ORDINARY MEETING AGENDA 20 APRIL 2017
3. Structures must be designed and constructed such that they are free standing
within the waterway and are not connected to or behind the revetment wall or
rock wall. Upon completion of works, a certification by RPEQ must be provided
to Council in this regard.
4. All structures must have no detrimental effects on stormwater drains and/or
easements.
5. The jetty and deck areas must be constructed in a manner to render the
underside area vermin proof
6. There must be no electrical reticulation system carrying electricity in excess of
24 volts beyond the revetment wall unless all switches and power outlets are
positioned above the 1%AEP flood level.
7. Lighting associated with the use must be designed, installed, operated, and
maintained in accordance with Section 3 of AS4282 Control of the Obtrusive
Effects of Outdoor Lighting.
8. Wastewater and sullage must only be disposed of at approved pumpout facilities.
9. The mooring facility must not be utilised for live-aboard purposes.
10. Any construction and post construction activity is not to impact on the condition
of the waterway, and is to be conducted so as not to breach the Environmental
Protection Act EPA (1994) and the Environmental Protection (Water) Policy
2009.
11. Certification by a Registered Professional Engineer of Queensland that states
that the works have been constructed in accordance with best practice methods
and are structurally sound must be submitted to Council. This certification must
be submitted to Council within three (3) months of the date of this approval. A
final inspection and approval of the structure by Council’s Inspector is also
required. Please contact Council’s Planning Assessment Section (Development
Audit & Response Officer 0428738563) to arrange the inspection.
12. After completion, the proposed works must be maintained in a sound state of
repair in accordance with the approved plans
13. All necessary State government approvals relating to this development must be
obtained.
C. Include the following Advisory Notes:
ADVISORY NOTES:
General Advisory Notes
1. That the Prescribed Tidal Works are to be used for the purpose of providing
access to vessels and the ancillary lawful marine purposes conducted within the
subject lease;
2. That the approval makes it clear that operational works approval in no way
sanctions the use of the decks for a Type 1 Food and Beverage Business (i.e.
café with dining facilities for 10 or more people) or other uses requiring prior
approval under the planning scheme
3. Council has undertaken an audit check of the Operational Works drawings in
relations to the proposed works. A detailed check of the calculations and
drawings has not been undertaken, as they have been certified by a RPEQ. The
RPEQ bears full responsibility for all aspects of the engineering design. Council
reserves the right to require further amendments and/or additions at a later date
should design errors become apparent.
Page 17 of 21
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.