08/0176 - Advice Agency Response (Proposed Lot 10 & 11) - Wetlands [As Published] · 132008.176
Notice Advice Agency Response — Wetlands This notice is issued by the Environmental Protection Agency pursuant to section 3.3.19 of the integrated Planning Act 1997. Mr Shane Adamson Manager - Land Use Noosa Council PO Box 141 TEWANTIN QLD 4565 Your reference : 2008/176 Our reference: Project Ref 324907; File STH7564 Attention: Denis Wallace Dear Mr Adamson Re: Advice concerning (Part of Lot 603 on cc: CBD Settlers Cove Pty Ltd C/- CARE Marloo Consulting Pt PO Box 1684 NOOSA HEADS application for development at 1 Serenity Cove, Noosa Heads, Qld 4567 Plan SP188270, being proposed lots 10 & 11, Parish Weyba, Sunshine Coast Regional Council). Please treat this response as a properly made submission EPA referral number: Response type: IPARO1035008 Advice Agency Response Date application received by EPA: 2 May 2008 ADVICE AGENCY JURISDICTION: | Itern 20 of Table 3 of Schedule 2 of the integrated Planning Regulation 1998. ASSESSMENT MANAGER REFERENCE NUMBER: 2008/176 APPLICANT: CBD Settlers Cove Pty Ltd ACTIVITY DESCRIPTION: Material Change of Use for a lot for the purpose of Accommodation Building and Multiple Dwelling (109) units providing for a five star resort hotel and ancillary facilities Page 1 of 4 + 071009 Environmental Protection Agency www.epa.qid.gov.au ABN 87 221 158 786 Queensland Government Environmental Protectlon Agency Queensland Parks and Wildlife Service
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 3 pages
Page 2
~™ ecoaccess environmental licences and permits ~-. Notice Advice Agency Response 1 Serenity Cove, Noosa Heads, Q. 4567 Cc Lot: 603 Plan: SP188270 DESCRIPTION OF SUBJECT LAND: (Being proposed lots 10 & 11 of the proposed subdivision of the site granted by Council under 23118 DA) Response to Development Application The EPA, acting as an advice agency under the Integrated Planning Act 1997, provides the foliowing advice to the application as detailed above. EPA advice Comments, Issues of Conern, & Biodiversity Values Associated with the Site Real Property description The EPA recognises that the application refers to proposed Lot 10 and 11, being portions of Lot 603 for which Council granted subdivision under 23118 DA. Biodiversity values The report accompanying the application relates (page 6) that: * The site has been partiatly cleared; e Vegetation currently comprises scattered Eucalyptus and Banksia with a predominance of Allocasuarina, Callitris and Acacia species; and ¢ Much of the vegetation has re-grown following previouos clearing operations, with some remnant trees remaining towards the edges. The site is identified by the EPA biodiversity planning assessment as containing remnants of EPA referrable wetlands, and having EPA referrable wetlands immediately to the south. Those wetlands adjacent to the site are apparently identified by the Settlers Cove Master Plan provided on internet at www.settlerscove.com.au as associated with a proposd wetland-waterbody in that location. The EPA's biodiversity assessinent (BPA) identifies areas of remnant vegetation of Lot 603 of Plan SP88287: * Containing highly significant biodiversity and environmental values; ¢ Being surrounded to the north (viz. Noosa River) and west (viz. Weyba Creek) by sensitive environments of highly significant environmental values; ¢ Comprising part of a State significance (wildlife) corridor with linkages via remnant vegetation of State significance to Noosa National Park (in a north-east and south east direction), to Keyser Island Conservation Park and Webyer Creek Conservation Park (in a south western direction), and to other patches of significant remnant vegeation and habitat to the west along Noosa River; Comprising part of a riparian corridor associated with Noosa River; Comprising significat wetlands (with 51-80% of the regional ecosystem being wetland) and habitat for rare and threatened species; and « Containing urban koala area. The development and its impacts on the neighbouring wetlands and any remaining on site needs to be consistent with the objective of the Environmental Protection Act 1994 and so protect Queensland's Page 2 of 4 * 071009 Environmental Protection Agency
Page 3
