07/1413 - Response to Information Request [As Published] · 132007.1413
MURRAY & ASSOCIATES (QLD.) PTY. LTD. MURRAY GONSUDTINGISURVEVORSTSATOWNIRFANNERS) ABN 81 075 543 154 ACN 075 543 154 Directors Associates SURVEYORS 6.1. Andrews LS. M.S. (Aust.) C.R. Andrews L.S., 8. Appl. Sc. (Math), B. Surv. LY, B.W. Bell BRTP, M.P.1.A, CPP A.J. Campbell L.S., B. Surv., M.LS. (Aust.), Grad. Dip. Surv. Prac. Established 1946 J.R. Campbell L.S., B. Surv., (UQ) M.LS. (Aust.) F.M. Murray L.S., M.LS. (Aust.) LK. Smith L.S., B. Appl. Sc. (Surv.}, M.LS. (Aust.), Grad. Dip. Surv. Prac. www.mursurv.com Address Correspondence to: NAMBOUR 27" march 2008 The Chief Executive Officer Noosa Shire Council PO Box 141 TEWANTIN QLD 4565 Attention: Denis Wallace Dear Sir, RESPONSE TO THE INFORMATION REQUEST RE: APPLICATION 07/1413 FOR A DEVELOPMENT PERMIT FOR VISITOR ACCOMMODATION TYPE 3 — RURAL SITUATED AT 430 BLACK MOUNTAIN ROAD BLACK MOUNTAIN DESCRIBED AS LOT 89 ON SP158854 We refer to the above application and provide the following information in response to Council’s Information Request dated 5" September 2007. 1.0 ADDITIONAL DOCUMENTATION SUPPLIED In accordance with the relevant items of Council’s Information Request, the following supporting documentation has been provided to accompany this Response to the Information Request: e Dimensioned floor and elevation plans prepared by Statewide Transportables. e Bushfire Management Plan prepared by BushFireSafe, dated November 2007. e Amended Proposal Plan 40487/A prepared by Murray & Associates (Qld) Pty Ltd dated 20" December 2007. NAMBOUR EMERALD CABOOLTURE GYMPIE ROMA 15-17 Currie St. Unit 1/17 Opal St. 4/75 King St. 24 Reef St. 22 Lewis St. Nambour 4560 Emerald 4720 Caboolture 4510 Gympie 4570 Roma 4455 P.O. Box 246 PO. Box 665 P.O. Box 377 P.O. Box 57 P.O. Box 1244 Ph: (07) 5441 2188 Ph: (07) 4987 5363 Ph: (07) 5495 1478 Ph: (07) 5482 1484 Ph: (07) 4622 1666 Fax: (07) 5441 2601 Fax: (07) 4982 2808 Fax: (07) 5495 1729 Fax: (07) 5482 8296 Fax: (07) 4622 8298
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 35 pages
Page 2
MURRAY & ASSOCIATES (QLD.) PTY. LTD. AN ‘CONSULTINGISURVEY.ORSISITOWNIRUANNERS] MURRAY Loe \ ABN 81 075 543 154 ACN 075 543 154 SURVEYORS LAND & ENGINEERING SURVEYORS, PLANNERS —— Established 1946 www.mursurv.com 2.0 ADDITIONAL INFORMATION SUPPLIED 2.1 Matters of Interest to the Assessment Manager The Noosa Shire Council, as assessment manager for the application, raises the following matters of concern and request the following information — ames ee ee errr reagan emanaami am '2.1.1 Land Use” 1. Fully dimensioned floor plans and elevations of the 3 proposed cabins. In response to Item 1 of Council's Information Request, attached are dimensioned floor plans and elevations by Statewide Transportables (see Appendix 1). 2. itis noted that the Site and Soil Evaluation prepared by EcoCycle Pty Ltd and submitted with the application indicates that 1 x 3 bedroom and 2 x 2 bedroom dwellings are proposed. Please be advised that this scale exceeds the provisions of Probably Solution $27.1 of the Visitor Accommodation Code and the inclusion of a 3 bedroom dwelling is unlikely to be supported. In response to Item 2 of Council’s Information Request, please find attached in Appendix 2 an amended effluent disposal report prepared by Domestic Wastewater Design. This report addresses the capacity provisions for 3 x 2 bedroom cabins and 1 x 3 bedroom dwelling house. 3. Details of any vehicle accommodation proposed to be provided. In response to Item 3 of Council's Information Request, details of vehicle accommodation are noted on the floor plans (see Appendix 1). 4. An assessment of the proposal’s compliance with Probable Solution $28.1 of the Visitor Accommodation Code in regards to setbacks to adjacent uses. Probable Solution $28.1 states: $28.1 Rural accommodation buildings are— a) situated no less than 50m from Agricultural Uses on an adjoining property; and b) situated no less than 40m from the property boundary of any property over 4ha in area located in the Rural Zone; and c) situated no less than 6m from the property boundary of land in the Rural Settlement Zone. The proposal intends to locate Cabin 1 ten metres away from the boundary of Lot 96 on SP103520. Justification for this setback is as follows:
Page 3
MURRAY & ASSOCIATES (QLD.) PTY. LTD. AN CXOINEIIMIDNS SULA OL ©) KOWUIN FLANNEL) MURRAY ky, \ ABN 81 075 543 154 ACN 075 543 154 SURVEYORS LAND & ENGINEERING SURVEYORS, PLANNERS ca Established 1946 www.mursurv.com e There are no Agricultural Uses on adjoining properties. e Lot 96 on SP103520 is 2.001ha in area and therefore is under the 4ha mentioned in $28.1 e Due to the topography of the subject site and the property to the south, Cabin 1 will not visible from the adjoining property. 5. The site is identified as containing Medium Bushfire Hazard areas under The Noosa Plan and is assessable against the provisions of the Natural Hazards Overlay Code. Please provide a site specific assessment of the bushfire risk prepared by a suitably qualified person in accordance with State Planning Policy 1/03 Guideline: Mitigating the Adverse Impacts of Flood, Bushfire and Landslide and, if necessary, a Bushfire management plan (BMP) for the site. Where the BMP recommends alterations to the design, please submit amended proposal drawings incorporating those recommendations. In response to Item 5 of Council's Information Request, a Bushfire Management Plan by BushFireSafe is attached (see Appendix 3). All recommendations made in the report will be adhered to. 2.1.2 Land Development 6. Provide confirmation that the site access route provided on the property complies with the sight line provisions of AS2890.1:2004, specifically section 3.2.4. In response to Item 6 of Council's Information Request, the speed limit on Black Mountain Road in front of the subject property is 80km/h. However the speed environment is 60-70km/h, given the windy nature of Black Mountain Road. Thus, the sight distances identified on the amended Development Plan are sufficient for safe approach sight distances as stipulated under AUSTROADS for this particular speed environment. 7. Provide details of any proposed roadworks associated with the proposal including the access driveway to Cabin 2. In response to Item 7 of Council's Information Request, the proposal plan has been amended to include the access driveway to Cabins 1 and 2 (see Appendix 4). 8. Advise of the purpose and the current use of Easement A RP896023 exists on Lot 96 SP130520 south of the development site and if it has any impact on the proposal. in response to Item 8 of Council’s Information Request, Easement A RP896023 on Lot 96 on SP103520 is an electricity easement, which partially benefits Lot 89.
