Approved Plans & Document OPW21-0272

of 42

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (22.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 17, section 1. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                                                                                                                                                                                                                                                                                                                                                                    LE ED
                                                                                                                                                                                                                                                                                                                                                                                                 DU AT
                                                                                                                                                                                                                                                                                                                                                                                                      S
                                                                                                                                                                                                                                                                                                                                                                                               HE IC
                                                                                                                                                                                                                                                                                                                                                                                             SC IND
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                AMENDMENTS




                                                                                                                                                                                                                                                                                                                                                                                          NT S
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                Rev       Date           Description                                      By




                                                                                                                                                                                                                                                                                                                                                                             ½ PLANT PLA G A
                                                                                                                                                                                                                                                                                                                                                                                           N
                                                                                                                                                                                                                                                                                                                                                                                     IN ACI
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                A         14.10.21 Operational Works                                      CI




                                                                                                                                                                                                                                                                                                                                                                                       SP
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                B         12.11.21 OPW                                                    CI
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                C         22.11.21 OPW                                                    CI




                                                                                                                                                                                                                                                                                                                                                                             SPACING
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                D         06.12.21 OPW                                                    CI
                                                                                                                                                                                                                                                                                                                        Staggered pattern to densities as
                                                                                                                                                                                                                                                                                                                        scheduled.                                                                          PLAN VIEW
                                                                                                                                                                                                                                 Decorative gravel as                                                                   Containerised plant material as per
                                                                                                                                                                                                                                                                                                                                                                            DISTANCE FROM
                                                                                                                                                     Organic mulch as specified.                                                                                                                                                                                       EDGE OF KERB OR PAVEMENT
                                                                                                                                                                                                                                 specified.                                                                             planting schedule.
                                                                                                                                                                                                                                                                                                                                                                                    ½ PLANT
                                                                                                                                                                                                                                                                                                                                                                                    SPACING                                            Containerised plant
                                                                                                                                                     Topsoil as specified.                                                                                                                                                                                                                                                             material as per planting
                                                                                                                                                                                                                                 Topsoil as specified.                                                                  Containerised plant material as per
                                                                 Turf as specified                                                                                                                                                                                                        Plan view                     planting schedule.                                                                                             schedule
                                                                                                                                                                                                                                                                                                                                                                                                                                       Organic mulch as specified
                                                                 Imported topsoil as specified                                                                                                                                                                                                                          Organic mulch as specified. (Keep                                                                              (keep 50mm clear of base
                                                                                                                                                                                                                                                                                                                        50mm clear of base of plant stems).                                                                            of plant stems).
                                                                 Ripped and cultivated                                                                                                                                                                                                                                  Mulch to be installed 15mm below
                                                                 subgrade as specified                                                               Ripped and cultivated                                                                                                                                              finished kerb or retaining wall level.
                                                                                                                                                     sub-grade as specified.                                                     Ripped and cultivated                                                                                                                                                                                  Topsoil as specified
                                                                                                                                                                                                                                 sub-grade as specified.




                                                                                                                                                                                                                                                                 100
                                                                                                                                                                                                                                                                                                                        Topsoil as specified.
                                                                 Existing subgrade




                                                                                                                                                                                                                                                                   300
                                                                                                                                                                                                                                                                                                                        Ripped and cultivated sub-grade,                                                                               Ripped and cultivated
                                                                                                                                                                                                                                                                                                                        add Terracottem®.                                                                                              subgrade as specified
                                                                                                                                                     Existing sub-grade
                                                                                                                                                                                                                                 Existing sub-grade                                                                     Existing sub-grade
                                                                                                                                                                                                                                                                                                                                                                                                                                       Existing subgrade



             01              Turf                                                                      02           Garden Bed                                                     03           Gravel Mulch                                                           04          Tubestock Planting on Natural Ground                                              05              Ground Cover Planting on Natural Ground
             801              1:10 @ A1                                                               801            1:10 @ A1                                                     801          1:10 @ A1                                                              801         1:20 @A1                                                                          801              1:20 @ A1




