Council archive · source document
07/2398 - Revised Noise Report and cover letters to referral agencies [As Published] · 132007.2398
=
RSL Care ==
Proposed RSL Retirement Village, Cooroy - Road and Rail Noise Assessment (Revised) =——=
According to Tables 4.2 and 4.3, the internal noise criteria is predicted to be exceeded by up to
35 dB(A) for the ILU buildings. Exceedances are also predicted for the Aged Care Facility, 20 Unit
Apartment and Community Village Centre by up to 30 dB(A).
4.4.2 Alternate Construction Materials
The Noosa Shire Council has specified internal noise criteria for passing trains. Construction
material requirements for achieving the recommended internal noise levels are discussed in
conjunction with the findings of the road noise assessment in Section 5.6.1.
AIR NOISE ENVIRONMENT PTY LTD
{NETWORK/PROJECTS/1750/REPORTING/2008 REVISION/1750REPORTO4.0DT Page 14
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2398 - Revised Noise Report and cover letters to referral agencies [As Published]Related documentApplication case desk ↗
About this file
- File size
- 6.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.