Decision Notice - Minor Change - 132002 220460 5 [As Publised] · 132002.220460.5
Officer: Georgina Schramm
Direct Telephone: 07 5329 6569
Our Reference: 132002.220460.5
Your Reference: n/a
27 July 2023
Mr BF Benson
C/- Brennan Planning Pty Ltd
44 Maple St
COOROY QLD 4563
[email protected]
Dear Sir/Madam,
Decision Notice – Minor Change
Planning Act 2016
I refer to your application received on 19 May 2023, requesting a minor change to an existing
development approval. Council decided your requested changes.
Details of the decision are as follows:
1. APPLICATION DETAILS
Application No: 132002.220460.5
Street address: Bluetongue 2/4 Bryan Street, Sunshine Beach
Real property description: Lot 0 SP 202482, Lots 1-2 SP 202482
Planning Scheme: Noosa Plan 2020 (25 September 2020)
2. DECISION DETAILS
The following type of approval was issued on 1 May 2003.
• Development Permit for Material Change of Use of Premises – Duplex Dwelling
In relation to the request to make a minor change to the existing approval, Council on 26 July 2023,
decided to approve the requested changes. The changes are detailed below.
A. Approve the change.
B. Include additional condition 60.
3. CURRENCY PERIOD OF APPROVAL
The currency period for this development approval is stated in the conditions below.
ABN 97.969.214.121 PO Box 141
noosa.qld.gov.au Tewantin QLD 4565
[email protected] 07 5329 6500
Page 1 of 9
Document Set ID: 22521935
Version: 5, Version Date: 27/07/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 8 pages
Page 2
4. ASSESSMENT MANAGER CONDITIONS
Land Use
1. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are numbered DA-01B to DA –05B,
DA-07D, DA-08B, DA-09B, DA-10c & DA-12B dated 25.07.04 and prepared by Scott Mayes
Design Services and Sheet No. 3 of 6, drawing titled Proposed 3rd Floor Addition & 2nd Floor
alterations to Existing unit, prepared by Accolade Building Designs dated 28/02/2018 and as
annotated by Council and as may be amended by these conditions.
2. The building is not to exceed a maximum of 12 metres and 3 storeys above both natural and
finished ground levels.
3. A verification survey of the building is to be carried out by a Licensed Surveyor and a
certificate lodged with Council at completion of the work confirming compliance with the
maximum building height above natural surface, required by the provisions of the Planning
Scheme, apart from the lift shaft, which may extend in part to a maximum of 12.57 metres.
4. Any deck areas are not to be enclosed with shutters, glass panelling or the like, thus
remaining as open structures.
5. Balustrading of all decks is to be of an open transparent material.
6. The development must be undertaken and operated in a manner that causes no detrimental
effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
lighting nuisance or other emissions.
7. The open space and setback areas are to be landscaped in accordance with Council’s Policy
on Landscaping Guidelines and a properly prepared landscape plan prepared by a suitably
qualified Landscape Architect or Horticulturalist. Such landscaping is to be completed prior
to the premises being occupied and maintained at all times thereafter and to include the
following:-
7.1. Dense landscaping, comprising mature tree species is to be undertaken towards the
road frontage of the property and is to comprise a minimum of 3 x 100 Litre tree species
and include ground covers and shrubs. Landscaping provided on the road reserve is
to comprise a minimum of 2 street trees (100 litre);
7.2. Species planted are to comprise locally endemic species.
7.3. Deleted.
8. Any fencing provided in conjunction with the development is to be setback an average of two
(2) metres to any road frontage.
9. Deleted.
10. Security in the form of a cash bond or trading bank guarantee to the sum of $15 000 must
be submitted, to secure performance of all conditions of this approval, prior to the issue of a
Development Permit for operational works. The cash bond or trading bank guarantee will be
returned on performance of the conditions of approval less any costs incurred by Council in
respect of enforcing performance of this permit.
