan No. 211 + 1.$-28382 J
Sub. 417 See B.UP. No, 6297 Ow
Sub, 421 See BU.P, No, 3585
Sub. 450 See BUP. No. 4116
hots wit b20 Sen 15. BEe ZS CCI z
Lots 142,103 gee 1 5.28382 bere .
|p \
Lot Suman See £5 LFZST Cras} + -
Lor S38 See 45, 26340 07.2) . (Rel Sub. * Vet Fo.
Lot Se se (1S, adbad (dary ae a IE
lor S35 See 148-29/76 4A) ptt eo
hots aR irB Sea 1S. WRIT Lh) bets 405, a
ne ry ~ 496 = “oJ
lot 678 See “S 29523 CrAm). Sef BE b-06-E 407 » -
Lek 604 ani Gos See Plan 222 15. Gompiceo? | law TO Ove, Adsoc. gr é 06 BE _ 408 st - —4
AS non 22k 7 BD mal Pirie ns Polen ate bets 384 #9 366 itt zi —
BY cag pr Vot rionk Bhuslt pw Gee Keylar Surveging = oe
Lots 33/ed 392 Sea Pe. ZISGIZ Gowns).
Lots 3884389 See Flan 225299 {comp} _|Sansel 1B: mH ¢ Sle 8512 /ne LIT.
bors ars-ar& See KC 2/2687 ase }
Lofts 4/8-420 See Plan No 212686! Bmneokinn. Be és
Le . oe 42.9 4 500
a : - Bee ¢ He
Lot Ges £eE 48. 2793215.F.4 mA) 3 p. jepag Leet 27)
ff ip) -Lor (SO Sasi Seas lot SHSice 1S.99G7°
Lots STEP ST? See Com, ref en, 1? 225206 {VES BS 28 B SEs .
Lot Set See 19. 32677 % Is ce RY 26°
Lot $09 Set 1.5, sues 8) oe t } 7 —}
hor 134 Stes BSEnGCLaPz os eo ee” 7 I
tors #995500 vee 2artoe (om) 4 See Y~ 22dorr 42
bot 4449 S&k 16 3204 (re) 420 — =
Lots 400-492. $00 plan Ne 220200. Se i i
Loe Sod SERS FIER e .
No __. Oo ee
plan. Uns
I
rveyors Guventiahe ‘or inl
nash
st
r
f
eb
nat permated. Contacttnt
choles frac this
Ty
Page 26
ee ee egg "
W312
- FOR OFFICE USE ONLY -
0.6. 16697 1805-207 Por. 28
See Road Dedication No. A. 136317
Subs. 426 to 632, 636 to 437, 593, 595 to 597, 603, 607,
608, 610 to 612 See LS. No. 654
Subs, 535, 563 to 565 See LS. No. 750
Shot G44 SEES B0605 (re)
lorg45 SFE GTP 2346 . .
Ltrs 40 aed Sate 1s B7229Ch99)
tb1'82 S0e 1334395 ;
Ld¢-4% see. 15.977S4Cpart)
Subs.
133 & 180 See 1S. No, 967
Subs. 458 to 470 & 477 to 488 See Plan No, 965664"
Road Dedication 8844580 aver 2136p Sub. 457
Sub, 829 See Plan No, 1132198"
Sub. 597 See LS. No, 7460 (424)
Sub, 894 See 1S. No, 7792 (b24)
Sub. 626 See LS. No 8582 (424)
Subs. 66 & 147 See Plan No. 1338318"
Sub, $62 See B.U,P. No. 1216
Sub. 655 See O/6's Vol.5195 Fols. 207 & 208 Mch3706
Sub, 393 See 1S. No. 10986
Sub. 575 See LS. No, 11655 (KHL)
Sub. 441 See 1S. No, 12136. (KHL)
Sub, $35 See 1S, No, 12137 (KHL)
Sub, 151 See 1S, No. 12808 (KHL)
Sub. 431 See LS. No, 12809 (KHL)
Sub. 563 See 1S. No. 12810 (K.H.L.}
Sub. 573 See tS, No. 12811 (KHL)
Subs. 576 & S75 See Plan No. 1$05828"
Sup. 656 See GTP. No, 261
Subs, 446 & 447 See 1S. No, 13772 IKEHD
Sub, 647 See 1S. No. 13773 iK.EH)
(LaF n FFS~ ., Omer) SEEMS. PESTA,
Lots VE: 4o ste. BIBEFLL
Doh $98 oar ice 1S 100753
gl!
lot 403 See/'S.10 07 95
mony
a) bs 4
jes &4
1 Sub,
Sub.
Sub.
Sud.
Sud.
Sud.
Sud.
Sub.
1 Sub,
j Sub.
Sud.
Sub.