Page 4
MURRAY & ASSOCIATES (QLD.) PTY. LTD. AX ‘GONSULTINGISURVEVORSTSTTOWNIRUANNERS| MURRAY \ ABN 81 075 543 154 ACN 075 543 154 Li SURVEYORS LAND & ENGINEERING SURVEYORS, PLANNERS ——! Established 1946 www.mursurv.com 9. Advise if an aboveground or underground electricity power supply be provided to the proposed cabins. In response to Item 9 of Council's Information Request, aboveground electricity power supply will be provided to the proposed cabins. 3.0 SUMMARY Pursuant to Section 3.3.8 of the Integrated Planning Act 1997, we hereby provide all of the information requested, and formally request the Assessment Manager proceed in assessing the application in view of the additional information provided. We trust the information will assist Council in issuing a successful Development Permit in due course. Please do not hesitate in contacting Blake Bell (07) 5441 2188 for clarification on any matter detailed within this Response to the Information Request. Please send out a list of adjoining owners details so that we may proceed with the public notification of the application. Yours faithfully, Cpt lake Bell BRTP, M.-P.I.A., CPP Senior Town Planner MURRAY & ASSOCIATES (QLD) PTY LTD
Page 5
(QLD.) PTY. LTD. CONSULTINGISURVEY.ORSISATOWNIRUANNERS] wi MURRAY & ASSOCIATES AX MURRAY \ ABN 81 075 543 154 ACN 075 543 154 SURVEYORS LAND & ENGINEERING SURVEYORS, PLANNERS Established 1946 Wwww.mursurv.com
Page 6
aan sO
_ STATEWIDE TRANSPORTABLES 102 VIKING DRIVE WACOL 47 PHONE: 3271 ‘422 FAR
oa wea
l
fe
he
{
\
wee ben
i
fe
| aR oee
Dentarg
ORB
{
DESCRIPTION
NO
ITEM.
N
ol;
TTEM
-|No|
ITEM
TNol
N
Oo
' Twin 36w
Fiuore fight
"| XX Twin 108 GPO
AG
1 Rec. Cycle
AIC Unit
95 Some
Single 36w 4
Fluoro light
X Single 10 GPO
=
Electric = -
Hot Water
Unit
R- Henin 6.
O Batten Halder
Wali Mounted
Switchboard
bea Point of Entry
LS Light Switeh-
___ Exhaust Fan
Seourity Light _
Pan &
>
Page 7
|
_ STATEWIDE TRANSPORTABLES 102 VIKING DRIVE WACOL 4077 PHONE: 3271 4422 FAX: 3271 5043
Ty
i
{
i
t
}
4
|
wh
:
i
eee ener eer
|
—.
:
1
: t
eee ee pee fete tts
4
'
spo
i
i | f ¢
oe ne pee cere tah
secmbe nee pepe somensten sgruenaurcansaccons hee sum ttanee aaa peste sana
i ° '
fe neem Poe ten nfseenad
j Ure seenbeas aevint faears Roads ened
sae cement 4 i
| ‘
vhs cafe enepennmedermnte eaten
4 1
sperm
: ‘
wr anes nihnener etael vga
fe mtn i minarnnin ng tee
“DESCRIPTION
Page 8
Page 9
(QLD.) PTY. LTD. ‘CONSULTINGISURVEVORSISATOWNIRIANNERS) Jy MURRAY & ASSOCIATES Aw MURRAY ABN 81 075 543 154 ACN 075 543 154 SURVEYORS LAND & ENGINEERING SURVEYORS, PLANNERS ———_, Established 1946 www.mursurv.com AMENDED EFFLUENT DISPOSAL REPORT
Page 10
25 MAR 2008 Sunshine Coast Office PO Box 6218 Mooloolah Valley Q4553 abn: 78 105 179 404 Ph: (07) 54 947368 Fx: (07) 54 947620 Lance Picton Mob: 0407 887 321 QBSA: 1051092 Domestic Wastewater Design AMENDMENT TO EXISTING APPLICATION NEW DWELLING PROPOSED CABINS SITE & SOIL EVALUATION = Lot 89 SP158854:PAR Tuchekoi 430 Black Mountain Road, Cooroy Date: 5th March 2008 Reference No: Lot 89 / Henning V7
Page 11
1.0 Introduction: Domestic Wastewater Design in accordance with AS/NZS 1547-2000 ( Domestic Wastewater Management ) and the Code of Practice for On-Site Sewerage Facilities (DNR), was commissioned to undertake a Site and Soil Evaluation in the Noosa Shire at 430 Black Mountain Road, Cooroy. The results form the basis of our recommendations for on site wastewater disposal. NOTE: This evaluation was undertaken at the owners request after considerable discussion regarding environmental issues of this site and preferred design of the Land Application Area. Our original site investigation and field work was performed on Friday 15th June 2007 after a period of dry weather. The investigation was undertaken to determine the soil profile and Long Term Acceptance Rate (LTAR) of the site in order to accommodate a proposed new 4 bedroom dwelling plus 3 x 2 bedroom holiday cottages. There is an existing 3 bedroom dwelling located on this property which is to be demolished and the new 4 bedroom dwelling built in the same location. The septic system currently servicing the existing dwelling is to be de- commissioned. 2.0 Site Description: The site is an acreage allotment the area is 28.0Sha. The proposed site for the Land Application Area are moderately sloping Area # 1, 1% South. Area # 2, 2% South The proposed Land Application Area site # 1 and Land Application Area # 2 both have good exposure to sun and wind. Erosion, mass movement or land slip were not observed on this site. Rock outcrops are not evident on this site. Vegetation on Proposed Land Application Area # 1 consists of a fenced area with existing fruit trees. Vegetation on Proposed Land Application Area # 2 consists of 100% grass covered lawns. There are 2 watercourses located on this site, ASNZS 1547:2000 setbacks are obtainable. There are no creeks within the required set backs of ASNZS 1547:2000. There are three dams located on this site, setbacks for Advanced Secondary under ASNZS 1547:2000 is obtainable. No Bores were encountered during our evaluation. Ground water was not encountered on this site during our investigation. There is some evidence of fill in the proposed Land Application Area. Flooding wil! not occur on this site. Rain water may transverse this site from adjoining properties during heavy rains. Concentrated run-off from this property may transverse adjoining properties during heavy rains. 3.0 Soil Investigation: 3,1 METHOD: Two bore holes were excavated using a hand auger to a depth of 900mm within the proposed Land Application Area #1. One bore hole was excavated using a hand auger to a depth of 900mm within the proposed Land Application Area #2, The soils were visual one textually classified in accordance with DNR and AS/NZS 1547:2000. The soils were predominately grey/dark grey in colour. Moderately structured with the following texture assessment from table 4.1D1 AS/NZS 1547:2000. Smooth plastic ball that can be rolled into a rod; slight resistance to shearing between thumb and forefinger; forms a ribbon 50-75 mm long. Category 5S. 2/7
