16844 CAR notice · OPW14/0370
Attached to the e-mail OPW14/0370 - Concurrency Agency Response with conditions.
SDA-1214-016844
No. Conditions Condition timing
maintained until their
completion
4. Should the works become damaged as a result of erosion, At all times
flooding or storm tide inundation, the registered landowner(s) of
the land to which the works are attached, shall be responsible for
the collection and removal of all debris, previously being a part of
the works, at their own expense.
5. Any disturbed or oxidised acid sulfate soil must be treated and For the duration of
managed in accordance with the current Queensland Acid Sulfate the works the subject
Soil Technical Manual: Soil Management Guidelines v4.0, of this approval.
prepared by the Department of Science, Information Technology,
Innovation and the Arts, 2014.
7.2.15 Tidal works (maritime safety)—Pursuant to section 255D of the Sustainable Planning Act
2009, the chief executive administering the Act nominates the Director-General of the Department
of Transport and Main Roads to be the assessing authority for the development to which this
development approval relates for the administration and enforcement of any matter relating to the
following condition(s):
6. Provide written notice to the Regional Harbour Master (Brisbane), When the
Maritime operations Base, MacArthur Avenue East, PINKENBA development
QLD 4008, when the development authorised under this approval authorised under this
has started, and when it has been completed. approval has started
These notices must state this permit number, the location and and when it has
name of registered place and the condition number under which been completed
the notice is being given.
7. “As constructed” drawings must be provided to the Regional Within two weeks of
Harbour Master (Brisbane), Maritime operations Base, MacArthur the completion of the
Avenue East, PINKENBA QLD 4008. works
8. The structure must be lit/marked in accordance with section 3 of At all times
AS4282-1997 ‘Control of the obtrusive effects of outdoor lighting’,
such that it does not cause a risk to the safe navigation of other
ships.
9. Any navigational aid that is damaged due to the construction, At all times
operation or maintenance of the approved development must be
promptly repaired or replaced at the applicant’s cost. In the event
that any damage is caused to any aid to navigation, the Harbour
Master must be immediately contacted on 07 3305 1700.
10. The construction, operation or maintenance of the structures, and At all times
any ship moored at this structure, must not impede the safe
navigation of other ships or restrict safe access to or from
neighbouring structures.
11. Any debris or similar obstruction encountered whilst undertaking Prior to the
the work must be promptly and suitably disposed of at the completion of the
applicant’s cost. works.
Department of State Development, Infrastructure and Planning Page 5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
16844 CAR notice.pdfRelated documentApplication case desk ↗
About this file
- File size
- 224 KB (small file)
- File type
No other editions are linked here.