Council archive · source document
Archs April 2024 - compressed · 132001.210326.1
Very large file (15.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.
HR HANGING RAIL
LMT/LM LAMINATE
REFER FINISH
SCHEDULE
INTERNAL LEGEND MI MIRROR
MX- MIXER
2P 2PAC FINISH MW MICROWAVE
A/C AIR-CONDITIONING NOM NOMINAL
AD ADJUSTABLE SHELF OV OVEN
BN BIN PF PAINT FINISH
BO- BASIN OUTLET REF- FRIDGE & FREEZER
COS CONFIRM ON SITE RH RANGEHOOD
CT- COOKTOP S- SINK & MIXER
CL CENTRE OF ITEM ST- STONE OR
DR DRAWER PORCELAIN SLAB
DW DISHWASHER SS STAINLESS STEEL
EX EXISTING SH SHELF
GS GLASS SHELF SSH SHOWER SHELF
ADJUSTABLE SR- SHOWER RAIL
GPO GENERAL POWER TRH TOILET ROLL HOLDER
OUTLET NEW TR- TOWEL RAIL
H- HOOKS T- TILE
HR HANGING RAIL VB- VANITY BASIN
LMT/LM LAMINATE WC- TOILET
REFER FINISH WL- WALL LIGHT
SCHEDULE
MI MIRROR
2,000 MX- MIXER
1,800 MW MICROWAVE
900 NOM NOMINAL
16 600 1,184 OV OVEN
16 PF PAINT FINISH
REF- FRIDGE & FREEZER
RH RANGEHOOD
16
S- SINK & MIXER
2P T-01 T-01 T-01 ST- STONE OR T-01
PORCELAIN SLAB
SS STAINLESS STEEL
2P MI MIRROR STANDOFF SH SHELF T-02 TO
J06 2P
2P FROM WALL ON SSH SHOWER SHELF CURVED
16mm LM SUBSTRATE WALL
SR- WL-01SHOWER RAIL
GS TRH TOILET ROLL HOLDER
J05 J05 ^TOWEL
2400 RAIL
TR-
0
60
AD T- TILE
R
EX. DOOR REPAINT
VB- VANITY BASIN
GS WC- WL-01 TOILET
WL- 2150 LIGHT
^WALL
300
1,680
1,500
AD GS
300
AD
GS
2,880 (C.O.S)
GPO
400
SH
150 ST-01 SHELF
100
SS BRACKET
REBATE
20
UNDERSIDE OF
T-01 STONE SHELF TO OVERHANG TO OPEN
280
WC-01 BE FLUSHED MX-01
BO-01 ST-01
TR-01 MX-01 TR-03
VB-01
150
150
ST-01 BO-02 MX-01
STONE TOP ST-01
5mm OVER
HANG
2P
225
THR J04
DR 2P
1,200
GPO
1,070
1,070
450
150
BATH
920
920 DR 2P 2P
SH 225
750
700
WC-01 J04 PROVIDE MIN. 30MM TO
T-01 CLEAR FROM HITTING
320
320
THE DOOR JAMB
T-01
470 30 eq eq
E GUEST BATH
1,800
1:20
S GUEST BATH
1:20
WORK IN PROGRESS NOT FOR CONSTRUCTION
N Drawing Title
COMPLIANCE: All works to comply with Australian Standards,Queensland and National Sykes Alt & Add to The Palms Amendment List
Construction Code requirements.
DIMENSIONS: Verify dimensions before commencing any work or making any shop
701/61 Noosa Springs Dr
issue detail
DD05 Progress Issue
date
25.03.2024 W E
INTERNAL ELEVATION_GUEST BATHROOM
drawings. Figured dimensions take precedent over scale. Noosa Heads DD06 Progress Issue 05.04.2024
COPYRIGHT: This drawing is copyright and property of the architects and must not be Noosa Shire Council 1:20 @ A3 April 2024 2309 1006 DD06
Client Project Scale Date Project No. Drawing No. Revision
retained, copied or used without their written authority. S
GSPublisherVersion 1257.74.74.100
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Archs April 2024 - compressed.pdfRelated documentApplication case desk ↗
About this file
- File size
- 15.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.