Skip to the record
The first. The best. The only NoosaWatch™.

Council archive · source document

Appendix A - Engineering Design Plans - 2 of 2 · OPW25/0057

of 27

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (16.9 MB): may take a few minutes to open.

Log in to see the plans as drawn

Original PDF page 14, section 1. The text section number identifies this passage in the reader.

 

cr = yo ~

IT IS THE RESPONSIBILITY OF THE
CONTRACTOR TO CONTACT THE RELEVANT
AUTHORITIES TO CONFIRM THE LOCATION OF
ALL EXISTING SERVICES PRIOR TO THE
COMMENCEMENT OF EXCAVATION

 

   

 

 

 

 

 
 
 
 
  

4X3
0.1340ha

3IX2 \
0.0119ha

 

 

 

 

 

AIF
0.0914ha

 

 

 

 

 

 

 

    

 

 
 

 

 

  
 
  

 

 

 

 

 

 

%
SRK \
17 Vos iw
fe) ‘
Bf 2Ix2 \
0.0171ha <x
is
LEGEND
11K2 oN
0.0025ha E _=— 0 STORMWATER CATCHMENT TO PROPOSED
—_—— STORMWATER PIT
CL —_— 7 STORMWATER CATCHMENT TO EXISTING
—<— STORMWATER PIT

PROPOSED STORMWATER DRAINAGE

EXISTING STORMWATER DRAINAGE

EXISTING SITE BOUNDARY

JO. DESIGN SURFACE CONTOURS (1m INTERVALS)
EXISTING SURFACE CONTOURS ({m INTERVALS)

 

2

 

 

 

 

 

 

 

‘Check all dimensions before commencement of work.

Check Site boundary dimensions from the Title plans

Check Building Boundary clearances by set out.

Notwithstanding the information supplied on this drawing,

SCALE 1:750 (A1) - 1:1500 (A3) the location, depth and extent of underground or overhead
services are to be confirmed and protected on site by the
contractor prior to commencement of works.

50m

s & & & &

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

AY ad

Checked- CT Porovet Drawing ttle - Project- PROPOSED 1 INTO 3 Site - Project No. 233467 Sheet No. C300
Design SK ___ravn-_ 8k 7 as | aS a COVEY | site: con esecaNcnucnnsre son] STORMWATER CATCHMENT PLAN DEVELOPMENT 62 LAKE MACDONALD DRIVE, DogialRet: SeRewS ewe: D

2 He : 1 GadbighunEng MEAust, PEO
Scales _AS SHOWN oe peer = covey ssocntes #10 ‘a Biron AVE Glent- NOOSA COUNCIL COOROY Ths Dost coy nd shal note coved

: : without witten aporoval, nor shal it be used excep

Document Stage APPROVAL {LU 4 Iso * (07) $443 7777 MAROOCHYDORE QLD 4558 for the Development and the Site Specified

issue Date Description By [email protected] au TS

ial Tovey OP Wiuncontroledics00 STORMWATER CATCHMENT PLAN.dw¢ Plot 25 March 2025 - 5:28 PM

Used in these records

About this file

File size
16.9 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Appendix A - Engineering Design Plans - 2 of 2.pdf · 16.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.