REPS 3. Appendix C - Body Corporate fee estimate with lift
18 May 2022 Attention: Altum Property Group Suite 4/8 Kingfisher Drive, PEREGIAN BEACH QLD 4573 Dear Alex, RE: 245 DAVID LOW WAY, PEREGIAN BEACH QLD 4573 – LIFT COSTS The Body Corporate contributions for 245 David low Way, Peregian Beach QLD are currently: x $22,093 (Inc GST) per annum - ($5,523.25 per unit per annum) x $318.65 (Inc GST) per week - ($106.22 per unit per annum) If a lift were to be added, the Body Corporate contributions would increase as follows: x $32,163 (Inc GST) per annum - ($8,040.75 per unit per annum) x $463.89 (Inc GST) per week - ($154.63 per unit per week) This amount is $10,070.00 per annum more in total and $2,517.50 per annum more per unit compared to a development without a lift. This is an increase of 45.58%. A summary of the annual ongoing costs associated with a development including a lift are below: LIFT COSTS Registration $350.00 Service & Maintenance $6,600.00 Lift – Telephone $420.00 TOTAL $7,370.00 (Inc GST) Increased Sinking fund $1,500.00 Increased Insurance $1,200.00 TOTAL $8,870.00 (Inc GST) Annual cost per unit: $2,517.50 Please refer to Annexure 1 & 2 for the Budget & Entitlements for this property with a lift. Kind regards Peter Cassels Director - Cassels Strata Management Pty Ltd
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 2 pages
Page 2
ANNEXURE 1 – BUDGET (LIFT) [OCR of page images] CASSELS STRATA ANNEXURE 1 — BUDGET (LIFT) CASSELS STRATA Body Corporate for 245 David Low Way Proposed budget for the initial 12 months of the Scheme [Contributions Receivable $20,163] LESS EXPENSES Accounting Fees Income Tax - Lodgement Fees $203 Administration Fees Administration Fees $1,980 Disbursements, IT Electronic archiving - Contract $500 Banking Fees Bank Charges $10 Cleaning/Gardening Cleaning/ cleaning Materials $5,000 Common Uti Electricity $1,500 Water $500 Fire Control Fire Control - Repairs and Maintenance $1,500 General Maintenance R&M- Building $500 R &M- Electrical $350 Insurance Insurance - Building $8,000.00 Lift Costs Registration $350 Service & Maintenance $6,600 Lift - Telephone $420 Professional Fees Sinking Fund Forecast/Ins Valuation $750 $8,000 $20,163 Total INC GST $8,000 $20,163] Total Units of Entitlement 400 400 Levy Per Unit of Entitlement $20.0000 $50.4075 Contributions Receivable $4,000 Total INC GST $4,000 | Total Units of Entitlement 400 Levy Per Unit of Entitlement $10.0000 www.casselsstrata.com.au
Page 3
ANNEXURE 2 – ENTITLEMENTS (LIFT) [OCR of page images] CASSELS STRATA ANNEXURE 2 — ENTITLEMENTS (LIFT) STRATA Body Corporate for 245 David Low Way Schedule of Proposed Contributions Contribution Interest Building Administration LOT NO. Schedule Lot Lift Costs BCM Schedule Lot] Insurance J Fund (Total INC caine ee _| Total Per Lot Per Pare cise . Entitlement Agreement | Entitlement | Contribution GST) based on based on CSLE Year (INC GST) INC GST) (CSLE) (ISLE) based on ISLE} CSLE & ISLE 1 100 $1842.50 $58750 100 $2,000.00] $5,040.75 $1,000.00] $8,040.75 $154.63] 2 100 $1842.50 $587.50 100 $2,000.00 $5,040.75 $1,000.00] $8,040.75] $154.63] 3 300 $184250 $587.50] 100 $2,000.00] $5,040.75 $1,000.00] $8,040.75] $154.63] 4 100 $1842.50 $587.50] 100 $2,000.00 $5,040.75 $1,000.00] $8,040.75] $154.63] ‘OTALS 400 $7,370.00) $2,350.00] 400 $8,000.00) $20,163.00 $4,000.00 $32,163.00 $463.89 www.casselsstrata.com.au