07/1413 - Response to Information Request [As Published] · 132007.1413
6.0 BUSHFIRE PERFORMANCE CRITERIA: The table below identifies crucial performance criteria and acceptable solutions required to satisfy adequate bushfire risk management strategies; the performance criteria is in accordance with the State Planning Policy 1/03 and Industry Best Practice. PERFORMANCE CRITERIA ACCEPTABLE SOLUTIONS PC1 Development must not materially intensify the use of bushfire | With the implementation of the prone land, or must provide for the highest intensity of use in the parts of the site which are least bushfire prone and limits the intensity of use elsewhere. recommendations outlined within this report regarding, building construction conditions and obtainable fire breaks this performance criteria has been satisfied. Ppc2 Buildings must be sited or able to be sited: e Incleared areas where the environmental impacts of vegetation clearing are acceptable, and * On land which is least prone to bushfire risk having regard to aspect, elevation, slope and vegetation Incorporate adequate and effective sitting and design measures to minimise bushfire risk, With implementation of the recommendations outlined within this report regarding, the appropriate sitting of habitable dwellings will comply with acceptable solutions REFER SECTION 8.0 PCS Firebreaks must be provided: e Roadways situated around the outside of the development site, or e Fire breaking trails: >» Situated around or through individual lots as required, >» Situated between the development site and surrounding vegetated areas, > Having sufficient width to both serve as an effective fire break and allow continuous access for fire fighting vehicles, and Being in secure tenure and maintained. With implementation of the recommendations outlined within this report the development will comply with Performance Criteria 3 REFER SECTION 8.4 PC4 Development of premises must have a sufficient supply of water for fire fighting purposes, including: e¢ Connection to a reticulated water supply scheme if available, with conveniently located hydrants, or Where a reticulated supply is not available, the provision of a dam, lake, water tank or swimming pool having sufficient capacity for water pumping in times of bushfire. With implementation of the recommendations outlined within this report the development will comply with Performance Criteria 4 REFER SECTION 8.3 Prepared by; BushfireSafe Services 07} 38209992 Bushfire Hazard Report: Proposed Tourist Facility, Lot 89. Black Mountain Road, Biack Mountain in SP158854.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/1413 - Response to Information Request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.0 MB (small file)
- File type
No other editions are linked here.