                      43.3. from 7pm to 10pm on any day if it makes noise or causes noise to be made of more
                            than 3 dB(A) above the background noise level.
               44.    Swimming/spa pool fencing, gates and wall openings within these areas to comply with
                      Australian Standard 1926 for pool safety. Display resuscitation chart at each pool, which are
                      free from Council’s Environmental Health Section.
               Building
               45.    There is to be no uncontrolled discharge of water onto the slope.
               46.    Stripping of vegetation for construction purposes should be minimised. If vegetation is
                      destroyed it should be reinstated immediately after construction is completed.
               47.    Additional load due to fill, construction equipment or stockpiled materials should not be
                      located on the dune slope. Filling in the open space area is to be avoided.
               48.    The use of vibratory equipment of any kind is not permitted to be used, including vibrating
                      rollers, the use of vibrating installation techniques for sheet piling and other construction
                      vibrations caused by excavating, earthmoving or demolition machinery or other similar
                      construction techniques.
               49.    A condition survey is to be carried out of adjoining buildings, structures and services prior to
                      any construction works taking place on site. If distress already exists, a photographic survey
                      shall be undertaken, the distress measured and a plan to monitor changes to distress shall
                      be implemented. A copy of this report is to be submitted to Council within 5 business days of
                      survey and prior to construction work proceeding.
               50.    Copies of all inspection reports by engineers are to be submitted to Council within 5 business
                      days of the inspection taking place.
               51.    The geotechnical engineer will be required to be on site for the whole of the time during the
                      basement excavation. No work of any such kind relating to the excavation of the basement
                      shall be carried out if he is not on the site supervising and directing this work. The consulting
                      geotechnical engineer shall carry out regular site inspections (and testing as required). Site
                      inspections shall be carried out prior to and during critical stages of construction (eg.
                      commencement of excavation, installation of piles, excavation near sensitive structures).
                      Such works shall only be carried out during dry weather conditions and if there is a risk of
                      sand movement occurring, all work shall be suspended until such steps, approved by the
                      geotechnical engineer have been taken to ensure that no further slippage will result.
               52.    The builder, landscaper and all workers associated with the construction of the works on this
                      site shall at all times comply with the directions of the consulting geotechnical engineer.
               53.    The applicant shall pay Council’s reasonable costs in relation to any geotechnical advice
                      sought by it in relation to this development provided that a quotation of the likely costs to be
                      incurred be obtained from the Council’s consultants Messrs Coffey Geosciences Pty Ltd and
                      that the amount of such costs be agreed to by the applicant before the advice is obtained.
               54.    Link wall movement shall be monitored throughout construction by an engineer and if
                      movement occurs construction is to be stopped immediately and appropriate action is to be
                      taken to arrest the movement. Further work shall only take place after a re-assessment of
                      the conditions on site by the engineer.
               55.    The client is to engage the services of a suitably qualified engineer to oversee the piling
                      works and copies of all inspection reports are to be submitted to Council within 5 business
                      days of the inspection taking place.
               Additional Condition:

               56.    Water saving devices shall be included for all dwelling units with a maximum 9L per minute
                      restrictor on all showers.
               57.    The 3rd storey façade to the front boundary shall be setback a minimum of 8.5m.



                                                                                                         Page 6 of 9
Document Set ID: 22521935
Version: 5, Version Date: 27/07/2023

Used in these records

About this file

File size
168 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - Minor Change - 132002 220460 5 [As Publised].pdf · 168 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.