ecoaccess environmental ficences and permits Notice Advice Agency Response environment while allowing for development that improves the total quality of life, both now and in the future, in a way that maintains the ecological processes on which life depends (ecologically sustainable development). In this instance it indicates: » Need to maintain ecological values of the wetlands by ensuring there is no loss of wetland habitat and adverse impacts from development are avoided. If loss to the wetlands or adverse impacts are unavoidable, loss and impacts are to be minimised and offset so there is no net loss of the impacted wetland values; and ¢ The water quality of any waters in and linked to the wetlands is maintained and managed to protect the environmental values of the wetlands; and * The existing water regime within and linked to the wetlands is maintained and managed to protect existing natural hydrological processes with the wetland ecosystem The wetlands and any waterbody within wetlands adjacent proposed lots 10 and 11 should be considered carefully within the management of stormwater and sediment runoff from the proposed development. SEQ Regional Plan 2005-2026 : Policies of the SEQ Regional Plan 2005-2026 of particular relevance to the proposed development include: ¢ 2.4.4 - Protect, manage and enhance the region's nature conservation and biodiversity values and supporting ecological processes, including areas of state, regional and local biodiverstiy significance; e 2..1.4 - Avioid or mitigate potential adverse impacts in areas of state or regional biodiversity significance inside the Urban Footprint, having regard to the development intent for the land in local governmebnt planning schemes and associated planning instruments, : « 2.2.4 - Ensure development in Urban Koala area includes measures to assist koala survival, having regards to the planning intents and requirements set out in structure plans and planning schemes; * 2.4.1 - Locate, design and manage coastal development to avoid or mitigate adverse efrfects on coastal resources and ecologically sensitive coastal areas; e 2.5.3 - Avoid clearing native vegetation or development within a waterway, wetland, riparian area or floodplain, and where unavoidable mitigate adverse impacts through best practice design, rehabilitation and management. , Stormwater Mangement & Sediment Control The proposed Stormwater Management Plan should ensure that projected water quality criteria consistent with the Environmental Protection (Water) Policy 1997 are met during both the construction and operational phases. Preferably a stormwater management plan should: , e Be developed by a suitably qualified engineer; . ¢ Demonstrate how the environmental values and water quality of onsite and adjacent water bodies will be protected; Demonstrate full application of water sensitive urban design principles; and : : e Show the stormwater treatment train and any discharge point(s) and receiving areas for treated stormwater. Stormwater discharge quality should comply with the Environmental Protection (Water) Policy 1997 and meet the objectives of the Queensland Water Quality Guidelines 2006. General Comment The proposed intensity/scale of development appears to exceed that prescribed by the supersceded planning scheme. Recommendation The applicant be required to: ¢ Demonstrate compliance with the ojective of the Environmental Protection Act and its implications as outlined above; and . * Demonstrate consistency with the SEQ Regional Plan and its policies as outlined above. Page 3 of 4 + 071009 - Environmental Protection Agency
Page 4
ecoaccess
environmental licences and permits
Notice
Advice Agency Response
Additional information for applicants
It is a requirement of the Environmental Protection Act 1994 that if the owner or occupier of this site becomes
aware that a Notifiable Activity (as defined under Schedule 2 of the Environmental Protection Act 1994) is being
carried out on this land or that the land has been affected by a hazardous contaminant, they must, within thirty
(30) days after becoming aware the activity is being carried out, give notice to the Environmental Protection
Agency. A list of Notifiable Activities is provided within Schedule 2 of the Environmental Protection Act 1994.
Yours sincerely
4g ul _ 30 Meer 200€
VS
Signature Date
Enquiries:
John Harden Dr Anne Bothwell
A/Planning Manager, SEQ District Senior Planning Officer
Delegate for southern region, EPA
Southern Region, EPA Telephone: (07) 3225 8817
Facsimile: (07) 3238 3514
Page 4 of 4 « 071009 Environmental Protection Agency
{
Used in these records
08/0176 - Advice Agency Response (Proposed Lot 10 & 11) - Wetlands [As Published]Related documentApplication case desk ↗
About this file
- File size
- 196 KB (small file)
- File type
No other editions are linked here.