                                                                                                                                                                                                                                                                                                                                                                                                                          Bio-filteration planting.
                                                                                                                                                                                                                                                                                                                                                                                                                          Refer planting plan for
                                                                                          Bermed soil dish for water                                                                                                                                                                                                                                                                                                      species
                                                                                          retention
                                                                                          Organic mulch as specified (keep                                                                                                                                                                                                                                                                                                Jute matting as specified
                                                                                          50mm clear of base of tree trunks).
                                                                                          Mulch to be installed 15mm below                                                                                                                                                                                       FALL                                       FALL
                                                                                                                                                                                                                  Note:
                                                                                          adjoining surface.                        Surface treatment as specified                                                All pipe connections where shown on drawings           Drainage gravel trench as per                                                             Adjoining surface treatment as
                                                                                                                                    refer to landscape plans.                                                     to fully penetrate depth of coupling housing           subsurface drainage detail                                                                indicated on landscape plans.
                                                                                          Imported topsoil as specified                                                                                           and glued into position.                                                                                                                         finish surface to achieve falls to                     Filter media to engineers
                                                                                                                                    Filter fabric with 400mm                                                                                                                                                                                                       inlet                                                  specification
                                           ROOTBALL                                       Slow release fertiliser as specified
                                                                                                                                    overlap minimum.                                                             45 degree 3-way to stormwater
                                                                                                                                                                                                                 piping.                                                 100mm subsurface drainage                                                                 Connect field gully into flexible                      Transition & gravel layers
                                                                                          Ripped & cultivated subgrade as                                                                                                                                                connected into gully pit as indicated                                                                                                            to engineers detail
                                                                                                                                    10-20mm diameter drainage                                                    65-100mm stormwater                                                                                                                               or hard stormwater upstand
                                                                                          specified                                                                                                                                                                      on landscape plans.
                                                                                                                                    gravel.                                                                      piping.                                                                                                                                           provided by site plumber
                             2                                                            Excavate hole for rootball as
                                                                                          specified                                 Trench to be a minimum depth                                                                                                                                                                                                                                                          Existing subgrade
                                 1                                                        Existing subgrade                         of 300mm and width of 200mm.
                                                                                                                                    100mm perforated or flexible                                                 STRAIGHT                                                Existing subgrade                                                                         Field gully as specified                               Ag pipe to engineers
                                                                                                                                    PVC Ag. line with geo-textile                                                                                                                                                                                                                                                         detail
                                                                                                                                                                          75




                                                                                                                                    filter sock cover.
                                                                                                                                                                                                                                                                                                                                                                                                                          Subsoil drain clean out to
                                                                                                                                    Existing Sub-grade                                                           RIGID UPVC COUPLINGS                                                                                                                                                                                     engineers detail




             06              Shrub Planting on Natural Ground                                                                       07            Subsoil Drainage                                                                                                           08          Gully Pit                                                                                                                   09            Bio Basion Planting
             801              1:20 @ A1                                                                                             801           1:10 @ A1                                                                                                                  801         1:20 @ A1                                                                                                                   801           1:20 @ A1



                                                                                                                                                                                                                                                                                                                                                                                                                                                                       NOOSA COUNCIL
                                                                                                                                                                                                                                                                                                                                                                                                                                                                       APPROVED PLAN
                                                                                                                                                                                                                                                                                                                                                                                                                                                                    OPW21/0272 18 JAN 2022

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                This drawing is protected by copyright. Form Landscape Architects Pty Ltd
             Tree planting notes:                                                                                                                                                                                                                                                                                                                                                                                                                                                               retains the Copyright and Intellectual Property Rights. All rights reserved.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                Drawings shall not be used for construction purposes until issued by Form
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                Landscape Architects Pty Ltd as "FOR CONSTRUCTION". Use figured
             place rootball on firmed imported soil                                                                              45l - 200l tree -tease out base of                                                                                                                                                                                                                                                                                                                             dimensions only. Do not scale off this drawing. Verify all dimensions on site.
             to achieve fsl.                                                                                                     rootball prior to planting                                                                                                                                                                                                                                                                                                                                     Report any discrepancies to the Landscape Architect for decision before
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                proceeding with any work.
             Position plant so that the top soil level                                                                                                                                                                                                                                                             100l - 200l tree -tease out base of




                                                                                                                                                                                                                                                                                                                                                                                                                                                                         Not For Construction
                                                                                                                                 Bermed soil dish for water retention               Tree planting notes:
             of the rootball is level with the                                                                                                                                                                                                                                                                     rootball prior to planting
             finished surface level.                                                                                             Imported topsoil as specified                      excavate a square hole twice the
                                                                                                                                                                                    width and 300mm deeper than the                                                                                                 Treated hardwood timber stake (50 x
             Tamp backfill lightly and form a                                                                                    Organic mulch as specified (keep
                                                                                                                                                                                    rootball. Break up base of hole to a                                                                                            50 x 1800) -do not penetrate rootball -
             temporary watering ring.                                                                                            50mm clear of base of tree trunks).
                                                                                                                                                                                    further depth of 100mm. Loosen                                                                                                  stake to penetrate 200mm minimum
                                                                                                                                 Mulch to be installed 15mm below
                                                                                                                                                                                    compacted sides of the hole.                                                                                                    into existing subgrade                                                                                                                                                      Form Landscape Architects
             Water tree thoroughly to eliminate air                                                                              finished kerb or retaining wall level
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                900 Ann Street                                        [email protected]
             pockets.                                                                                                                                                               Where subsoil is dry, fill hole with
                                                                                                                                 Deep subsurface drains provided by                                                                                                                                                 50mm nylon/hessian tie stapled to                                                                                                                                           Trinity Lane, via Church Street                       ABN 29 097 234 305
                                                                                                                                                                                    water and let drain thoroughly prior to                                                                                         stake                                                                                     Adjoining garden bed as                                                           PO BOX 393                                            ACN 097 234 305
             Refer finishes schedule for sizing.                                                                                 civil.
                                                                                                                                                                                    planting.                                                                                                                                                                                                                 specified.                                                                        FORTITUDE VALLEY, QLD 4006                            formla.com.au
                                                                                                                                                                                                                                                                                                                    Bermed soil dish for water retention                                                                                                                                        T 07 3216 0606
                                                                                                                                                                                    Staple ties in a figure eight pattern                                                                                                                                                                                     60° Cut angle. 150mm cut
                                                                                                                                                                                    approximately 300mm from the top of                                                                                            Organic mulch as specified (keep                                                           depth.                                                                            CLIENT
                                       ROOTBALL