Page 12
Soil Classification | Borehole Nos 1&2&3 Soil Category 3 Indicative Drainage _ ; Poorly Drained Structure Moderately | Texture Light Clays Indicative Permeability P (m/d) as Ksat* 0.06 - 0.12 Recommended DIR ; 20 (AS/NZS 1547 / 2000) 4.0 Treatment Facility: The on site treatment facility is to be an “Advanced Secondary” Aerated Wastewater Treatment System with a daily flow capacity of no less than 2000It/d, plus a 6000It baffled septic tank upstream to act as flow balancing and to increase retention time and equivalent person capacity. Pump wells are to be installed and fitted with “Feka Pumps” as shown on the site plan. All inffluent to be directed to the septic tank. A minimum 25m head pump will need to be fitted to the treatment system. For the purpose of our calculations we have adopted an EP of 3 for each of the 2 bedroom cabins. (9EP), and have assumed 100% occupancy. For the 4 bedroom dwelling we have adopted an EP of 6. (Total 15 EP) Standard water reduction fixtures to be installed in all cabins and proposed dwelling as per ASNZS 1547:2000, this will reduce the expected flow rate to 1725lt/d. 5.0 Land Application Areas: - Two areas proposed. Area #1; The preferred method of dispersal in Land Application Area # 1 is Covered Surface Drip Irrigation to existing fruit tree’s. The installer is to determine how many 4mm drip lines are to be installed to each tree in accordance with flow rate requirements of the irrigation pump and the sterilization unit. This area bordered by a fence. 25mm lo-pol irrigation pipe to be setup in a “rack” to ensure even pressure distribution to all drip lines. Irrigation pipes should always be covered by mulch or soil. A flush out valve to be installed in a mini valve at the lowest point in the irrigation area to enable flushing of lines. Non return valve to be installed to prevent flow back in the delivery line as required. A minimum of 100mm of mulch is to be placed a the base of each fruit tree approximately 1.5m in diameter. In accordance with Noosa Shire stipulated guidelines, treated effluent must not at any time extend beyond the approved designated area. Two warning signs to be installed in this area. Area #2: Two turf valves to be installed in Land Application Area # 2 14m apart as per the drawings. Two 7m hoses each fitted with one heavy droplet sprinkler to be installed and moved when necessary to ensure even distribution over the entire area. In accordance with Noosa Shire stipulated guidelines treated effluent must not at any time extend beyond the approved designated area. Non return valve to be installed to prevent flow back in the delivery line as required. Two warning signs to be installed in this area. Note: Two isolation valves to be installed in the delivery lines to alternate water flow to Land Application Area # | and Land Application Area # 2. Supply line to be buried 200mm and comply with AS/NZS 1547/2000. 3/7
Page 13
Design Calculation The serviceable life of the Land Application Areas will be compromised if the design flow is exceeded. The Wastewater Treatment System will be compromised if the design flow rate is exceeded. For our calculations we have assessed the design flow as follows: Design Calculation DIR (mm/week) (secondary quality effluent) 20 Hydraulic load (It/day/person) Tank Water / 10 Bedrooms. 115 Design Flow Q (It/day) EP: 15 At 100% occupancy for holiday cottages 1725 Design sizing calculation Ai =(Qx7)/DIR = (1725 x 7)/20 Disposal area A (square meters) 605m2 Nominated Configuration (meters) Determined by Installer Treatment Plant Minimum Size Requirement 15 EP Recommended Separations Distances - Surface Irrigation pecondary nenanced Secondary Dwellings & recreation areas 15m 10m Water edge of swimming pools 6m 6m Property boundaries, paths & walkways am uphill hill am AN hil Top of bank of permanent water course, creek, lake, waterway etc. 30m 10m Bore or Dam for domestic or stock use 30m 10m Vertical depth of seasonal water table 0.6m 0.3m In ground potable water tank. Note some authorities require 15m 6m 6m Sub-Surface Irrigation same as above except for; Dwelling & recreation areas 4m 4m NOTE: The local government authority may upon considering the public health and environmental risks reduce or increase the distances in the above table. Regards, Lance Picton jp. EcoCycle Pty. Ltd. 4/7
Page 14
SITE: 430 Black Mountain Road, Cooroy AREA 25.08ha See Insert 3/7
Page 15
SITE:
430 Black Mountain Road, Cooroy
Insert only not boundary of property
;
: 1
: '
' 1
' 1
' 1
‘ 1
' 1
' 1
‘ t
'
! 1
! 1
! '
! t
! \
to '
ut ' . t
I Proposed Irrigation Area . t
| \ #1 to fruit tree’s 300m2 Pump Well with
4 t Covered surface drippers a Feka Pump ‘
! t ' no spray OQ '
' I '
' \ ae Non Return Valve
\ Reserve area \ r 4 a Proposed Cabin #2 1
4 ' | * '
it 1 '
m4 ! '
ot ' '
i) ' '
ot ' '
ii ' '
4 ' '
| ' '
4 { ott :
| 1 i '
— BHA |
‘ ' !
‘
‘ Model 1ONR > Non Return Valve ! BH #2 1
‘ .
Qed a '
1 :
8000 Litre *s weegugnetane gms | 1
' Septic Tank Ane Pececoenngseces Delivery Line < 10m t @ = |
with bafet Qe eT 1 10m * é
‘ Isolation valves ‘ — =
iternated irrigation areas see '
' to alternated irrigation Existing fenced area / '
: Fence with fruit trees '
‘ oo heh,
‘ TT Existing garden.
