Decision Notice - Minor Change - 132002 220460 5 [As Publised] · 132002.220460.5

of 9

Text shows just the words. Original shows the document exactly as it was published.

               26.    Any earthworks required on site shall be carried out in accordance with Section 3.8 of
                      Council's "Engineering Design Standards" manual and so as not to cause the ponding of
                      water on any adjoining lands or the blockage of, or interference with, any natural
                      watercourses.
                      Retaining Walls
               27.    A Registered Professional Engineer Queensland shall design any retaining walls greater
                      than one (1) metre in height and submit detailed plans for Council approval prior to obtaining
                      a Development Permit for Operational Works.
                      Retaining wall designs shall also incorporate a 1 metre high fence or similar if there is a risk
                      of people falling from the high side of the wall.
                      Frontage Works
               28.    Footpath improvements such as topsoiling, grassing, and tree planting will be required to the
                      street frontage in accordance with Planning Scheme Policy PSP1 Landscaping Guidelines.
                      Grass shall be couch, free of weeds.
               29.    A new 2 metre wide concrete path shall be constructed along the frontage of the site where
                      there is not already a concrete path or where the existing path is damaged.
               30.    The new path shall be designed and constructed to levels that minimise the risk of
                      pedestrians from tripping or slipping and the path shall join neatly and smoothly with the
                      existing paths. Care shall be taken to protect any significant vegetation or any underground
                      services.
               31.    All redundant vehicular crossings to the site shall be removed and replaced by kerb &
                      channel and footpath paving in accordance with Council’s Standard specifications prior to
                      commencement of the use permitted by this permit.
               32.    A Development Permit for Operational Works shall be obtained prior to the commencement
                      of any frontage works. Footpath and property alignment levels may be obtained from
                      Council’s Works Directorate upon request.
                      Stormwater Drainage
               33.    Roof and surface water is to be collected on site and is to be discharged through at least two
                      (2) separate underground drain lines into Bryan Street via Council’s street drainage system.
                      The maximum discharge allowable to Council’s kerb & channel at any one location is 25
                      litres/second.
                      In this regard, a Development Permit for Building Works shall not be granted until a
                      Development Permit for Operational Works has been issued.
                      Headworks
               34.    Contributions shall be paid to Council in accordance with Planning Scheme Policies PSP28
                      and PSP30 on Water Supply Headworks Contributions and Sewerage Headworks
                      Contributions respectively and at the rates applicable at the time of payment. An estimate
                      only of the contribution rates as of September 2002 under the current policies is as follows:

                        Water Supply     $ 3,570

                        Sewerage         $ 2,696

                        TOTAL            $ 6,266

                      All headworks contributions must be paid prior to the issue of a Development Permit for
                      Operational Works.
                      Alternatively a trading bank guarantee shall be submitted to Council plus 20%. Should the
                      headworks contributions not be paid at the due time, Council shall call upon the trading bank
                      guarantee in full.


                                                                                                        Page 4 of 9
Document Set ID: 22521935
Version: 5, Version Date: 27/07/2023

Used in these records

About this file

File size
168 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - Minor Change - 132002 220460 5 [As Publised].pdf · 168 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.