11. The requirements of this development approval are to be effected, prior to the use of the
premises. Council reserves the right to call upon the bond or guaranteed sum referred to in
this approval to effect compliance with conditions.
12. This Development Permit for a material change of use of premises lapses if:-
12.1. the use or erection of a building or other structure associated with the use, has not
been commenced by 20 March 2007, unless application is made and approved by
Council for an extension; or
12.2. the use of any premises pursuant to the Development Permit ceases.
Page 2 of 9
Document Set ID: 22521935
Version: 5, Version Date: 27/07/2023
Page 3
13. The developer must obtain all of the other Development Permits referred to in the Decision
Notice, prior to obtaining a Development Permit for building works.
Land Development
Vehicle Access
14. A 3.0 metre wide concrete access driveway shall be constructed from the street frontage of
the development into the site.
15. The vehicle access driveway shall be designed and constructed to Council’s design
standards and to grades that prevent vehicles from scraping and/or bottoming. Should any
driveways be constructed to grades that do not comply with AS2890.1-1993 or as modified
by Council’s Standard Drawing 9019, which allows a maximum grade of 1 in 4, Council will
require that the driveway be removed and reconstructed to levels that do comply.
To this extent the applicant shall submit detailed engineering plans prior to obtaining a
Development Permit for Operational Works that accurately illustrate the design levels for the
driveway and also the design gradients.
The applicant shall note that Council will not approve a driveway that results in vehicles
scraping and/or bottoming.
16. No vehicle will be permitted to reverse from the carpark area, down the driveway, and onto
the street. All vehicles shall enter and leave the site in a forward direction.
Vegetation Protection
17. Deleted.
Carparking
18. Carparking shall be provided on site, within the proposed basement carpark, generally as
shown on drawing number DA-02B, dated 25/07/04, as prepared by Scott Mayes Design
Services, project number 862 except as modified herein.
19. All carparking shall comply with the provisions of AS 2890.1-1993 for user class 3.
20. In accordance with AS2890.1-1993, section 5.3 - Headroom, the minimum head clearance
(headroom) at any point within the basement carpark shall be 2.2 metres.
21. All carparking shall be kept, maintained, and line-marked in a condition fit for use.
Roadworks Contributions
22. A roadworks contribution of $963.33 towards the Coastal Major Road Network shall be paid
to the Council prior to obtaining a Development Permit for Operational Works. This amount
will be subject to variations in the Price Index, All Groups Brisbane from June 2002 until the
date of payment.
Beach Access Contributions
23. A contribution toward the provision of beach access shall be paid in accordance with
Council’s Planning Scheme Policy PSP 4 on Beach Access Contributions prior to the issue
of a Development Permit for Operational Works. The amount of the contribution shall be
calculated at the rate current at the date of payment. An estimate only of the contribution
rate as of September 2002 was $65 per accommodation unit.
Earthworks
24. Prior to undertaking any excavation, the person acting on this permit shall contact all public
utility service providers to ascertain the location of their underground services.
25. The transportation of all materials to and from the site shall be undertaken in a manner such
that no particle matter escapes onto a public road. All vehicles carrying materials either to
or from the site shall be covered to prevent materials including dust being windblown from
the vehicle.
Page 3 of 9
Document Set ID: 22521935
Version: 5, Version Date: 27/07/2023
Page 4
26. Any earthworks required on site shall be carried out in accordance with Section 3.8 of
Council's "Engineering Design Standards" manual and so as not to cause the ponding of
water on any adjoining lands or the blockage of, or interference with, any natural
watercourses.
Retaining Walls
27. A Registered Professional Engineer Queensland shall design any retaining walls greater
than one (1) metre in height and submit detailed plans for Council approval prior to obtaining
a Development Permit for Operational Works.
Retaining wall designs shall also incorporate a 1 metre high fence or similar if there is a risk
of people falling from the high side of the wall.
Frontage Works
28. Footpath improvements such as topsoiling, grassing, and tree planting will be required to the
street frontage in accordance with Planning Scheme Policy PSP1 Landscaping Guidelines.