‘ . \
! Proposed Cabin #1. Proposed Irrigation Area; 1
' #2 300m2 Turf valves, t
' t
! '
| '
;
: Proposed new 4 bedroom . \
dwelling = | “ ~ '
! _—e ., , '
' Note: ‘. ‘
\ ‘ \. '
' All wastewater to be directed to the 6000!t septic tank. y Small Dam :
' Minimum 32mm delivery lines from pump wells to septic tank. . my '
' Exact route of delivery lines to be determined on site by installer, . ;
: Exact position of Treatment Plant to be determined on site by installer. Pump Well with vent —— :
' Feka Pump cer '
: me 3
' oN i
‘ eT Ny t
‘ \ \ ‘
5 . \ \ :
, Proposed Cabin #3 \ UL? ‘
\ . 1
:
Black Mountain Road
6/7
Page 16
BOREHOLE PROFILES SITE ADDRESS 430 Black Mountain Road, Cooroy BORE HOLE #1 BORE HOLE #2 DEPTH] SOIL DESCRIPTION| Structure | CAT DEPTH] SOIL DESCRIPTION | Structure | CAT 0 0 100 Clay Loam Moderately | 4 100 Clay Loam Moderately | 4 200 200 300 300 400 400 500 Light Clay Moderately | 5 500 Light Clay Moderately | 5 600 600 700 700 oe Light Clay Moderately | 5 soo Light Clay Moderately | 5 1000 1000 1100 1100 1200 | Hole Terminated 1200 Hole Terminated 1300 1300 1400 1400 1500 1500 BORE HOLE #3 DEPTH| SOIL DESCRIPTION Structure | CAT 0 100 Sandy Clay Loam | Moderately| 4 200 300 400 500 Clay Loam Moderately | 4 600 700 500 Light Clay Moderately | $ 1000 1100 1200 Hole Terminated 1300 1400 1500 WT
Page 17
(QLD.) PTY. LTD. GONSULTINGISURVEVORSI&ATOWNIRUANNERS} J MURRAY & ASSOCIATES AX MURRAY ABN 81 075 543 154 ACN 075 543 154 SURVEYORS LAND & ENGINEERING SURVEYORS, PLANNERS Established 1946 www.mursurv.com BUSHFIRE MANAGEMENT PLAN
Page 18
BUSHFIRE HAZARD ASSESSMENT REPORT FOR PROPOSED TOURIST FACILITY AT Lot 89/430 BLACK MOUNTAIN ROAD BLACK MOUNTAIN IN SP158854 PREPARED BY: BUSHFIRESAFE (AUST)PTY LTD FRIDAY, 30 NOVEMBER 2007
Page 19
TABLE OF CONTENTS 1.0 Introduction 1.1 Background 1.2 Description of Property 2.0 Site Assessment 2.1 Vegetation Assessment 2.2 Slope Assessment 3.0 Field Verification 3.1 Gold Coast City Bushfire Management Strategies Loading Factors 3.2 State Planning Policy Guidelines SPP1/03 Loading Factors 4.0 Conclusion 5.0 Scope of Plan 5.1 Area 5.1.1 Purpose 5.1.2 Period of Operation 5.1.3 Aim & Objectives of the Plan 5.1.4 Aim , 5.1.5 Objectives 5.1.6 Bushfire Risk Management Strategies 5.2 Implementation 6.0 Bushfire Performance Criteria 7.0 Assessment Methodology 8.0 Building Site Assessment 8.1 Asset Protection Zones (APZ) 8.2 Bushfire Attack Category 8.3 Adequacy of Water Supply for Fire Fighting Purposes 8.4 Adequacy of Access & Egress in a Bushfire Emergency 8.5 Bushfire Construction Standard 9.0 Conclusion 10.0 Tree Selection for Bushfire Prone Areas 11.0 References Appendix 1: Vegetation Communities/Site Plan , Prepared by: BushfireSafe Services 67) 38209992 Bushfire Hazard Report: Proposed Tourist Facility, Lot 89. Black Mountain Road, Black Mountain in SP 158854. OO COCTNNAMAMAMnAAanb PPP HWW WWW
Page 20
BUSHFIRESAFE (aust) Pry LTD BUSHFIRE RISK MANAGEMENT & ENVIRONMENTAL CONSULTANTS= [Pd 3 Hereford Drive Kureelpa, QLD 4560 ABN89 114025820 AUSTRALIA PH/Fax: 07 54764265 Mobile: 0408 538 529 Sorborate Sitver 20 McLachlan Street Maclean NSW 2463 Ph: 02 66451088 Fax: 02 66451099 148/333 Coulburn Avenue Victoria Point QLD 4165 Ph/Fax: 07 38209992 Mobile: 0432515569 1.0 INTRODUCTION 1.1. BACKGROUND Bushfiresafe (Aust) Pty Ltd was engaged by Murray & Associates (QLD) Pty Ltd on behalf of their client to complete a Bushfire hazard assessment for the proposed Tourist Facility at Lot 89 Black Mountain Road, Black Mountain , in SP158854. The hazard assessment bas been completed to satisfy the Bushfire Hazard Planning in Noosa Shire and the State Planning Policy Guidelines 1/03. The assessment has involved the following: ¢ Ground verifying vegetation communities and determining their bushfire attack categories. ¢ Ground verifying the terrain in relation to the assessed bushfire vegetation. ¢ Ground verifying the aspect of topography in relation to the assessed bushfire hazard vegetation. e Analyse collated field assessment data with the Bushfire Hazard Planning in Noosa Shire and the State Planning Policy Guidelines ‘1/03. 1.2 DESCRIPTION OF PROPERTY The subject property comprises of a large rural lot which has an area of 28.05ha; the property has been utilised for dairy production in years past, with the majority of the lower portion of the property consisting of managed improved pasture with scattered clumps of trees throughout the grassland. The majority of the upper slopes within the property consisted of forested vegetation with grassland patches throughout. The subject property currently supports a residential dwelling and several farm sheds within the eastern portion of the property. Rural properties adjoin the northern and southern boundaries; the eastern property boundary adjoins Black Mountain Road which is followed by rural properties. 1.3. PROPOSAL The proposal is to upgrade an existing structure and construct an additional two cabins to be utilised for tourist accommodation. 2.0 SITE ASSESSMENT An assessment of the subject development property and adjacent properties up to 100m from the proposed development sites was undertaken on the 3rd November 2007, to determine the dominant bushfire vegetation groups, aspect and terrain, present on and adjacent to the subject property. 2.1 | VEGETATION ASSESSMENT The onsite field assessment identified an Open Forest vegetation occurring within the western portion of the property and within the adjoining lands to the south-west, north-west and west. Prepared by; BushfireSafe Services 07) 38209992 3 Bushfire Hazard Report: Proposed Tourist Facility, Lot 89. Black Mountain Road, Black Mountain in SP158854,
Page 21
‘The remaining vegetation within the subject property consists of managed grassland areas, which were not assessed as bushfire hazard vegetation when assessing bushfire attack categories in relation to the proposed development. 2.2 SLOPE ASSESSMENT A desktop assessment of the slope using a land based mapping program and an onsite assessment identified the slope in relation to the identified bushfire hazard vegetation; the vegetation occurs on an upslope of approximately 10%. 3.0 | FIELD VERIFICATION The collated information gathered through the field assessment was analysed with the data supplied in the Bushfire Hazard Planning in Noosa Shire and the State Planning Policy Guidelines 1/03 with loading factor ratings allotted for vegetation type, topography, aspect and fire frequency. 3.1 NOOSA BUSHFIRE HAZARD PLANNING POLICY ASSESSED LOADING FACTORS a) Topography Steep Hills (15 - 20%) Loading factor 3 b) Aspect North to North-West Loading factor 4 ce) Vegetation Eucalypt Forest not determined Loading factor 4 d) Fire Frequency | average as per Bushfire Hazard | Loading factor 2 Planning in Queensland) Total Loading Factor 13 A Total hazard score of 13 identifies the subject property as situated within a Bushfire —Prone Area 3.2 STATE PLANNING POLICY GUIDELINES ASSESSED LOADING FACTORS a) Topography Steep Hills (20 - 30%) Loading factor 4 b) Aspect North to North-West Loading factor 3.5 c) Vegetation Tall Eucalypt Forest Loading factor 10 Total Loading Factor 17.5 A Total hazard score of 17.5 identifies the subject property as having a High Bushfire Severity Rating 4.0 CONCLUSION: The collated data from the onsite field assessment analysed with the information outlined in the Bushfire Hazard Planning in Noosa Shire and the State Planning Policy Guidelines 1/03, identified the subject property as being within a High Bushfire Hazard area; therefore the proposed Tourist Facility will require the formulation of a Bushfire Risk Management Plan. Prepared by: BushfireSafe Services 07) 38209992 4 Bushfire Hazard Report: Proposed Tourist Facility, Lot 89. Black Mountain Road, Black Mountain in SP158854.
