Noosa Council Conditions
INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION
1. Development undertaken in accordance with this approval must generally comply with the approved plans
of development. The approved plans are numbered Sk-21 (dated 12 June 2007) and Sk-02 to Sk-10
(dated 3 June 2006) and SK-11 to Sk15 (dated 1 July 2007) prepared by Gazza Design and as may be
amended by these conditions.
2. The development must be undertaken and operated in a manner that causes no detrimental effect upon
the amenity of the neighbourhood by reason of the creation of excessive noise, lighting nuisance or other
emissions.
3. The use and all activity on the site, including construction and excavation, is to be carefully controlled and
interference with vegetation kept to an absolute minimum. In this regard, no vegetation beyond 3 metres
of any part of the building shall be removed.
4. All roofing of the structure on site are to be of a non-reflective nature and coloured with muted earth tones.
All external surfaces are to use colours that integrate with the natural environment and be of muted earth
tones of browns, greens, ochres, greys etc.
5. The glass balustrade and all glass on the western elevation shall be either anti-reflective or non-glare.
6. All external lighting is to be hooded and angled away from neighbouring properties and main beach.
7. The building shall not exceed 2 stories in height as defined by The Noosa Plan.
A. A verification survey of the building is to be carried out by a Licensed Surveyor and a certificate lodged
with Council at completion of work confirming that the building height is not greater than that shown on the
approved plans.
8. All hot water systems installed shall be either solar systems; electric heat pump systems; or gas systems
(LPG or natural).
9. Buildings and structures (including swimming pools, sheds, tennis courts or outbuildings) are not
constructed under overhead electricity transmission lines, or within any easements.
10. Security in the form of a cash bond or trading bank guarantee to the sum of $5 000 must be submitted, to
secure performance of all conditions of this approval, prior to the issue of a Development Permit for
building works. The cash bond or trading bank guarantee will be returned on performance of the
conditions of approval less any costs incurred by Council in respect of enforcing performance of this
permit.
11. The Preliminary Approval for building work lapses if the use has not happened by 19 July 2009, unless an
application to extend the currency is approved by Council.
AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@a401e5ed\@[email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - 010.2006.00002617.001 [As Published]Related documentApplication case desk ↗
00157AE7.001.pdfRelated documentPublic source context ↗
About this file
- File size
- 26 KB (small file)
- File type
No other editions are linked here.