Grass shall be couch, free of weeds.
29. A new 2 metre wide concrete path shall be constructed along the frontage of the site where
there is not already a concrete path or where the existing path is damaged.
30. The new path shall be designed and constructed to levels that minimise the risk of
pedestrians from tripping or slipping and the path shall join neatly and smoothly with the
existing paths. Care shall be taken to protect any significant vegetation or any underground
services.
31. All redundant vehicular crossings to the site shall be removed and replaced by kerb &
channel and footpath paving in accordance with Council’s Standard specifications prior to
commencement of the use permitted by this permit.
32. A Development Permit for Operational Works shall be obtained prior to the commencement
of any frontage works. Footpath and property alignment levels may be obtained from
Council’s Works Directorate upon request.
Stormwater Drainage
33. Roof and surface water is to be collected on site and is to be discharged through at least two
(2) separate underground drain lines into Bryan Street via Council’s street drainage system.
The maximum discharge allowable to Council’s kerb & channel at any one location is 25
litres/second.
In this regard, a Development Permit for Building Works shall not be granted until a
Development Permit for Operational Works has been issued.
Headworks
34. Contributions shall be paid to Council in accordance with Planning Scheme Policies PSP28
and PSP30 on Water Supply Headworks Contributions and Sewerage Headworks
Contributions respectively and at the rates applicable at the time of payment. An estimate
only of the contribution rates as of September 2002 under the current policies is as follows:
Water Supply $ 3,570
Sewerage $ 2,696
TOTAL $ 6,266
All headworks contributions must be paid prior to the issue of a Development Permit for
Operational Works.
Alternatively a trading bank guarantee shall be submitted to Council plus 20%. Should the
headworks contributions not be paid at the due time, Council shall call upon the trading bank
guarantee in full.
Page 4 of 9
Document Set ID: 22521935
Version: 5, Version Date: 27/07/2023
Page 5
In the event that the Development Permit for Material Change of Use of Premises lapses or
is cancelled, the contribution or trading bank guarantee will be returned.
Erosion and Sediment Control
35. Any person acting on this permit shall prevent erosion and sediment export from leaving the
site. Site control measures such as silt fencing, controlled gravel access to the site and
controlled disposal of waste, will be necessary.
In this regard plans detailing the methods of controlling erosion and sediment are required
to be submitted to the Council for approval prior to obtaining a Development Permit for
Operational Works.
General
36. The site shall be connected to Council's existing water supply and sewerage reticulation
systems and be constructed in accordance with Council’s standards and requirements at no
cost to Council.
37. Water meters shall be provided to each individual unit and shall extend from the water supply
system to the property boundary in accordance with Council's standards.
38. Any damage caused to any public utility during the course of construction shall be repaired
to Council’s standards and at no cost to Council.
39. Any alteration of any public utility or other facilities necessitated by the development of the
land or associated construction works external to the site shall be at no cost to Council.
Environmental Health
40. The development must be undertaken and operated in a manner that causes no detrimental
effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
lighting, dust or odour nuisance or any other emissions in accordance with the nuisance
provisions of the Environmental Protection Regulation 1998. On the spot fines apply for such
offences.
41. Swimming pool or spa pumps are to be contained in an acoustically treated enclosure or
located in a manner which prevents a noise nuisance beyond the subject land in accordance
with the nuisance provisions of the Environmental Protection Regulation 1998. On the spot
fines apply for such offences.
42. All lift plant including motors, shall be situated within the building or suitably provided with
noise reduction measures and located as to prevent a noise nuisance beyond the subject
land in accordance with the nuisance provisions of the Environmental Protection Regulation
1998. On the spot fines apply for such offences.
43. Air conditioning units shall be located in a manner which prevents noise nuisance beyond
the subject land in accordance with the nuisance provisions of the Environmental Protection
Regulation 1998 and Council’s Local Law No. 12 - Control of Nuisances. On the spot fines
apply for such offences.