                                                                                                                                                                                                                                                                                                                   50mm clear of base of tree trunks).
                                                  300




                                                                                                                                                                                    stakes. Drive in stake as specified.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                Deluca
                                        DEPTH




                                                                                                                                                                                    Position plant so that the top soil level                                                                                      Mulch to be installed 15mm below                                                           Adjoining turf as specified.
                                                                                     ROOTBALL
                                                                                                                                 Ripped and cultivated subgrade as                  of the rootball is level with the                                                                                              finished kerb or retaining wall level                                                                                                                                        PROJECT
                                                                                                                                 specified                                          finished surface level. Where possible,                                                                                                                                                                                                                                                                     Noosa Youngcare
                                                                                                                                                                                                                                       ROOTBALL


                                                                                                                                                                                                                                                  300
                                                                                                                                                                                                                                        DEPTH




                                                                                                                                 Root barrier to protect adjacent                   position the tree so that the branches                                                         ROOTBALL                        Imported topsoil as specified
                                                                                                                                 structure.                                                                                                                                                                                                                                                                                                                                                     32 Viewland Drive
                                                                                                                                                                                    do not rub against stakes or will in
                                                         2
                                          300




                                                                                                                                 Lightly compact site topsoil or washed                                                                                                                                            Ripped and cultivated subgrade as                                                                                                                                            Noosa Heads
                                                                                                                                                                                    future conflict with buildings or
                                                                                                                                                                                                                                                                                                                   specified




                                                                                                                                                                                                                                                                                                                                                                                                                                             150
                                                             1                                                                   river sand in 150mm layers and place               overhead wires.                                                                                                                                                                                                60°
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                DATE                                             PROJECT NORTH
                                          100




                                                                                                                                 rootball on top                                                                                                                                                                   Lightly compact site topsoil or washed
                                                                                                                                                                                                                                                         2                                                                                                                                                                                                                                      Sept '21
                                                                                                                                                                                                                                           300




                                                                                                                                 100mm thick gravel drainage layer                  Tamp backfill lightly and form a                                                                                               river sand in 150mm layers and place
                                                                                                                                 with filter fabric cover                           temporary watering ring.                                                 1                                                     rootball on top                                                                                                                                                              SCALE
                                                                            ROOTBALL WIDTH                                       100 Ø corrugated perforated polyethylene                                                                                                                                          100mm thick gravel drainage layer                                                                                                                                            As Shown@A1
                                                                                                                                 pipe class 400 to water drainage layer and         Water tree thoroughly to eliminate air                                                                                         with filter fabric cover                                                                                                                                                     0        1         2                             5M
                                                                          2 X ROOTBALL WIDTH                                     protect pavement from water ingress.               pockets.
                                                                                                                                                                                                                                                                              ROOTBALL WIDTH
                                                                                                                                 Connect to stormwater system.
                                                                                                                                                                                                                                                                             2 X ROOTBALL WIDTH                                                                                                                                                                                                 DRAWING TITLE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                Details
                                                                                                                                                                                                                                                                                                                                                                                                  200                                                                                           Softscape
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                DRAWN                         CHECKED BY                         PHASE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                CI                            RH                                 OPW
            10              Street Tree Planting                                                                                                                                   11         Tree Planting on Natural Ground                                                                                                                                      12             Spade Edge                                                                                                    PROJECT NO.                   DRAWING NO.                        REVISION
            801                                                                                                                                                                    801        1:20 @ A1                                                                                                                                                            801
                            1:20 @ A1                                                                                                                                                                                                                                                                                                                                             1:10 @A1                                                                                                      191206                        801                                     D
Document Set ID: 21872926
Version: 1, Version Date: 31/03/2022
Log in to download the original file

Approved Plans & Document OPW21-0272.pdf · 22.0 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.