Council archive · source document
07/2398 - Revised Noise Report and cover letters to referral agencies [As Published] · 132007.2398
Main Roads CONDITIONS AND STATEMENT OF REASONS Application type: Material change of use Councit: Noosa Shire Main Roads File No: 92/145/D7950 Council Ref: 2007/2398 Road: Cooroy Connection Road Development Number: 7950 Response Date: 16 January 2008 ISSUES / CONDITIONS OF DEVELOPMENT FOR | THE REASONS, INFORMATION, CONCERNS THE SUBJECT APPLICATION STUDIES, FINDINGS, USED IN SETTING OF CONDITIONS INCLUDED: Management of access to a State-controlled Toad. There shall be no direct access to Cooroy Connection Road, All access is to be via Pearsons Road or Lamonts Road. By minimising the number of points of access to the State-controlled road network, safety and efficiency are maximised. Works within the State- controlled road reserve. The applicant is to upgrade the Cooroy Connection Road / Pearsons Road intersection to incorporate a channelised right tum lane (Type CHR) as shown on Figure 13.60 of Main Roads' document, "Road Planning and Design Manual". The applicant is to upgrade the Cooroy Connection Road / Lamonts Road intersection to a Type BAR standard as shown on Figure 13.58 of Main Roads’ document, "Road Planning and Design Manual". Prior to the commencement of any works within the State-controlled road, the applicant must arrange for detailed engineering plans and specifications for the proposed works to be submitted to Main Roads for assessment and be approved. The engineering design, plans and specifications submitted must be certified by an appropriate Registered Professional Engineer Qld (RPEQ). Note: Further approvals will be required for construction in accordance with the requirements of section 33 of the Transport Infrastructure Act 1994. Main Roads’ Road Planning and Design Manual, Chapter 13 — Intersections at Grade. Traffic study submitted by McConmick - Rankin Cagney. Works to be in accordance with Main Roads Technical Manuals, Policies and Guidelines together with relevant State and National Standards. Cost of works. All works associated with this proposal, including relocation of services, lighting, etc. must be carried out at no cost to Main Roads. The works are required to enable the development to proceed without compromising the safety and efficiency of the State-controlled road network.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2398 - Revised Noise Report and cover letters to referral agencies [As Published]Related documentApplication case desk ↗
About this file
- File size
- 6.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.