An occupier of premises where there is air-conditioning equipment must not use or allow the
use of the equipment -
43.1. before 7am or after 10pm on any day if it makes noise or causes noise to be made of
more than the higher of the following -
43.1.1. 40 dB(A)
43.1.2. 3 dB(A) above the background noise level
43.2. from 7am to 7pm on any day if it makes noise or causes noise to be made of more than
the lower of either of the following -
43.2.1. 50 dB(A)
43.2.2. 5 dB(A) above the background noise level
Page 5 of 9
Document Set ID: 22521935
Version: 5, Version Date: 27/07/2023
Page 6
43.3. from 7pm to 10pm on any day if it makes noise or causes noise to be made of more
than 3 dB(A) above the background noise level.
44. Swimming/spa pool fencing, gates and wall openings within these areas to comply with
Australian Standard 1926 for pool safety. Display resuscitation chart at each pool, which are
free from Council’s Environmental Health Section.
Building
45. There is to be no uncontrolled discharge of water onto the slope.
46. Stripping of vegetation for construction purposes should be minimised. If vegetation is
destroyed it should be reinstated immediately after construction is completed.
47. Additional load due to fill, construction equipment or stockpiled materials should not be
located on the dune slope. Filling in the open space area is to be avoided.
48. The use of vibratory equipment of any kind is not permitted to be used, including vibrating
rollers, the use of vibrating installation techniques for sheet piling and other construction
vibrations caused by excavating, earthmoving or demolition machinery or other similar
construction techniques.
49. A condition survey is to be carried out of adjoining buildings, structures and services prior to
any construction works taking place on site. If distress already exists, a photographic survey
shall be undertaken, the distress measured and a plan to monitor changes to distress shall
be implemented. A copy of this report is to be submitted to Council within 5 business days of
survey and prior to construction work proceeding.
50. Copies of all inspection reports by engineers are to be submitted to Council within 5 business
days of the inspection taking place.
51. The geotechnical engineer will be required to be on site for the whole of the time during the
basement excavation. No work of any such kind relating to the excavation of the basement
shall be carried out if he is not on the site supervising and directing this work. The consulting
geotechnical engineer shall carry out regular site inspections (and testing as required). Site
inspections shall be carried out prior to and during critical stages of construction (eg.
commencement of excavation, installation of piles, excavation near sensitive structures).
Such works shall only be carried out during dry weather conditions and if there is a risk of
sand movement occurring, all work shall be suspended until such steps, approved by the
geotechnical engineer have been taken to ensure that no further slippage will result.
52. The builder, landscaper and all workers associated with the construction of the works on this
site shall at all times comply with the directions of the consulting geotechnical engineer.
53. The applicant shall pay Council’s reasonable costs in relation to any geotechnical advice
sought by it in relation to this development provided that a quotation of the likely costs to be
incurred be obtained from the Council’s consultants Messrs Coffey Geosciences Pty Ltd and
that the amount of such costs be agreed to by the applicant before the advice is obtained.
54. Link wall movement shall be monitored throughout construction by an engineer and if
movement occurs construction is to be stopped immediately and appropriate action is to be
taken to arrest the movement. Further work shall only take place after a re-assessment of
the conditions on site by the engineer.
55. The client is to engage the services of a suitably qualified engineer to oversee the piling
works and copies of all inspection reports are to be submitted to Council within 5 business
days of the inspection taking place.
Additional Condition:
56. Water saving devices shall be included for all dwelling units with a maximum 9L per minute
restrictor on all showers.
57. The 3rd storey façade to the front boundary shall be setback a minimum of 8.5m.
Page 6 of 9
Document Set ID: 22521935
Version: 5, Version Date: 27/07/2023
Page 7
58. Both reversing bays shall be provided with a signpost and painted pavement markings to
clearly define the area as “No Parking - Reversing Area Only”.