Page 22
BUSH FIRE RISK MANAGEMENT PLAN 5.0 SCOPE OF THE PLAN 5.1 AREA This plan covers the proposed Tourist Facility development for Lot 89, SP158854, Black Mountain Road, Black Mountain, within the Noosa Shire Council area. 5.1.1 PURPOSE The plan is a strategic document which; ° Identifies the level of bush fire risk for human habitation. . Identifies strategies which will be implemented to manage the bush fire risk identified. . Identifies persons responsible for implementing and maintaining the bush fire tisk management plan (BFRMP). 5.1.2 PERIOD OF OPERATION Once approved by the local authority this plan will have a period of operation of the life of the development. 5.1.3 AIM AND OBJECTIVES OF THE PLAN 5.1.4 AIM The aim of this plan is to provide for the mitigation of bush fires for; (a) The protection of life and property for the habitants, visitors and emergency personnel in bush fire situations. ~ (b) The protection of environmental factors within and adjacent to the development. 5.1.5 OBJECTIVES The objectives of this bush fire risk management plan is to; © Identify the area most at risk from bush fire attack. e Reduce the risk of bush fire damage to. life and property. ¢ Ensure that the developer/owner/occupier understands their bush fire management responsibilities. e Reduce the impact of bush fire on the development and develop sustainable Asset : Protection Zones. Prepared by: BushfireSafe Services 07) 38209992 5 Bushfire Hazard Report: Propased Tourist Facility, Lot 89. Black Mountain. Raad, Black Mountain in SP158854.
Page 23
5.1.6 BUSH FIRE RISK MANAGEMENT STRATEGIES This plan contains a number of strategies, which are directed at addressing the risk for the proposed Tourist Facility from bushfire emergencies. This is achieved through addressing and managing the fuel loads, separation distances from the assessed dominant bushfire vegetation and bushfire building standards. 5.2 IMPLEMENTATION Implementation of the strategies in this plan is the responsibility of the developer and shall be implemented as part of the development infrastructure. The ongoing maintenance of this plan will be the responsibility of the owner/manager of the Tourist Facility whom shall maintain all the bushfire risk management strategies implemented in this plan. The local authority or their delegated authority, for the life of the development will monitor this plan. Prepared by: BushfireSafe Services 07) 38209992 6 Bushfire Hazard Report: Proposed Tourist Facility, Lot 89. Black Mountain Road, Black Mountain in SP158854.
Page 24
6.0 BUSHFIRE PERFORMANCE CRITERIA: The table below identifies crucial performance criteria and acceptable solutions required to satisfy adequate bushfire risk management strategies; the performance criteria is in accordance with the State Planning Policy 1/03 and Industry Best Practice. PERFORMANCE CRITERIA ACCEPTABLE SOLUTIONS PC1 Development must not materially intensify the use of bushfire | With the implementation of the prone land, or must provide for the highest intensity of use in the parts of the site which are least bushfire prone and limits the intensity of use elsewhere. recommendations outlined within this report regarding, building construction conditions and obtainable fire breaks this performance criteria has been satisfied. Ppc2 Buildings must be sited or able to be sited: e Incleared areas where the environmental impacts of vegetation clearing are acceptable, and * On land which is least prone to bushfire risk having regard to aspect, elevation, slope and vegetation Incorporate adequate and effective sitting and design measures to minimise bushfire risk, With implementation of the recommendations outlined within this report regarding, the appropriate sitting of habitable dwellings will comply with acceptable solutions REFER SECTION 8.0 PCS Firebreaks must be provided: e Roadways situated around the outside of the development site, or e Fire breaking trails: >» Situated around or through individual lots as required, >» Situated between the development site and surrounding vegetated areas, > Having sufficient width to both serve as an effective fire break and allow continuous access for fire fighting vehicles, and Being in secure tenure and maintained. With implementation of the recommendations outlined within this report the development will comply with Performance Criteria 3 REFER SECTION 8.4 PC4 Development of premises must have a sufficient supply of water for fire fighting purposes, including: e¢ Connection to a reticulated water supply scheme if available, with conveniently located hydrants, or Where a reticulated supply is not available, the provision of a dam, lake, water tank or swimming pool having sufficient capacity for water pumping in times of bushfire. With implementation of the recommendations outlined within this report the development will comply with Performance Criteria 4 REFER SECTION 8.3 Prepared by; BushfireSafe Services 07} 38209992 Bushfire Hazard Report: Proposed Tourist Facility, Lot 89. Black Mountain Road, Biack Mountain in SP158854.
