SUPERSEDED - Decision Notice - Concurrence Agency - DERM [As Published] · 142009.684
2009/684
2. No posts or vertical supports of the proposed jetty are to extend vertically from the structure
unless they provide support for the handrail. In this regard, the proposed fenders on the jetty head
shall be limited in height to the top of the adjacent jetty deck.
3. All structures associated with the jetty and pontoon must be constructed wholly within the
approved Resource Entitlement Area.
4. Structures should be designed and constructed such that they are free standing within the
waterway and are not connected to the revetment wall or rock wall.
5. A rigid handrail shall be fitted on one side of the walkway.
6. No boat lifting devices are to be attached or moored at the jetty structure for the purpose of
elevating a vessel above the water without Council approval.
7. The jetty shall be constructed in a manner to render the underside area vermin proof.
8. There shall be no electrical reticulation system carrying electricity in excess of 24 volts beyond
the revetment wall.
9. Lighting associated with the use shall be designed, installed, operated, and maintained in
accordance with Section 3 of AS4282 Control of the Obtrusive Effects of Outdoor Lighting.
10. The jetty is to be used for private purposes only with no commercial operations to be
undertaken.
11. Boat repair activities will not be permitted on site.
12. Wastewater and sullage shall only be disposed of at approved pump out facilities.
13. The mooring facility shall not be utilised for live-aboard purposes.
14. Any construction and post construction activity is not to impact on the condition of the
waterway, and is to be conducted so as not to breach the Environmental Protection Act (EPA)
1994 and the Environmental Protection (Water) Policy 1997.
15. The approval or conditions do not constitute a ruling on structural safety and the applicant
must make their own arrangements to ensure adequacy of design and work. This approval
does not warrant that such plans and specifications have been checked in detail, nor does it
absolve the owner of the land from complying with all the conditions of this approval and/or
relevant Council By-Laws and Policies and/or relevant statutes and/or statutory regulations in
the execution and/or performance of said works. The Council does not accept any
responsibility for the accuracy of such plans and specifications as approved.
16. Certification by a Registered Professional Engineer of Queensland shall be submitted to
Council prior to the return of any bond monies held by Council. The certification shall state that
the jetty, pontoon and regatta stairs have been constructed in accordance with best practice
methods, are accordance with Coastal Protection and Management Act 1995, are structurally
sound and will have no detrimental affect on the existing revetment walls. A final inspection
and approval of the structure by Council’s Inspector is also required prior to the return of any
bond monies held by Council. Please contact Council’s Land Development Section to arrange
the inspection.
17. A final inspection and approval of the structure by Council’s Inspector is required prior to the
return of any bond monies held by Council. Please contact Council’s Land Development
Section to arrange the inspection.
18. The jetty shall be licensed with the Council upon completion of the structural work and shall be
licensed annually thereafter.
19. The Development Permit for Operational Works lapses if the works have not been completed
by 23 June 2011, unless an application to extend the currency is approved by Council.
Page 2 of 12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED - Decision Notice - Concurrence Agency - DERM [As Published]Related documentApplication case desk ↗
About this file
- File size
- 295 KB (small file)
- File type
No other editions are linked here.