59. The developer must provide a suitably screened imperviously paved area large enough for
all refuse and recycling containers
Additional Condition – 26 July 2023 – Additional Plans Unit 2 (132002.220460.5)
60. Development is to be undertaken in accordance with Condition 1 and the approved plans of
development. The approved plans relating to the development and Level 2 of Unit 2 are listed
in the following table unless otherwise amended by these conditions.
Plan No. Rev Plan Name Date
21148-SK01 P2 Level 2 – Floor Plan, prepared by PJ Concepts & 6.03.2023
Designs
21148-SK02 P1 West Elevation, prepared by PJ Concepts & 6.03.2023
Designs
5. REFERRAL AGENCIES
Not applicable.
6. ADVISORY NOTES
Infrastructure Charges
1. All developments and/or changes to existing developments may require payment of
“Infrastructure Charges” (as applicable) in accordance with Council’s “Charges Resolution”
made pursuant to the planning legislation and regulations current at the time of issue. For
further information, please refer to https://www.noosa.qld.gov.au/planning-
development/development-tools-guidelines/infrastructure-charges
7. PROPERTY NOTES
Not applicable.
8. VARIATION APPROVAL DETAILS
Not applicable.
9. FURTHER DEVELOPMENT PERMITS REQUIRED
Type of Development Permit Required Subject of the required Development Permit
Development Permit for Operational Works Driveway/Access and Stormwater Drainage
Development Permit for Building Works All Building Works
10. SUBMISSIONS
Not applicable.
11. RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Planning Act 2016 is attached.
12. OTHER DETAILS
If you wish to obtain more information about the decision, electronic copies are available online at
www.noosa.qld.gov.au or at Council Offices.
Page 7 of 9
Document Set ID: 22521935
Version: 5, Version Date: 27/07/2023
Page 8
Yours faithfully,
Georgina Schramm
Development Planner
Enc: Appeal Rights
Approved Plans/Documents
cc. Unitywater
DECISION NOTICE HISTORY
• Original Decision Notice – 1 May 2003.
• Negotiated Decision Notice – 3 July 2003, with an amendment to conditions 1, 17, 18 & 51 and delete condition 7.3.
• Decision Notice – Minor – 132002.220460.2 – 25 November 2004, with an amendment to conditions 1, 7, 17 & 18 and additional
conditions 57, 58, & 59 and delete conditions 9 & 17.
• Decision Notice - Minor – 132002.220460.3 – 7 February 2007, with an amendment to condition 3.
• Decision Notice – Minor - 132002.220460.4 – 23 April 2018, with an amendment to condition 1.
• Decision Notice – Minor – 132002.220460.5 – 26 July 2023, include additional condition 60.
Page 8 of 9
Document Set ID: 22521935
Version: 5, Version Date: 27/07/2023
Page 9
Appeal Rights
PLANNING ACT 2016 & PLANNING REGULATION 2017
Chapter 6 Dispute resolution (3) The appellant or, for an appeal to a tribunal, the registrar must,
within the service period, give a copy of the notice of appeal to –
Part 1 Appeal rights
(a) the respondent for the appeal; and
229 Appeals to tribunal or P&E Court
(b) each co-respondent for the appeal; and
(1) Schedule 1 of the Planning Act 2016 states –
(c) for an appeal about a development application under schedule
(a) Matters that may be appealed to –
1, table 1, item 1 – each principal submitter for the
(i) either a tribunal or the P&E Court; or development application; and
(ii) only a tribunal; or (d) for and appeal about a change application under schedule 1,
table 1, item 2 – each principal submitter for the change
(iii) only the P&E Court; and
application; and
(b) The person-
(e) each person who may elect to become a co-respondent for the
(i) who may appeal a matter (the appellant); and appeal, other than an eligible submitter who is not a principal
submitter in an appeal under paragraph (c) or (d); and
(ii) who is a respondent in an appeal of the matter; and
(f) for an appeal to the P&E Court – the chief executive; and
(iii) who is a co-respondent in an appeal of the matter; and
(g) for an appeal to a tribunal under another Act – any other
(iv) who may elect to be a co-respondent in an appeal of the
person who the registrar considers appropriate.
matter.