Page 25
7.0 ASSESSMENT METHODOLOGY The data collected through the onsite field assessment identified the property as being within a Medium bushfire Hazard Area, therefore a Bushfire risk management assessment for the proposed tourist facility within the subject property was undertaken. The bushfire risk management assessment identifies the potential bushfire attack category in relation to the development site and recommended bushfire protection strategies for the development. _ The assessment has involved the following: e Ground verifying vegetation communities and determining their bushfire attack categories within 100 metres of the building sites. ¢ Ground verifying of terrain in relation to the assessed bushfire vegetation. e Identify the sitting of adequate water supplies for fire fighting purposes. ¢ Identification of adequacy of arrangements for access and egress from the development for the purposes of an emergency response. ¢ Identification of adequacy of onsite water for fire fighting purposes Identification of construction standards to be used for building elements in the development. Identification of adequacy of bushfire maintenance plans and fire emergency procedures for the development. * Preparation of a‘Bushfire Risk Management report for the proposed development. 8.0 BUILDING SITE ASSESSMENTS The building envelopes for the proposed tourist cabins have been designated within the managed grassland portion of the property (eastern portion); the designated building envelopes if required could be relocated to a different location within the lot boundaries as long as compliance with the recommended bushfire strategies are maintained. 8.1 ASSET PROTECTION ZONES (APZ) Based on the assessment of the vegetation communities and slopes present on and adjacent to the subject property, and in accordance with State planning Policy Guideline 1/03 Appendix 7 (Principles for Sitting Buildings in High and Medium Bushfire Hazard Areas), it is recommended that Asset Protection Zones (APZ) should be established as follows; The Tall Eucalypt Forest identified occurring within the western portion of the property and adjacent to the north/western and south/western and western boundaries are greater than 80 metres from the proposed development site and was considered an insignificant threat in regards to radiant heat and flame contact; however as the property has a large area the bushfire risk assessment recommends a minimum asset protection zone (fire break) of 45 metres be implemented and maintained on all elevations of the tourist facility to prevent any future encroachment of forest vegetation. Prepared by: BushfireSafe Services 07) 38209992 8 Bushfire Hazard Report: Proposed Tourisi Facility, Lot 89. Black Mountain Road, Black Mountain in SP158854,
Page 26
The Asset Protection Zone (APZ) must be established and maintained such that: e There is minimal fine fuel at ground level that could be set alight by a bushfire (e.g. long grass, tree branches etc). © Vegetation does not provide a path for the transfer of fire to the development. e Trees are a minimum of 5 metres away from any building, measured from the edge of the foliage to the roof line or any open balconies. e Bark chips and the like are not present within 2 metres of any building. e Trees present and /or planted have a minimum canopy separation of 2-5 metres. e Trees present are not species that retain dead material or deposit excessive amounts of ground fuel in a short time. 8.2 BUSHFIRE ATTACK CATEGORY An assessment of the bushfire attack categories applicable to the proposed building entitlements was carried out using the methodology detailed in Australian Standard AS3959 (Construction of Buildings in Bushfire Prone Areas). The bushfire risk management assessment undertaken in relation to the proposed building envelope concluded a Medium bushfire attack for the designated building envelope. The bushfire attack category was derived from; e A Tall Eucalypt Forest bushfire vegetation assessed as being the dominant bushfire vegetation in relation to the designated building envelope. ° The terrain in relation to the assessed dominant bushfire vegetation was identified as undulating (>5% to 10%). ° An achievable APZ of 45 meters from the identified bushfire vegetation. 8.3 ADEQUACY OF WATER SUPPLY FOR FIRE FIGHTING PURPOSE There is no reticulated water supply to the property; all water for fire fighting purposes will have to be retained within the proposed development. The subject property currently has two dams located in close vicinity to the development site; the dams have the capacity to hold 5,500,000 gallons of static water supply, an electric pump which can be remote started is installed to the larger dam and supplies irrigation water through the eastern portion of the property and throughout the development site. The bushfire assessment concluded the two existing dams would be accessible by fire appliances in a bushfire emergency and have adequate water supply to assist with fire suppression and emergency water supply. All delivery water lines shall be installed underground to a minimum depth of three bundred millimetres (300mm), with all points above ground using metal pipes or raisers with a minimum internal diameter of nineteen millimetres (19mm). 8.4 ADEQUACY OF ACCESS AND EGRESS IN A BUSHFIRE EMERGENCY The subject property is serviced by Black Mountain Road; the property access roads/driveways shall be constructed and maintained to the following standard; Prepared by; BushfireSafe Services 07) 38209992 9 Bushfire Hazard Report: Proposed Tourist Facility, Lot 89. Black Mountain Road, Black Mountain in SP158854.
Page 27
(a) Roads. should have a minimum all weather trafficable width of 4 metres with a metre on each side, maintained as a fuel free area; (b) Restrict the use of speed humps and chicanes to control traffic; (c) The capacity of road surfaces and bridges should be sufficient to carry fully loaded fire-fighting vehicles (approximately 27 tonnes or 9 tonnes per axle); . (d) Curves should have a minimum inner radius of 6m and be minimal in number to allow for rapid access and escape; (e) The minimum distance between inner and outer curves should be 6m; ® Maximum grades should not exceed 15° and preferably not more than 10° or gradient specified by road design standards, whichever is the lesser gradient; (g) There must be a minimum vertical clearance to a height of 6 metres above the road at all times; (h) Passing bays shall be constructed along the roads at interval of approximately 200 metres but not greater than 250 metres, passing bays shall be 20 metres in length by 3 metres wide, making a trafficable area of 7 metres at the passing bays. The vegetated areas are accessible from within the subject property; therefore the bushfire risk assessment concluded fire trails were not required for the proposed development. 8.5 BUSHFIRE CONSTRUCTION STANDARD The collated data collected through the onsite assessment identified the proposed building envelope as being within a Medium bushfire attack category, any future dwelling constructed within the designated building envelope would be susceptible to ember attack; therefore the bushfire risk assessment recommends a Level 1 construction standard in relation to Australian Standard AS3959 (Construction of Buildings in Bushfire Prone Areas). 9.0 CONCLUSION The bushfire risk assessment identified a Tall Eucalypt Forest vegetation occurring within and adjacent to the subject property as the dominant bushfire hazard vegetation in relation to the proposed development, The bushfire vegetation occurs on an undulating terrain greater than 10% for a distance greater than 100 metres. , The proposed development area has been designated within the eastern portion of the subject property approximately 60 metres from the eastern property boundary. The bushfire hazard assessment recommends the designated building envelope shall comply with a minimum 45 metre Asset Protection Zone on all aspects of the proposed tourist development. All habitable buildings constructed within the proposed development would be susceptible to ember attack from bushfire within the surrounding vegetation therefore it is recommended that all habitable buildings constructed within the proposed development site comply with a level 1 construction as outlined in Australian Prepared by: BushfireSafe Services 07) 38209992 10 Bushfire Hazard Report: Proposed Tourist Facility, Lot 89. Black Mountain Road, Black Mountain in SP158864.