501 See 1S, No. 13772 KHL?
567 See 2S, No, 12921 (KL)
401 See 4S. No. 14080 IK.EH)
606 See 1S. No, 14081 (DHL)
£38 See SUP. No. 6086
421 See LS. No. 16082 (D.HL.}
160 See 1S, No, 16171 (O.HL)
624 See LS. No, 14172 (DHL)
451 See 1S. No, 14250 (KHL)
450 See 1S. No, 16251 KHL)
£39 See GTP. Mo. 310
£61 See G77, No. 389
Subs, 628 & 429 See Plan No. 1682978
Sub. 426 See GiP. No. 610
Sub, £66 See aTP. No. 477
Subs. 500 & 601 See Emf. San No, 1664178"
Sub.
Sub.
Su.
, aun,
Sup.
Sub.
Sub.
Subd.
425 See 3.P. No. 3662
566 See 1S. No. 14922 (L.O.HI
- San No, 1682603"
fan No. 1712988"
651 See GFP. Ne. 374
637 See LS. No. 15066 iL.OH)
502 See iS. No, 15338 (Mt)
, £40 See GTP No. 578
New C.T. Rat.
ey
5822... - B8
Copyright protects this plan. Unauthoris:
plan, . ed reproduction or emendment ts not permitted. Contact the surveyor or Consulting Surveyors Queensland for information,
Page 27
a
— HSN
*_. B22
Ronald Alison MUnnis__. o+ Brisbane
Authorised Surveyor, do hereby solemnly and sincerely declare that 1 have faithfully
and truly surveyed, measured, and marked on the ground the parcel of land her
referred to, and that the measurements and boundaries given in this ptan are correct:
and 1 make this solemn declaration conscientiousty believing the same to be true, and
by virtue of the provisions of the “Qafhs Act of 1867.”
,
he et oct eetiet
Made and Signed 3 Brisbane, tt
1929, before me. iy ge
aye ,
Copyright protects this plan, Unauthorised reproduction or amenciment's not permitted. Contact the surveyor or Consulting Surveyors Gueenslend tor information.
Page 28
ABIIC REDRAWN BY NEAL FITZPATRICK CHECKED BY REL APPROVED BY kn 14.08.1987. 1822._ zw Tm. Io dsSin 03 19peu SBULCON luSeWNDOEYg 2? MBs IVUCRIPDY 104 Copyright protects this ptan. Unauthorised repréckiction or emenciment is not permittes.. Contact the surveyor or Consulting Surveyors Queensland for infonnation.
Page 29
; ae ‘Assessment Checklist”
he Noosa Plan AM Zody Building Works /
This eT eau Fieceeudloens alent tere Mic ocelaciine implement th the Integrated Development
SS none ee (IDAS) under the Integrated Planning Act ee
alte on sas : designed to help determine — . :
PPLE iH ane OE aie ce: a , g
Samco lec Pam ccecca ed eek ed ala faa eae) aero ection
Which codes aré’ Eee aad H
Sal gh Ld eee a A
Steet address 32- bens bE / SONS ME
Lot and pln deta LEX Se waa WZ -
Zone:
Additional Zone if multiple:
Heritage or
Natura’ Hazared (landsidéé flood) Overlay.
SCD = taza,
Alatural Hazard (fre & ASS) Overlay.
Mea Bite theses
Natural Resources Overlay. ~~ —
CORST bee eon =
Eee ay
Material change of use of premises (MCU) ifit is the commencement of a new use or a change
.in the intensity or scale of the existing use
Building work
1 Primary Use: WwAKtny, bretorasia S
[Use Class:
4 Use:
07/3245
Page 30
Trish Sweeney From: Trish Sweeney Sent: Wednesday, 28 February 2007 11:40 AM To: Peter Robinson Subject: New application fee to transfer Peter, could you please transfer $395 from 12023 0423 717 (07/336 building application receipt no 267001:001) to 12000.423.703 (07/344 now a planning application for 32 Ross St, Sunshine Beach. thanks Trish Sweeney Administrative Officer - Land Use Noosa Council Ph: 07 5449 5293 Fax: 07 5447 1062 [email protected]
Page 31
DEVELOPMENT FEES AND CONTRIBUTIONS BONDS AMOUNT ———_y RECEIPT TYPE Building Reinstatement Bond 50 Cat 8 BOND REFUND DETAILS Payee Name: Address: BUILDING SERVICES © : AMOUNT RECEIPT TYPE © Swimming Pool First Reg: - (New) 660 Boundary Setback Relaxation Fee 315 « 632 Doc Lodgement Fee - Stat Group 633 CMS Endorsement Fee 634 Other Building 635 Building Dept - Doc Sales, / Retrieval of Plans 636 Soil Testing 637 Building Search 12023.0423.779 ’ [Building Search - Pool Compliance 12023.0423.723 PAYEE NAME: otter Ka baer! are . POSTAL ADDRESS: oO Pp Qoz_ Hee ADS SITE APPRESS: 32 Foss Coss Somsttind FILE _ : o7f Ske we 2Ilelo7 TOTAL: | 4295 (ED - RECEIPT NUMBER: x£700/
Used in these records
07/0344 - MCU - Preliminary building work assessable against planning scheme [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.