Council archive · source document
IDAS form 1 · OPW12/0427
Attached to the e-mail Development Application IDAS Forms 1 & 6 - OPW12/0427.
16. List betow att of the forms and supporting information that accompany this application (inctude atl IDAS forms,
checklists, mandatory supporting information etc. that will be submitted as part of this application. Note: this question
does not appty for applications made on-line using Smart eDA)
Description of attachment or title of attachment Method of lodgement to
assessment manager
r7. Applicant's declaration
E tU making this application, I declare that alt information in this application is true and correct (note: it is untawful to
provide false or misleading information).
Notes for completing this form
Question 8:
. Section 253 of the Sustainable PlanningAct2oogselsoutwhen the consentof the ownerof the land is required foran
application.sectionz6o(rXe) of theSustainablePtanningActzoogprovidesthatiftheowner'sconsentisrequired
under section 263, then an application must contain, or be accompanied by, the written consent of the owner, or
include a dectaration by the appticant that the owner has given written consent to the making of the application.
o Owner's consent is not required for a mobile and temporary ERA.
Question 9:
. Section 264 of the Sustainable Planning Act zoog provides that if a development involves a state resource, a
regulation may require the application to be supported by certain evidence prescribed under the regutation. Schedule
14 of the Sustainable planning Regulation zoog prescribes the state resources for which evidence is required to
be
given, and the evidence required, to support the application.
Question r3:
. The Buitding and Construction lndustry (Portable Long Service Leave) Act r99r prescribes when the portable long
service leave levy is payabte.
. The portabte long service leave levy amount and other prescribed percentages and rates for calcutating the levy are
prescribed in the Building and Construction lndustry (Portable Long Service Leave) Regulation zooz.
Question r4:
. The portable long service leave levy need not be paid when the application is made, but the Buitding and Construction
lndustry (Portabte Long Service Leave) Act 1991 requires the levy to be paid before a development permit is issued.
. Building and Construction lndustry Notification and Payment Forms are available from any Queensland post office or
agency, on request from Qleave, or can be completed on the Qleave website at www.qleave.qld.gov.au. For further
information contact Qleave on r8oo 8o3 48r or www.qleave.qld.gov.au.
*lllAS forn t
Version i.o t8 !)ecenbet 2aog
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
IDAS form 1.pdfRelated documentApplication case desk ↗
About this file
- File size
- 7.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.