Referrence Document - Removal of Anchor on Temporary Shoring Wall · OPW18/0264
IMPORTANT INFORMATION
SCOPE OF SERVICES completeness of the information provided to it by
or on behalf of the Client or sourced from any third
The document (“Report”) to which this page is party. MESO has assumed that such information
attached and which this page forms a part of, has is correct unless otherwise stated and no
been issued by Meso Design Pty Ltd (“MESO”) responsibility is accepted by MESO for incomplete
subject to the important limitations and other or inaccurate data supplied by its Client or any
qualifications set out below. other person for whom MESO is not responsible.
This Report constitutes or is part of services MESO has not taken account of matters that may
(“Services”) provided by MESO to its client have existed when the Report was prepared but
(“Client”) under and subject to a contract between which were only later disclosed to MESO.
MESO and its Client (“Contract”). The contents of TIME DEPENDENCY
this page are not intended to and do not alter
MESO’s obligations (including any limits on those Having regard to the matters referred to in the
obligations) to its Client under the Contract. previous paragraphs on this page carrying out the
Services, has allowed MESO to form no more
The scope of MESO’s Services and the period of than an opinion as to the actual conditions at any
time they relate to are determined by the Contract relevant location. That opinion is necessarily
and are subject to restrictions and limitations set constrained by the extent of the information
out in the Contract. collected by MESO or otherwise made available
GEOTECHNICAL ENGINEERING to MESO. Further, the passage of time may affect
the accuracy, applicability or usefulness of the
Geotechnical engineering is based extensively on opinions, assessments or other information in this
judgement and opinion. It is far less exact than Report.
other engineering disciplines. The Report is
prepared for a specific client, for a specific project REPRODUCTION OF REPORT
and to meet specific needs, and may not be This report is the subject of copyright and shall not
adequate for other clients or other purposes. be reproduced either totally or in part without the
REPORT FOR BENEFIT OF CLIENT express permission of MESO. Where information
from the accompanying report is to be included in
This Report is provided for use solely by MESO’s contract documents or engineering specification
Client and persons acting on the Client’s behalf, for the project, the entire report should be
such as its professional advisers. MESO is included in order to minimize the likelihood of
responsible only to its Client for this Report. misinterpretation.
MESO has no responsibility to any other person
who relies or makes decisions based upon this OTHER LIMITATIONS
Report or who makes any other use of this This Report is based upon the information and
Report. MESO accepts no responsibility for any other circumstances that existed and were known
loss or damage suffered by any person other than to MESO when the Services were performed and
its Client because of any reliance upon any part of this Report was prepared. MESO has not
this Report, decisions made based upon this considered the effect of any possible future
Report or any other use of it. developments including physical changes to any
RELIANCE ON DATA relevant location or changes to any laws or
regulations relevant to such location.
This Report has been prepared in the context of
the circumstances and purposes referred to in or By date, or revision, the Report supersedes any
derived from, the Contract and MESO accept no prior report or other document issued by MESO
responsibility for use of the Report, in whole or in dealing with any matter that is addressed in the
part, in any other context or circumstance or for Report.
any other purpose. Any uncertainty as to the extent to which this
MESO accepts no responsibility for and makes no Report can be used or relied upon in any respect
representation as to the accuracy or should be referred to MESO for clarification.
Meso Design Pty Ltd.
53 General Holmes Drive, Brighton-Le-Sands, NSW 2216
Tel: +61 (0) 2 9567 9382 www.mesos.com.au
ACN: 613 284 558
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Referrence Document - Removal of Anchor on Temporary Shoring Wall.PDFRelated documentApplication case desk ↗
About this file
- File size
- 311 KB (small file)
- File type
No other editions are linked here.