Page 28
Standard AS3959 (Construction of Buildings in Bushfire Prone Areas). The property access driveway shall be constructed in such a manner to allow free movement for fire appliances and for asset protection; the road/driveway shall have a minimum 4 metre all weather trafficable surface. With the implementation of the recommendations outlined within this bushfire risk management plan the proposed Tourist Facility at Lot 89/430 Black Mountain Road, Black Mountain, in SP158854 complies with the recommendations outlined within State Planning Policy Guidelines 1/03 (Mitigating the adverse Impacts of Flood, Bushfire and Landslide). Prepared by; BushfireSafe Services 07) 38209992 11 Bushfire Hazard Report: Proposed Tourist Facility, Lot 89. Black Mountain Road, Black Mountain in SP 58864.
Page 29
10.0 TREE SELECTION FOR FIRE-PRONE AREAS Select plants that match the conditions of the environment (soils, rainfall, temperatures, frost and wind), but don't overlook fire as a factor. Some species may be invasive in different environments. (RFS 2002) FLAMMABILITY All plants will burn, but some are more tolerant of fire than others. Severe fires cause more damage. Low to moderate fires scorch or burn plants. High- intensity fires incinerate plants. Young plants are more susceptible to damage than mature plants. Features of plants that provide protection from fire include (check with local Council for an endemic species list): high salt content of leaves high moisture content of leaves low volatile oil content of leaves thick bark protecting conductive tissues and dormant buds seeds enclosed in woody capsules dense crown lowest branches out of reach of ground fires Plants that retain or accumulate dead leaves and twigs will burn, especially if this material is continuous from the ground to the crown. Trimmed cypress hedges, for example, are an extreme fire hazard. Volatile oils in leaves of eucalypts, callistermons and melaleucas burst into flames on heating and increase fire intensity. Thick bark will protect trees, but may be a fire hazard if it is loose, fibrous or stringy. These types of bark easily ignite and encourage fire to spread through the crown of “the trees. Wind can carry burning bark, especially loose, flaky or ribbon bark, away to start new fires - a process called "spotting". (RFS 2002) ABILITY TO REGENERATE Many plants can regrow or regenerate after a fire. Native plants have evolved with fire and most will regenerate well. They have survival mechanisms such as dormant buds, thick bark and thick, woody capsules to protect’ seeds, or they store seed in the soil. Introduced plants have few survival mechanisms, but burn less readily than most natives. Eucalypts can reshoot from dormant buds beneath their bark. Casaurinas and some acacias reshoot from roots. Some eucalypts, acacias, tea-trees, banksias, hakeas and calistemons regenerate from seed. Seed of many acacias is stored in the soil and germinates after fire. Larger acacias are more tolerant of fire than smaller ones. If crowns and trunks of native species such as eucalypts, acacias and casaurinas are killed by fire, the tree will often reshoot from the stump when felled. Introduced deciduous trees, such as poplars and willows, reshoot from roots, and oaks reshoot from stumps when the fire-killed crown and trunk is felled. Most pines will not recover if more than half their foliage is burnt, although Canary Island pine, Ponderosa pine, Aleppo pine, and Redwood are more fire-tolerant than this. (RFS 2002) Prepared by: BushfireSafe Services 07) 38209992 12 Bushfire Hazard Report: Proposed Tourist Facility, Lot 89. Black Mountain Road, Black: Mountain in SP158854.
Page 30
AFTER THE FIRE Ground cover and prunings from fodder trees may provide supplementary stockfeed when pastures are bumt. Saltbush, most casaurinas, several species of eucalypt and acacia, poplars and willows are all fodder trees. Fire-damaged shelterbelts will still protect stock from wind and sun, so retain them until new shelterbelts are established. Fire-tolerant plants may provide a valuable refuge and source of food after a fire for wildlife such as small marsupials, nectar-feeding birds, bees and other insects. ‘c - prefers cool climate, x - extensively naturalised: might be declared noxious weed in some areas. (RFS 2002) THE MORE FIRE RESISTANT NATIVE TREES AND SHRUBS INCLUDE: ( Acacia cyclops West Australian Coastal Wattle Acacia glandulicarpa Hairy Pod Wattle Acacia howittii Sticky Wattle Acacia iteaphylla Gawler Range Wattle Acacia melanoxylon | Blackwood Acacia pravissima Ovens Wattle Acacia prominens Golden Rain Wattle Acacia terminalis Cedar Wattle Acacia vestita Hairy Wattle Acmena smithii Lilly Pilly Agonis juniperina Juniper Myrtle Angophora costata Apple Jack Atriplex spp. Saltbush Brachychiton populneus Kurrajong ( Casuarina cristata Belah ” Casuarina cunninghamiana River She-Oak Eucalyptus maculata Spotted Gum Ficus macrophylla Moreton Bay Fig Hakea salicifolia Willow Hakea Hakea suaveolens Sweet Hakea Heterodendrum oleifolium Cattlebush Lagunaria patersonii Pyramid Tree Melaleuca lanceolata Moonah | Melia azedarach White Cedar Myoporum insulare Boobialla Pittosporum undulatum Sweet Pittosporum Tristania conferta Brush Box Prepared by: BushfireSafe Services 07) 38209992 13° Bushfire Hazard Report: Preposed Tourist Facility, Lot 89. Black Mountain Road, Black Mountain in SP158854.
