Council archive · source document
Negotiated Decision Notice OPW18 0016 · OPW18/0016
Officer: Mark Lewis Direct Telephone: 07 53296290 Our Reference: OPW18/0016 : JELDER Your Reference: . 2 July 2018 CF Mair PO Box 1053 NOOSA HEADS QLD 4567 [email protected] Dear Madam, Negotiated Decision Notice Planning Act 2016 I refer to your application and the representations you made in respect to the decision notice. On 28 June 2018, Council decided your representations. This negotiated decision notice replaces the decision notice approved on 15 May 2018. Details of the negotiated decision are as follows: APPLICATION details Application No: OPW18/0016 Street address: 26 Dolphin Bay Dr Sunshine Beach Qld 4567 Real property description: Lot 1 SP 299953 Planning Scheme: The Noosa Plan (27 November 2017) decision details Council on 15 May 2018, decided to issue the following type of approval: Development Permit for Operational Work - Vehicle Crossover & Clearing Veg In relation to representations, Council on 28 June 2018 decided to: A. Change the approval to a Development Permit B. Agree to delete Condition 1 C. Include additional conditions currency period of approval The currency period for this development approval is 1 year starting the day that this development approval takes effect. assessment manager conditions Deleted. APPROVED PLANS Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions. Plan No. Rev. Plan/Document Name Date 17058-S02 B Slab and Footing Plan prepared by Casswell Consulting as annotated by Council 20 March 2018 17058-S05 Retaining Wall and Slab Details prepared by Casswell Consulting as annotated by Council 20 March 2018 SITE SPECIFIC CONDITIONS The final location of the driveway in the road reserve and the full extent of clearing must be determined with Council’s delegate at the prestart meeting. Tree protection fencing and other tree protection measures must be installed under the supervision of qualified Arborist. Within 20 days of the completion of the works the applicant must submit to Council certification from a suitably qualified Registered Professional Engineer of Queensland (RPEQ) that states that the constructed works: have the capacity to cater for the expected stormwater flows in accordance with Council’s Planning Scheme Policy PSP 5 will not result in additional ponding of stormwater on the subject site, the road reserve or any adjoining property will not result in any scour or damage to the subject site or the adjoining reserve. An easement for drainage purposes must be registered in favour of Council against the title of the subject site. The easement must: extend from the existing easement (Emt H on RP860439) to the common boundary between the subject site and the adjoining Reserve (Lot 400 on RP810724), be a minimum 3 metre wide centrally located over the drainage structures or be of sufficient width to fully contain the 1%AEP flows from the local catchment that drains through the site, be generally in accordance with Council’s Standard Dealing No. 715597508 and be amended to place the maintenance responsibilities wholly on the property owner (the Grantor). The easement must be registered with 3 months of the completion of the works. SITE SPECIFIC CONDITIONS Engineering A condition report including photographs of the frontage of the site must be completed and submitted to Council at the prestart meeting. The principal contractor must have all the appropriate insurance and public liability documentation to carry out the works. The principal contractor is also responsible to ensure that any subcontractors also have the appropriate insurance and public liability documentation. Certificates demonstrating currency of public liability insurance and works insurance covering the works must be submitted to Council prior to the prestart meeting. Council must be contacted at least 5 working days prior to any works commencing to organise a prestart. The contact number to arrange a pre-start meeting is 5329 6245. The pre-start meeting must include the relevant parties for the following aspects of the works: Civil engineering works; Tree protection A Construction Management Plan must be submitted to Council prior to the pre-start meeting and must specifically address the following: traffic Management during the construction phase. appropriate traffic signage in accordance with the Manual of Uniform Traffic Control Devices (MUTCD) provision for safe pedestrian access across the frontage of the site both. Any changes to the details associated with the supervising RPEQ or Principal Contractor during construction, must be notified to council in writing within five business days of the change occurring. Any conflict between the development and an existing or proposed service must be referred to the relevant service authority for determination prior to commencement of works. DURING CONSTRUCTION Engineering The integrity and condition of any existing public or Council infrastructure and