Skip to the record
For the highest quality transcripts.

Council archive · source document

Information Response to DNRM MCU12/0208

of 10

Text shows just the words. Original shows the document exactly as it was published.

     Ecosystem Map – v6.1 can be downloaded at www.derm.qld.gov.au/remap .



     Results of preliminary assessment

     The referral of your application was not accompanied by sufficient information demonstrating compliance with
     the MCU Policy and RVM Code.

     It is apparent from the submitted Property Vegetation Management Plan (PVMP) and information that the intent
     of the project is to avoid clearing remnant vegetation by ensuring infrastructure is adequately setback from
     vegetation. The exception is the clearing proposed for access to the site from Hollett Road.

     A preliminary assessment has been conducted based on provided plans, specifically the Master Plan, Proposal
     Plan, Structure Plan and Koala Habitat and Vegetation Offset areas. There is an inconsistency in these plans in
     identifying the extent of development proposed which results in uncertainty about the amount of vegetation
     clearing required.

Response:

An assessment of the proposed Noosa on Weyba development against the relevant Performance Requirements of the
MCU Policy and the RVM Code is provided within the amended Property Vegetation Management Plan within Table 3-
1 and Table 3-2 respectively (see Attachment 1). We further note to the Department of Natural Resources and Mines
that the amended reports have taken into account the issues with clearing for the Hollett Road extension and
subsequently the amended documentation identifies that only a small proportion of Hollett Road will be constructed.

Department of Natural Resources and Mines

     Additional information required to assess the application

     Further information is required to be submitted to DNRM which includes:

          A plan and GIS shapefile of the setbacks proposed between mapped remnant vegetation and proposed
              infrastructure around all mapped remnant vegetation.

          Clarify the tracks to be created through mapped remnant vegetation – in particular any new
              roads proposed through the endangered remnant vegetation on lot 11. Picture below is from
              the provided ‘Illustrative Concept Master Plan’.




                                                        4

Used in these records

About this file

File size
1.0 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Information Response to DNRM MCU12_0208.pdf · 1.0 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.