Decision Notice - Minor Change - 132002 220460 5 [As Publised] · 132002.220460.5
26. Any earthworks required on site shall be carried out in accordance with Section 3.8 of
Council's "Engineering Design Standards" manual and so as not to cause the ponding of
water on any adjoining lands or the blockage of, or interference with, any natural
watercourses.
Retaining Walls
27. A Registered Professional Engineer Queensland shall design any retaining walls greater
than one (1) metre in height and submit detailed plans for Council approval prior to obtaining
a Development Permit for Operational Works.
Retaining wall designs shall also incorporate a 1 metre high fence or similar if there is a risk
of people falling from the high side of the wall.
Frontage Works
28. Footpath improvements such as topsoiling, grassing, and tree planting will be required to the
street frontage in accordance with Planning Scheme Policy PSP1 Landscaping Guidelines.
Grass shall be couch, free of weeds.
29. A new 2 metre wide concrete path shall be constructed along the frontage of the site where
there is not already a concrete path or where the existing path is damaged.
30. The new path shall be designed and constructed to levels that minimise the risk of
pedestrians from tripping or slipping and the path shall join neatly and smoothly with the
existing paths. Care shall be taken to protect any significant vegetation or any underground
services.
31. All redundant vehicular crossings to the site shall be removed and replaced by kerb &
channel and footpath paving in accordance with Council’s Standard specifications prior to
commencement of the use permitted by this permit.
32. A Development Permit for Operational Works shall be obtained prior to the commencement
of any frontage works. Footpath and property alignment levels may be obtained from
Council’s Works Directorate upon request.
Stormwater Drainage
33. Roof and surface water is to be collected on site and is to be discharged through at least two
(2) separate underground drain lines into Bryan Street via Council’s street drainage system.
The maximum discharge allowable to Council’s kerb & channel at any one location is 25
litres/second.
In this regard, a Development Permit for Building Works shall not be granted until a
Development Permit for Operational Works has been issued.
Headworks
34. Contributions shall be paid to Council in accordance with Planning Scheme Policies PSP28
and PSP30 on Water Supply Headworks Contributions and Sewerage Headworks
Contributions respectively and at the rates applicable at the time of payment. An estimate
only of the contribution rates as of September 2002 under the current policies is as follows:
Water Supply $ 3,570
Sewerage $ 2,696
TOTAL $ 6,266
All headworks contributions must be paid prior to the issue of a Development Permit for
Operational Works.
Alternatively a trading bank guarantee shall be submitted to Council plus 20%. Should the
headworks contributions not be paid at the due time, Council shall call upon the trading bank
guarantee in full.
Page 4 of 9
Document Set ID: 22521935
Version: 5, Version Date: 27/07/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Minor Change - 132002 220460 5 [As Publised].pdfRelated documentApplication case desk ↗
About this file
- File size
- 168 KB (small file)
- File type
No other editions are linked here.