Skip to the record
NoosaWatch™: The source of truth.

Council archive · source document

07/0344 - MCU - Preliminary building work assessable against planning scheme [As Published] · 172007.344

of 31

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1997

WwW Form 1 Development Application

Part E, Version 2.0, 4 October 2004

 

Operational &/or building work

assessable against a local government’s planning scheme

 

ART

 

 

on

 

Completion of all question on Part E is mandatory for all applications involving the assessment of operational work and/or building work (including detailed
engineering plans and other plans, detailed engineering plans for subdivisiona! works and conceptual design plans for engineering & building work when the application does
not involve assessment of a material change of use of premises at the same time) assessable against a local govemment's planning scheme.

 

Nature of the application

A development permit authorises
. development to occur, while a preliminary
approval is a step in the approval process
and does not authorise development to occur.
The types of work that are assessable against
a planning scheme are determined by the
scheme for a particular local govemment and
will vary across the State.
To determine the types of work that are
assessable under a particular planning
«scheme, contact the relevant local

1.

This application is for (tick one (1) or both if applicable)

C1 Preliminary approval - provide details of the type of work eg. roadwork, stormwater, water and sewerage
infrastructure, etc

 

|
AND /OR

{X] Development permit - provide details of the type of work eg. roadwork, stormwater, water and sewerage
infrastructure, etc

| Siting relaxation of proposed extension towards the northern boundary

 

 

 

 

 

 

 

goverment. 2. Are the works subsequent to a previous development approval?
[XJ NO (DYES - provide details of all previous approvals (eg. file references)
| Other than building approval |
3. _ {s the subdivision for a canal estate?
JNO CJ Yes
; Portable Long Service Leave levy (if |4. Is payment of a Portable Long Service Leave (PLSL) levy applicable to the proposal?
: applicable) _
Prior to issuing a development permit for the w ‘YES - complete 05
"works, the assessment manager Is required {1 NO - 05, 6&7 do not apply
{ by law to “sight” an approved form, issued by
‘leave, which signifies thatthe PLSL levy 5. Has the PLSL levy been paid?
: has been paid, ° YES - compieteas
X NO - the applicable levy must be paid before a development permit can be given for the works
6. How much was paid?
| TBA _
7. Whatis the receipt number of the payment?

 

 

| TBA

 

 

PLEASE NOTE

This application cannot be accepted unless accompanied by Part A of Form 1.
The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information

 

requested by Part A and any other relevant part of Form 1.

 

OFFICE USE ONLY (applicable to assessment manager)

 

 

DATE RECEIVED |

 

REFERENCE
NUMBER/S

 

 

 

 

Used in these records

About this file

File size
2.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_0344 - MCU - Preliminary building work assessable against planning scheme [As Published].pdf · 2.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.