Page 31
INTRODUCED PLANTS THAT ARE HARD TO BURN INCLUDE: Acer campestre Common Maple Acer negundo Box-Elder maple Acer platanoides c Norway Maple Acer pseudoplatanus c Sycmore Aesculus hippocastanum c Horse Chestnut Alnus jorullensis Evergreen Alder Calodendrum capense Cape Chesnut Castanea sativa c Sweet Chestnut Celtis occidentalis Hackberry Ceratonia siliqua Carob Cercis siliquastrum Judas Tree Coprosma repens Mirror Bush Cornus capitata c Evergreen Dogwood Corynocarpus leavigatus New Zealand Laurel Elaeagnus angustifolia Russian Olive Fagus sylvatica c Common Beech Fraxinus spp. x Ash Griselinia littoralis New Zealand Broadleaf Ilex aquifolium Holly Laurus nobilis Laurel Liridendron tulipifera c Tulip Tree Olea europaea x Olive Photinia glabra Red-leaf Photinia Photinia serrulata c Chinese Hawthorn Pittosporum eugenioides Tarata Platanus orientalis Plane Populus spp. Poplar Prunus laurocerasus . | Cherry Laurel Prunus lusitanica | Portugal Laurel Quercus canariensis Algerian Oak Quercus cerris c Turkey Oak Quercus ilex Holm Oak Quercus robur English Oak Salix babylonica Weeping Willow Schinus molle Pepper-Tree Sorbus aucuparia c Rowan Tamarix aphylla Athel Tilia vulgaris c Linden Ulmus spp. Elms Prepared by: BushfireSafe Services 07} 38209992 14 Bushfire Hazard Report: Proposed Tourist Facility, Lot 89. Black Mountain Road, Black Mountain in SP158854,
Page 32
GROUND COVER PLANTS THAT ARE HARD TO BURN INCLUDE: Ajuga reptans Atriplex spp. Carpobrotus spp. Coprosma ‘kirkii’ Delosperma ‘alba’ Drosanthemum floribundum Gazania spp. Hedera spp. Heliaxthemum spp. c Kennedia spp. Kochia spp. Lampranthus multiradiatus Myoporum parvifolium Portulacaria spp. Pelargonium spp. Rhadgodia spp. Rosmarinus officinalis prostatus Rosemary (prostrate form) Santolina spp. Verbena peruviana Vinca spp. Bugle Saltbush Pigface Gazanias Clinging types of ivy Sunroses Coral Peas Bluebushes Noonflower Creeping Myoporum Jade Plants Pelargoniums Saltbush Stonecrops Periwinkles Note: the above information was supplied as a guide to non fire prone vegetation species, local endemic species should be used in preference to non endemic species: local Councils may be able to assist with a list of appropriate species. Prepared by; BushfireSafe Services 67} 38209992 Bushfire Hazard Report: Proposed Tourist Facility, Lot 89. Black Mountain Road, Black Mountain in SP158854, 15
Page 33
11.0 References: Noosa Shire: Bushfire Hazard Planning in Noosa Shire Queensland Government/ Department of Local Government & Planning & Emergency Services: State Planning Policy SPP 1/03 Queensland Fire & Rescue Service: Bushfire Hazard Planning in Queensland NSW Rural Fire Service: Tree Selection for Fire Prone Areas (Fireguard Resource 3) Prepared by; BushfireSafe Services 07) 38209992 Bushfire Hazard Report: Proposed Tourist Facility, Lot 89. Black Mountain Road, Black Mountain in SP158854. 16
Page 34
L
£ Z a
LYS PPPS.
AL
Scale 1:1000 — Lengths are in ff 4
1 1 jt 1 4 ~
Lo L
~ 100°: TO A20 130 ye
20 30 40 680 60 7D BO.
RI Ty [» TE.
BushfireSafe pel Risk tHaRR Henning a p was prepored by
Services tourist cables Kieronstrate the identified
20 McLachlan Street {for Lot 89 SPI5Ess4 Vegetation and assest
Maclean NSW 2463 ck Ra . broctection zones for the
PH 62> 66451088 broposed development and should
APPENDIX 1 Fax 02> 66451099 SIZE | DATE: a REF # 7082 rorpose for any other
VEGETATION ne f
COMMUNITIES’ ASSET www.bushfiresafe.comau
PROTECTION ZONES SCALE: ‘SHEET
Page 35
MURRAY & ASSOCIATES (QLD.) PTY. LTD. AX GONSULTINGISURVEVORSIS1TOWNIREANNERS! MURRAY ABN 81 075 543 154 ACN 075 543 154 SURVEYORS LAND & ENGINEERING SURVEYORS, PLANNERS —— Established 1946 www.mursurv.com AMENDED PROPOSAL PLAN
Page 36
V/2Z0FOr | UMOTS SB yOTeyy :ALNNOD TONIHINA ‘HsIevd
Jie : ae
. —— YaNNVid NMOL
On GOP IWIS
~, - and Sd ; swbaaians 9991zz9y (ZO) xP4 99912294 (20) “Ud 3S YeMCE WNOH
‘YO ad CIIOIHD AMVC sulgD- 250 doJ Bu \ranik 96zazerS (LO) ‘XO4 vAyLZBPS (40) “Ud “3S 199H AIdWAD
Bap buruueyy(josodoig) Zero FIL NQDD Pe ‘d 1] D1] SUO LUA] Wj goazzasy (40) xo4 corscasy (20) “Ud “YS 40263 GTWe3N3 ‘sej0j20ssy @p ADuNW
a 6ZZ1S6%S (ZO) *xP4 BZ¥1S67S (20) “Yd 3S Bury auNL00avd Aq piay aq 0) Ayyqsuodse, oy ‘sbuyjoap
sy 10 001 7a MALE Lo/e/oe vo ¢GEEBSG!ldS uO 68 }07 ul Lo9zibrS (20) “*xe4.8BLZierS (40) Ud YS eHIND YNOBWVN pubj 4oj pasn aq JOU pjnoys UBjd SI4 “yIuUNoD
al EH giro! S17 JO BBUDYD /D/4830/V POSOdO le] ee aware ot A ONIUGGNIONE % NVI PAS SOON a i incoy soekgns pub Ajo
: : ; j ie aa WY = pened > ed “eed Bt te a 9g "O° aypuyxosdd ep svaiy ‘AjUO |DSOdOse D S} SIL
: jo ue[g ,Uaurdojasaq ‘ait “ALa Cad) ¥St evo 9 3
ONINNGH | , toa “
7 1NGITO . | SULVIOOSSV % AVUNON
APTODOT
Tues ' ;
oar
-xoidde wzg 7 Ha i i
asueysia wuss wesQ}SEOldS 7 \ :
$I 08 saveanauef- 927088dY !
ozseolds 7" 6G0SLE
psoas poses ‘
06 ag verursad
CRA
LA ‘
ety98 L6°6Z
eure fuze :
Ha
Ha
E106)
putig'e
vacestds Keains Aq tDJEP #P SINOJUOD 'E
06
\ 'B UlgoD pasodold 0} p9}JBAUOD
9g 0) papuezuy s} pays Ayop buysjxa aul ‘Z
“smeiA pup Aydos6odo} 9}/NS O}
pays q IIj!M puD A]UO BA/}DI{PU] 240 SADMOALIP
pup 2% | SUG pasododd JO U0}}D207 y
:89]0N
via ynodo} posjeu F uo},oud}uy Keaing Spnjou] 10/21 /0z ¥ 10008
(3A0Udd¥ NOISIAZY ava | “Au
EZ0IE A 20eL98d4
cee S$
suojstaagy JO afqel
ooe ose 002 OSI ool os 0 OF
T PUTIN)
ovl oct agi otf oot 06 og oz 09 os or oe oe oi 0 oi
ee een iaaLsieel osc 0S OSr or ost
c T 1 I T t q v T T
-soneR Uy ore ayy3ue] - SV@ OO0OFT 9TP°S
Lf 1 1 i 1 I T H } 1 1 T
‘sere Uy ere eTysTeT — OOOTT eTS°S
Used in these records
07/1413 - Response to Information Request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.0 MB (small file)
- File type
No other editions are linked here.