services (above ground and/or underground) must not be adversely affected by the proposed works The developer must meet any costs to repair damage to any Council asset during construction, where damage is a result of the development works. Damage to assets must be repaired immediately where it creates a hazard to the community. In circumstances where the damage does not create a hazard to the community, it must be repaired immediately on completion of the works associated with the development. All works must be constructed and work procedure undertaken in accordance with: the approved plans/documents and conditions detailed in this Decision Notice all relevant Noosa Council Planning Scheme Policies, standard drawings, standard specifications and guidelines the latest version of the Healthy Waterways document “Water Sensitive Urban Design Technical Design Guidelines for South East Queensland” for all water quality devices to be constructed on site. Works within Road Reserves No removal of street trees is permitted without Council’s prior written approval. Safe pedestrian access on all streets in the vicinity of the development must be maintained at all times. Should footpath/road closures be necessary to carry out construction works, Council’s Engineering Officer must be notified prior to the proposed closure and all requirements complied with. All works must match neatly with existing road and verge/footpath features. Additional works beyond the frontage may be required to provide an acceptable transition to existing road and verge/footpath profiles. Driveways Driveway crossovers must be constructed generally in accordance with Council’s Standard Drawings RS-049 and RS-050 Any existing unnecessary or redundant property accesses must be removed, and the kerb, footpath and verge area reinstated to match the existing footpath and/or verge treatments. Grassed verge areas to be reinstated must be provided with 100 mm topsoil and grass seed or turf, and must be maintained by the developer until established. The following must be complied with during the construction of the required crossover/driveway: the driveway surfacing must consist of either an approved hot mixed asphaltic concrete or patterned/plain concrete. the driveway must be in accordance with the requirements of AS2890.1 Off-Street Car Parking for longitudinal and crossfall gradients. the driveway must be constructed so as to not concentrate or direct stormwater runoff onto neighbouring properties or the road reserve underground service conduits for water supply, electricity and any other services must be provided as part of the access driveway where there is an existing pedestrian path, a matching crossfall must be provided for the driveway on the alignment of the path, for the full width of the path have a minimum clearance of 500mm from any Unitywater/Energex/Telstra asset, unless a written approval is obtained from Unitywater/Energex/Telstra and submitted to Council. any stormwater kerb outlet in close proximity to the edge of the new driveway must be provided with an approved kerb adaptor any existing kerb sections requiring removal due to the works must be saw-cut and removed to allow for a smooth and neat finish with the new driveway Pavement design for privately owned works must be undertaken in accordance with the relevant standards. Structural integrity of the driveway and car park areas will remain the responsibility of the property owner/developer. Stormwater Drainage The constructed driveway must not cause additional ponding on the road formation or the road reserve. Environment (Erosion and Sediment Control) Prescribed Water Contaminants (as defined in the Environmental Protection Act 1994) must not be released from the site or to waters within the site, or be likely to be released should rainfall occur, unless all reasonable and practicable measures are taken to prevent or minimise the release and concentration of contamination. The contractor must ensure non-essential exposure of soil is prevented by restricting the extent of works and minimising the duration of soil exposure to adverse weather conditions. Exposed areas must be suitably covered/stabilised/reinstated as soon as practicable and prior to any predicted rainfall occurring. Erosion and sediment control measures must be installed and maintained to minimise erosion on the site and to minimise the export of sediment and associated pollutants from the site. The erosion and sediment control measures must be designed, installed and maintained in accordance with current best practice standards (refer to advisory notes). FOLLOWING CONSTRUCTION A final inspection and approval of the new driveway and completed reinstatement works by Council’s Inspector is required. Please contact Council on 5329 6245 to arrange for the inspection. Upon completion of the work a certificate must be issued by an RPEQ certifying that the works have been constructed in accordance with the requirements of