Original source · versioned page text
12936 CAR Notice
Attached to the e-mail MCU14/0056 Concurrence Agency Response.
Attached to the e-mail MCU14/0056 Additional information from applicant.
SDA-0714-12936 SARA reference: SDA-0714-12936 Applicant reference: 6520 Council reference: MCU14/0056 Attachment 1—Conditions to be imposed No. Conditions Condition timing Material change of use 7.3.1 State controlled roads and 7.3.2 Development impacting state transport infrastructure— Pursuant to section 255D of the Sustainable Planning Act 2009, the chief executive administering the Act nominates the Director-General of the Department of Transport and Main Roads to be the assessing authority for the development to which this development approval relates for the administration and enforcement of any matter relating to the following condition(s): 1. The development must be carried out generally in accordance At all times with the following plans: Proposed Site Layout, prepared by Verve Building Design and Concepts, reference no. 14004-DA02, revision F, dated 23 January 2015 2. (a) The development must be in accordance with the acoustic (a) and (b) - At all report Mixed Use Development, Cooroy – Acoustic times Assessment, prepared by MRG Environmental, reference no. (c) – Prior to 0009 R1-01, dated 10 June 2014, in particular: obtaining a final The acoustic barriers shown in Figure 4.2 of the report. inspection certificate (b) The noise barrier must be designed and constructed in or certificate of accordance with the Department of Transport and Main classification, Roads’ Road Traffic Noise Management Code of Practice, whichever is Chapter 5 and Technical Standards MRTS15. applicable, or prior to (c) RPEQ certification must be provided to the North Coast the commencement Region by email to [email protected] within of use, whichever the Department of Transport and Main Roads, confirming that occurs first. the development has been designed and constructed in accordance with parts (a) and (b) of this condition. 3. (a) The development must be in accordance with the stormwater (a) and (b) - At all management plan entitled Proposed Mixed Use Development times – Engineering Report & Stormwater Management Plan, (c) – Prior to prepared by vT Consulting Engineers, dated 27 January 2015, commencement of reference no. 14012-ENG-04, revision F, in particular: use Section 5 – Stormwater drainage (b) Any works on the land must not: i. Create any new discharge points from stormwater runoff onto the state controlled road; ii. Interfere with and/or cause damage to the existing stormwater drainage on the state controlled road; iii. Surcharge any existing culvert or drain on the state controlled road; iv. Reduce the quality of stormwater discharge onto the state controlled road. (c) RPEQ certification must be provided to North Coast Region Department of State Development, Infrastructure and Planning Page 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.