12936 CAR Notice
Attached to the e-mail MCU14/0056 Concurrence Agency Response.
Attached to the e-mail MCU14/0056 Additional information from applicant.
SARA reference: SDA-0714-12936 Applicant reference: 6520 Council reference: MCU14/0056 24 February 2015 Noosa Shire Council PO Box 144 TEWANTIN QLD 4565 Dear Denis Wallace Concurrence agency response—with conditions 125 Myall Street, Cooroy (Lot 4 SP248479) (Given under section 285 of the Sustainable Planning Act 2009) The referral agency material for the development application described below was received by the Department of State Development, Infrastructure and Planning under section 272 of the Sustainable Planning Act 2009 on 31 July 2014. The response to information request was received on 27 January 2015. Applicant details Applicant name: Creekgold Pty Ltd Applicant contact details: c/- Saunders Havill Group 9 Thompson Street BOWEN HILLS QLD 4006 Site details Street address: 125 Myall Street, Cooroy Real property description: Lot 4 SP248479 Local government area: Noosa Shire Council Application details Proposed development: Development Permit for Material Change of Use – Mixed use development – Retail Business Type 5 - Vehicle Uses (Service Station & Car wash), Entertainment & Dining Business Type 1 - Food & Beverages (Fast Food Outlet), Retail Business Type 2 – Shop (Supermarket & Convenience Retail), Industrial Business Type 1 – Warehouse (Self-Storage Facility), Visitor Accommodation Page1 SEQ North SARA Level 8, Mike Ahern Building 12 First Avenue PO Box 1129 MAROOCHYDORE QLD 4558
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 7 pages
Page 2
SDA-0714-12936
Type 2 - Caravan Park.
Referral triggers
The development application was referred to the department under the following
provisions of the Sustainable Planning Regulation 2009:
Referral trigger Schedule 7, Table 3, Item 1 – State controlled roads
Schedule 7, Table 3, Item 2 – Development impacting state
transport infrastructure
Conditions
Under section 287(1)(a) of the Sustainable Planning Act 2009, the conditions set out in
Attachment 1 must be attached to any development approval.
Reasons for decision to impose conditions
Under section 289(1) of the Sustainable Planning Act 2009, the department must set out the
reasons for the decision to impose conditions. These reasons are set out in Attachment 2.
Further advice
Under section 287(6) of the Sustainable Planning Act 2009, the department offers advice
about the application to the assessment manager—see Attachment 3.
Approved plans and specifications
The department requires that the following plans and specifications set out below and in
Attachment 4 must be attached to any development approval.
Drawing/Report Title Prepared by Date Reference Version/Issue
no.
Aspect of development: Material change of use
Proposed Site Layout Verve Building 23 January 14004-DA02 Revision F
Design and 2015
Concepts
Proposed Mixed Use vT Consulting 27 January 14012-ENG- Revision F
Development – Engineers 2015 04
Engineering Report &
Stormwater Management
Plan
Mixed Use Development, MRG 10 June 2014 0009 R1-01 N/A
Cooroy – Acoustic Environmental
Assessment, prepared by,
reference no., dated
A copy of this response has been sent to the applicant for their information.
For further information, please contact Tracey Smith, Senior Planning Officer, on
07 3882 8409 or via email [email protected] who will be pleased to assist.
Yours sincerely
Department of State Development, Infrastructure and Planning Page 2
Page 3
SDA-0714-12936
Garth Nolan
Manager (Planning)
cc: Creekgold Pty Ltd, c/- Saunders Havill Group
enc: Attachment 1—Conditions to be imposed
Attachment 2—Reasons for decision to impose conditions
Attachment 3—Further advice
Approved Plans
Department of State Development, Infrastructure and Planning Page 3
Page 4
SDA-0714-12936
SARA reference: SDA-0714-12936
Applicant reference: 6520
Council reference: MCU14/0056
Attachment 1—Conditions to be imposed
No. Conditions Condition timing
Material change of use
7.3.1 State controlled roads and 7.3.2 Development impacting state transport infrastructure—
Pursuant to section 255D of the Sustainable Planning Act 2009, the chief executive administering
the Act nominates the Director-General of the Department of Transport and Main Roads to be the
assessing authority for the development to which this development approval relates for the
administration and enforcement of any matter relating to the following condition(s):
1. The development must be carried out generally in accordance At all times
with the following plans:
Proposed Site Layout, prepared by Verve Building Design
and Concepts, reference no. 14004-DA02, revision F,
dated 23 January 2015
2. (a) The development must be in accordance with the acoustic (a) and (b) - At all
report Mixed Use Development, Cooroy – Acoustic times
Assessment, prepared by MRG Environmental, reference no. (c) – Prior to
0009 R1-01, dated 10 June 2014, in particular: obtaining a final
The acoustic barriers shown in Figure 4.2 of the report. inspection certificate
(b) The noise barrier must be designed and constructed in or certificate of
accordance with the Department of Transport and Main classification,
Roads’ Road Traffic Noise Management Code of Practice, whichever is
Chapter 5 and Technical Standards MRTS15. applicable, or prior to
(c) RPEQ certification must be provided to the North Coast the commencement
Region by email to [email protected] within of use, whichever
the Department of Transport and Main Roads, confirming that occurs first.
the development has been designed and constructed in
accordance with parts (a) and (b) of this condition.
