07/1413 - Response to Information Request [As Published] · 132007.1413

of 36

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

6.0 BUSHFIRE PERFORMANCE CRITERIA:

The table below identifies crucial performance criteria and acceptable solutions
required to satisfy adequate bushfire risk management strategies; the performance
criteria is in accordance with the State Planning Policy 1/03 and Industry Best

 

 

Practice.
PERFORMANCE CRITERIA ACCEPTABLE SOLUTIONS
PC1
Development must not materially intensify the use of bushfire | With the implementation of the

prone land, or must provide for the highest intensity of use in
the parts of the site which are least bushfire prone and limits
the intensity of use elsewhere.

recommendations outlined within this report
regarding, building construction conditions
and obtainable fire breaks this performance
criteria has been satisfied.

 

Ppc2
Buildings must be sited or able to be sited:
e Incleared areas where the environmental impacts of
vegetation clearing are acceptable, and
* On land which is least prone to bushfire risk having
regard to aspect, elevation, slope and vegetation
Incorporate adequate and effective sitting and design
measures to minimise bushfire risk,

With implementation of the
recommendations outlined within this report
regarding, the appropriate sitting of habitable
dwellings will comply with acceptable
solutions

REFER SECTION 8.0

 

PCS
Firebreaks must be provided:
e Roadways situated around the outside of the
development site, or
e Fire breaking trails:
>» Situated around or through individual lots as
required,
>» Situated between the development site and
surrounding vegetated areas,
> Having sufficient width to both serve as an
effective fire break and allow continuous
access for fire fighting vehicles, and
Being in secure tenure and maintained.

With implementation of the
recommendations outlined within this report
the development will comply with
Performance Criteria 3

REFER SECTION 8.4

 

 

PC4

Development of premises must have a sufficient supply of

water for fire fighting purposes, including:
e¢ Connection to a reticulated water supply scheme if

available, with conveniently located hydrants, or

Where a reticulated supply is not available, the provision
of a dam, lake, water tank or swimming pool having
sufficient capacity for water pumping in times of bushfire.

 

With implementation of the
recommendations outlined within this report
the development will comply with
Performance Criteria 4

REFER SECTION 8.3

 

Prepared by; BushfireSafe Services 07} 38209992

Bushfire Hazard Report: Proposed Tourist Facility, Lot 89. Black Mountain Road, Biack

Mountain in SP158854.

 

 

 

Used in these records

About this file

File size
2.0 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_1413 - Response to Information Request [As Published].pdf · 2.0 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.