this Operational Works permit. Bonds A site control and/or compliance bond of $2500 is to be submitted to Council prior to the pre-start meeting. The pre-start meeting will only be held once Council's Construction Engineering Officer has confirmation that the bond monies have been received by Council. The bond will be refunded less any costs incurred by Council in ensuring compliance with these conditions or any additional inspections incurred for substandard work or work undertaken not in accordance with this permit. Bonds must: meet the requirements of council’s relevant Planning Scheme Policy for performance and uncompleted works. include GST be lodged with Council and accompanied by the Bond Administration Fee/s. be requested for release by writing to Council, when relevant approval requirements have been met. referral agencies Not applicable. Advisory notes The following notes are included for guidance and information purposes only and do not form part of the assessment manager conditions: General Advisory Notes As this driveway is a private structure, the owner bears full responsibly for the standard of its construction, maintenance and any liabilities associated with its construction. It is recommended that professional advice be sought for the construction of the driveway to ensure that the driveway is constructed in accordance with standard drawings RS-049 and RS-050. Council has undertaken an audit check of the Operational Works drawings in relations to the proposed works. A detailed check of the calculations and drawings has not been undertaken, as they have been certified by a RPEQ. The RPEQ bears full responsibility for all aspects of the engineering design. Council reserves the right to require further amendments and/or additions at a later date should design errors become apparent. Council reserves the right to call up any performance bond held or levy charges against the property, should emergency works be required to be undertaken by Council to make the site safe due to inactivity on the development site for extended periods of time. Should any changes or modifications to the approved plans be required as a result of construction constraints, a “Request to change an existing approval” under the Planning Act 2016 must be made. Amended plans clearly indicating the changes must be lodged with this application along with the appropriate fees. Prestart Inspections Request Contact Council on 5329 6245 to arrange a prestart or an inspection giving a minimum of 5 business days notice of preferred inspection time. If Council officers are required to undertake additional inspections of the same works, a reinspection fee will be applicable in accordance with Council’s Fees and Charges register applicable at the time. Environmental Advisory Notes The Environmental Protection Act 1994 states that a person must not carry out any activity that causes, or is likely to cause, environmental harm unless the person takes all reasonable and practicable measures to prevent or minimise the harm. Environmental harm includes environmental nuisance. In this regard persons and entities, involved in the civil, earthworks, construction and landscaping phases of this development are to adhere to their ‘general environmental duty’ to minimise the risk of causing environmental harm. Erosion and Sediment Control Accepted best practice standards include: the Sunshine Coast Regional Council Manual for Erosion and Sediment Control V1.2 or other superseding document subsequently adopted by Council; Best Practice Erosion and Sediment Control, International Erosion Control Association (2008) property notes Not applicable. VARIATION approval Not applicable. further development permits required Development Permit for Clearing and Driveway. submissions Not applicable. RIGHTS OF APPEAL You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the Planning Act 2016 is attached. During the appeal period, you as the applicant may suspend your appeal period and make written representations to Council about the conditions contained within the development approval. If Council agrees or agrees in part with the representations, a negotiated decision notice will be issued. Only one negotiated decision notice may be given. OTHER DETAILS If you wish to obtain more information about the decision, electronic copies are available on line at www.noosa.qld.gov.au or at Council Offices. Yours faithfully, Mark Lewis Coordinator - Engineering Enc: Appeal Rights Approved Plans/Documents cc. Unitywater [word/footer1.xml] Page 5 of 6 [word/footer2.xml] PO Box 141 P. (07) 5329 6500 [email protected] TEWANTIN QLD 4565 F. (07) 5329 6501 www.noosa.qld.gov.au Page 1 of 6 [Attachment: image2.png (image text)] ee) NOOSA COUNCIL
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Negotiated Decision Notice OPW18 0016Related documentApplication case desk ↗
About this file
- File size
- 316 KB (small file)
- File type
- DOCX
No other editions are linked here.