3. (a) The development must be in accordance with the stormwater (a) and (b) - At all
management plan entitled Proposed Mixed Use Development times
– Engineering Report & Stormwater Management Plan, (c) – Prior to
prepared by vT Consulting Engineers, dated 27 January 2015, commencement of
reference no. 14012-ENG-04, revision F, in particular: use
Section 5 – Stormwater drainage
(b) Any works on the land must not:
i. Create any new discharge points from stormwater runoff
onto the state controlled road;
ii. Interfere with and/or cause damage to the existing
stormwater drainage on the state controlled road;
iii. Surcharge any existing culvert or drain on the state
controlled road;
iv. Reduce the quality of stormwater discharge onto the
state controlled road.
(c) RPEQ certification must be provided to North Coast Region
Department of State Development, Infrastructure and Planning Page 4
Page 5
SDA-0714-12936
No. Conditions Condition timing
by email to [email protected] within the
Department of Transport and Main Roads, confirming that the
development has been designed and constructed in
accordance with parts (a) and (b) of this condition.
4. The permitted road access location, for which approval under At all times
section 62 of the Transport Infrastructure Act 1994 must be
obtained, is to be located to Cooroy – Connection Road (Myall
Street) generally in accordance with Proposed Site Layout,
prepared by Verve Building Design and Concepts, reference no.
14004-DA02, revision F, 23 January 2015.
5. Direct access is not permitted between the Cooroy – Connection At all times
Road (Myall Street) and the subject site at any location other than
the permitted road access location (for which approval under
section 62 of the Transport Infrastructure Act 1994 must be
obtained).
6. Road access works comprising a new Channelised Right Turn Prior to the
Treatment (CHR) and Channelised Left Turn Treatment (CHL), commencement of
(for which approval under section 33 of the Transport use and to be
Infrastructure Act 1994 must be obtained) must be provided at the maintained at all
permitted road access location generally in accordance with times
Proposed Site Layout, prepared by Verve Building Design and
Concepts, reference no. 14004-DA02, revision F, 23 January
2015.
The road access works must be designed and constructed in
accordance with:
Department of Transport and Main Roads' Road Planning
and Design Manual (2nd edition); and
Manual of Uniform Traffic Control Devices (MUTCD).
Department of State Development, Infrastructure and Planning Page 5
Page 6
SDA-0714-12936 SARA reference: SDA-0714-12936 Applicant reference: 6520 Council reference: MCU14/0056 Attachment 2—Reasons for decision to impose conditions The reasons for this decision are: To ensure the proposed development is carried out generally in accordance with the plans of developments submitted with the application. To ensure that the impacts of stormwater events associated with development are minimised and managed to avoid creating any adverse impacts on the state transport corridors. To ensure the road access location to the state controlled road from the site does not compromise the safety and efficiency of the state controlled road. To ensure the design of any road access maintains the safety and efficiency of the state controlled road. To ensure the road works on, or associated with, the state controlled road network are undertaken in accordance with applicable standards. To ensure the required noise criteria are achieved to protect the development from intrusive impacts of road traffic noise. Department of State Development, Infrastructure and Planning Page 6
Page 7
SDA-0714-12936
SARA reference: SDA-0714-12936
Applicant reference: 6520
Council reference: MCU14/0056
Attachment 3—Further advice
General advice
1. An existing TransLink bus stop, “Ferrells Rd near Overlander Ave” (TransLink Stop
ID: 301955), is located on the Ferrells Road site frontage. There is no existing
footpath along Ferrells Road and the submitted plans do not propose footpaths to
the existing bus stop.
The Department of transport and Main Roads recommends that council should
require pedestrian connectivity between the development (namely the Tourist Park)
and the existing bus stops located in Ferrells Road.
2. The existing TransLink bus stop, “Ferrells Rd near Overlander Ave” (TransLink Stop
ID: 301955), is likely to be impacted on by the development during construction. The
bus stop must be able to function and pedestrian access to this facility must be
maintained during the construction of the development.
Accordingly, if any temporary bus stop and pedestrian access arrangements are
required during the construction of the development, the applicant must reach
agreement on suitable arrangements with TransLink (3338 4493).
3. In accordance with the Department of transport and Main Roads Roadside
Advertising Guide (RAG), the location of the proposed advertising device fronting the
Bruce Highway is within the Device Restriction Area and will pose a potential
distraction and risk to motorist safety.
Any future application for Advertising devices facing the Bruce Highway in this
location will not be supported pursuant to s43 of the Transport Infrastructure Act
1994 (TIA).
Road access works approval:
4. Under sections 62 and 33 of the Transport Infrastructure Act 1994, written approval
is required from the Department of Transport and Main Roads to carry out road
works that are road access works (including driveways) on a state-controlled road.
Please contact the Department of Transport and Main Roads on 07 5451 7055 or
[email protected] to make an application for road works approval.
This approval must be obtained prior to commencing any works on the state-
controlled road reserve.
The approval process may require the approval of engineering designs of the
proposed works, certified by a Registered Professional Engineer of Queensland
(RPEQ). The road access works approval process takes time – please contact
Transport and Main Roads well in advance to ensure that gaining approval does not
delay construction.
Please note, it may be necessary to dedicate land as road in order to accommodate
the road access works that comply with the Department’s conditions.
Road corridor permit
5. An application for a Road Corridor Permit is required for any ancillary works and
Department of State Development, Infrastructure and Planning Page 7
Page 8
SDA-0714-12936
encroachments on the state-controlled road under section 50(2) and Schedule 6 of
the Transport Infrastructure Act 1994 and Part 5 and Schedule 1 of the Transport
Infrastructure (State-Controlled Roads) Regulation 2006. Please contact the
Department of Transport and Main Roads on 5451 7055 to make an application for a
Road Corridor Permit.
Ancillary works and encroachments include but are not limited to advertising signs or
other advertising devices, paths or bikeways, buildings/shelters, vegetation clearing,
landscaping and planting.
Department of State Development, Infrastructure and Planning Page 8