(4) The service period is –
(2) An appellant may start an appeal within the appeal period.
(a) if a submitter or advice agency started the appeal in the P&E
(3) The appeal period is –
Court – 2 business days after the appeal has started; or
(a) for an appeal by a building advisory agency – 10 business
(b) otherwise – 10 business days after the appeal is started.
days after a decision notice for the decision is given to the
agency; or (5) A notice of appeal given to a person who may elect to be a co-
respondent must state the effect of subsection (6).
(b) for an appeal against a deemed refusal – at any time after the
deemed refusal happens; or (6) A person elects to be a co-respondent by filing a notice of election,
in the approved form, within 10 business days after the notice of
(c) for an appeal against a decision of the Minister, under chapter
appeal is given to the person.
7, part 4, to register premises or to renew the registration of
premises – 20 business days after a notice us published under 231 Other appeals
section 269(3)(a) or (4); or
(1) Subject to this chapter, schedule 1 and the P&E Court Act, unless
(d) for an appeal against an infrastructure charges notice – 20 the Supreme Court decides a decision or other matter under this
business days after the infrastructure charges notice is given Act is affected by jurisdictional error, the decision or matter is non-
to the person; or appealable.
(e) for an appeal about a deemed approval of a development (2) The Judicial Review Act 1991, part 5 applies to the decision or
application for which a decision notice has not been given – matter to the extent it is affected by jurisdictional error.
30 business days after the applicant gives the deemed
(3) A person who, but for subsection (1) could have made an
approval notice to the assessment manager; or
application under the Judicial Review Act 1991 in relation to the
(f) for any other appeal – 20 business days after a notice of the decision or matter, may apply under part 4 of that Act for a
decision for the matter, including an enforcement notice, is statement of reasons in relation to the decision or matter.
given to the person.
(4) In this section –
Note – decision includes-
See the P&E Court Act for the court’s power to extend the appeal
(a) conduct engaged in for the purpose of making a decision; and
period.
(b) other conduct that relates to the making of a decision; and
(4) Each respondent and co-respondent for an appeal may be heard
in the appeal. (c) the making of a decision or failure to make a decision; and
(5) If an appeal is only about a referral agency’s response, the (d) a purported decision; and
assessment manager may apply to the tribunal or P&E Court to
(e) a deemed refusal.
withdraw from the appeal.
non-appealable, for a decision or matter, means the decision or
(6) To remove any doubt. It is declared that an appeal against an
matter-
infrastructure charges notice must not be about-
(a) is final and conclusive; and
(a) the adopted charge itself; or
(b) may not be challenged, appealed against, reviewed, quashed,
(b) for a decision about an offset or refund-
set aside or called into question in any other way under the
(i) the establishment cost of trunk infrastructure identified in Judicial Review Act 1991 or otherwise, whether by the
a LGIP; or Supreme Court, another court, a tribunal or another entity; and
(ii) the cost of infrastructure decided using the method (c) is not subject to any declaratory, injunctive or other order of
included in the local government’s charges resolution. the Supreme Court, another court, a tribunal or another entity
on any ground.
230 Notice of appeal
232 Rules of the P&E Court
(1) An appellant starts an appeal by lodging, with the registrar of the
tribunal or P&E Court, a notice of appeal that- (1) A person who is appealing to the P&E Court must comply with the
rules of the court that apply to the appeal.
(a) is in the approved form; and
(b) succinctly states the grounds of the appeal. (2) However, the P&E Court may hear and decide an appeal even if
the person has not complied with the rules of the P&E Court
(2) The notice of appeal must be accompanied by the required fee.
Page 9 of 9
Document Set ID: 22521935
Version: 5, Version Date: 27/07/2023
Used in these records
Decision Notice - Minor Change - 132002 220460 5 [As Publised].pdfRelated documentApplication case desk ↗
About this file
- File size
- 168 KB (small file)
- File type
No other editions are linked here.