Original source · versioned page text
REPS 3. Appendix C - Body Corporate fee estimate with lift
ANNEXURE 2 – ENTITLEMENTS (LIFT) [OCR of page images] CASSELS STRATA ANNEXURE 2 — ENTITLEMENTS (LIFT) STRATA Body Corporate for 245 David Low Way Schedule of Proposed Contributions Contribution Interest Building Administration LOT NO. Schedule Lot Lift Costs BCM Schedule Lot] Insurance J Fund (Total INC caine ee _| Total Per Lot Per Pare cise . Entitlement Agreement | Entitlement | Contribution GST) based on based on CSLE Year (INC GST) INC GST) (CSLE) (ISLE) based on ISLE} CSLE & ISLE 1 100 $1842.50 $58750 100 $2,000.00] $5,040.75 $1,000.00] $8,040.75 $154.63] 2 100 $1842.50 $587.50 100 $2,000.00 $5,040.75 $1,000.00] $8,040.75] $154.63] 3 300 $184250 $587.50] 100 $2,000.00] $5,040.75 $1,000.00] $8,040.75] $154.63] 4 100 $1842.50 $587.50] 100 $2,000.00 $5,040.75 $1,000.00] $8,040.75] $154.63] ‘OTALS 400 $7,370.00) $2,350.00] 400 $8,000.00) $20,163.00 $4,000.00 $32,163.00 $463.89 www.casselsstrata.com.au
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.