Original source · versioned page text
Appendix C - Ecological Assessment Report
e) avoiding causing ingress of saline water into
freshwater aquifers of wetlands; and
f) avoiding contaminants entering groundwater (e.g.
from runoff, effluent disposal).
Rehabilitation of ecologically important areas
PO10 AO10.1 AO10.1
Development provides for ecologically Landscaping and rehabilitation complements and supports A Riparian Rehabilitation Plan has been prepared
important areas to be restored and ecologically important areas by: which comprehensively uses local native species
enhanced through: a) utilising local native species; that occur within the local riparian vineforest
a) designing landscaped areas to b) utilising suitable plant species identified in PSP2 communities. Any additional site landscaping can
complement and enhance existing Landscaping; be conditioned by Council to comply with AO10.1.
vegetation and ecological linkages; c) restoring degraded ecosystems to achieve a
b) removing species likely to displace functional ecosystem state that requires minimal
native flora species or degrade human intervention;
fauna habitat; d) replicating adjacent remnant habitats of the same
c) replanting and rehabilitating type, including the understorey vegetation;
degraded habitat; e) creating or enhancing linkages between existing
d) replacing any vegetation removed habitats;
with suitable local native species; f) avoiding the use of pest plant species listed in
e) providing for fauna habitat; and PSP2 - Landscaping;
f) avoiding the planting of pest plant g) planting riparian zones to filter stormwater run-off,
species. stabilise soil and provide for wildlife habitat; and
h) providing ground and arboreal structures for fauna,
which may include ground depressions, rocks,
hollows, nesting boxes and in-stream habitat.
AO10.2 AO10.2
Vegetation cleared is replaced with: N/A – No vegetation clearing is proposed.
a) plantings of equivalent area that replicate the
floristic structure of the vegetation removed; or
b) where this is not possible due to the characteristics
of the site and the development, plantings twice
the number of the removed trees and plants.
Editor’s Note — Revegetation and rehabilitation works are
to be carried out in accordance with an approved
Revegetation and Rehabilitation Management Plan, as
referred to in PSP3 Ecological assessment guidelines.
Koala habitat protection and enhancement
APRIL 2023 ECOLOGICAL ASSESSMENT REPORT Page: 16
157 LAWNVILLE ROAD, BLACK MOUNTAIN
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.