SARA RFI - Preliminary Earthworks Plans

of 3

Page text shows just the words. Original shows the document exactly as it was published.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         APPROX. LOCATION OF EXISTING Ø150            SITE PREPARATION NOTES:
                                                                                                                                                                                                                                                                                                             NOTE: ALL WORKS TO BE                                                                                                                                                       SEWER MAIN. SEWER TO BE          ·           FOLLOWING BULK EXCAVATION AN APPROVED CBR15 MATERIAL SHALL BE IMPORTED
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         ACCURATELY LOCATED VIA VACUUM
                                                                                                                                                                                                                                                                                                             UNDERTAKEN UNDER STRICT                                                                                                                                                     EXCAVATION & SURVEY PRIOR TO
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      TO CONSTRUCT A WORKING PLATFORM A MINIMUM OF 150mm THICK. PLATFORM TO
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      BE COMPACTED TO 98% MOD (STD) AS1289 E1.1
                             NOTE: EXISTING SEWER TO BE                                                                                                                                                                                                                                                      GUIDEANCE OF ARBORIST                                                                                                                                                       COMMENCMENT OF WORKS             ·           THE PLATFORM SHALL BE ROLLED WITH A 15 TONNE ROLLER AND FLOODED USING




                                                                                                                                                                                                                                                                                                                                                                                                         PEW




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  S
                                                                                                                                                                                                                                                                                                                                                                                                               B
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      75mm DIAMETER FIRE HOSE & SPEAR AND COMPACTED VIA HIGH ENERGYVIBRATION
                             ACCURATELY LOCATED VIA VACUUM




                                                                                                                                                                                                                                                                                                                                                                                                          02




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        BA URT
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      BY AN EXPERIENCED CONTRACTOR. ANY LOOSE SUBGRADE SHALL BE EXCAVATED




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         CO
                             EXCAVATION & SURVEY PRIOR TO                                                                                                                                                                                                                                                                                                                                                                                                                                                                             AND REPLACED WITH MATERIAL THAT WILL COMPACT TO AT LEAST THE STANDARD




                                                                                                                                                                                                                                                                                                                                                    PEW0




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          NK
                                                                                                                                                                                                                                                                                                                                                              C
                             COMMENCMENT OF WORKS                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     BELOW.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            ·         FILL FOR BENEATH THE SLAB SHALL BE CLEAN WHITE NATURAL SAND, FREE OF ANY




                                                                                                                                                                                                                                                                                                                                                         2




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            SIA
                                                                                                                                                                                                                                                                                                                                                                                 SHEET PILING TO                                                                                                                                      ORGANIC MATTER OR ANY MATERIAL THAT WILL NOT FORM A STABLE FILL.




                                                                                                                                                                                                       S
                                                                                                                                                                                                                                                                                                                                                                                 MANUFACTURERS SPEC                                                                                                                         ·         PLACED IN 200mm MAX LAYERS AND COMPACTED TO A DENSITY INDEX OF 75% AS




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  S
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      DETERMINED BY TESTS E6.1 OF AS1289.




                                                                                                                                                                                                                                   S
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            ·         ALL EXCAVATIONS TO BE BATTERED BACK AT THE MATERIAL'S ANGLE OF REPOSE AS
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   PROPOSED SEWER




                                                                                                                                                                                               W
                                                                                                                                                                                                                                                                                                                                                                                                                   PAD LEVEL                                                                                                          DETERMINED BY GEOTECHNICAL ENGINEER OR SHORED VIA SHEET PILING OR
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   RELOCATION SUBJCT TO               OTHER APPROVED METHODS.




                                                                                                                                                                                      S
                                                                                                                                                                                                               S
                                                                                                                                                                                                                                                                                                                                                                                                                   RL14.3                                                                          UNITYWATER APPROVAL




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      S
                                                                                                                                                                                                                     W
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            ·         SUBGRADE DENSITY TO BE VERIFIED BY DCP TESTING TO ENGINEERS DIRECTION
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      PRIOR TO FOOTING CONSTRUCTION.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               S
                                                                                                                                                                                                D




                                                                                                                                                                           W




                                                                                                                                                                                                                                           S
                                                                                                                                                                                          PE                                                                                                                                                                                                                                                                                                                                          EARTHWORKS NOTES:




                                                                                                                                                                                                                                    D
                                                                                                                                                                                             W                                                                                                                                                                                                                                                                                                     SHEET PILING TO


                                                                                                                                                  S
                                                                                                                                                                                              02




                                                                                                                                                                                               S
                                                                                                                                                                                                   W
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   MANUFACTURERS SPEC           1.    THE CONTRACTOR SHALL IMPLEMENT THE SEDIMENT CONTROL MEASURES DETAILED.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      ALL PERIMETER CONTROL MEASURES SHALL BE INSTALLED PRIOR TO DISTURBANCE
                                                                                                                                                                         PE       E        SHEET PILING TO                                                                                                                                                                                                                                                                                                                            OF THE SITE.
                                                                                                                                    W


                                                                                                                                                                           W               MANUFACTURERS SPEC                                                                                                                                                                                                                                                                                                                   2.    THE CONTRACTOR IS TO ALLOW FOR STRIPPING AND STOCKPILING TOPSOIL FOR
                                                                                                                                                                            03
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      FUTURE USE. REFER SEDIMENT AND EROSION CONTROL NOTES FOR TREATMENT
                                                                                                                                                                              S
                                                                                                                                                                                                                                                                                                                                                    PAD LEVEL
                                                                                                                                                                                  W
                                                                                                                                                                                                                                                                                                                                                                                                                                                            RL18.0
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      DETAILS.
                                                                                                                                                                                                                                                                                                                                                    RL10.8                                                                                                                                                                      3.    FILL IS TO BE PLACED IN ACCORDANCE WITH THE REQUIREMENTS OF AS 3798-1996




                                                                                                                                                                                                                                             D
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      "GUIDELINES ON EARTHWORKS FOR COMMERCIAL AND RESIDENTIAL DEVELOPMENTS"
                                                                                                              W




                                                                                                                                                                                                                                                                                                                                                                                                                                                                     RL18.0
                                                                                                   S




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      - LEVEL ONE (1) SUPERVISION AND TESTING.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                4.    ALL WORK IS TO BE COMPLETED IN ACCORDANCE WITH ALTA PROJECTS STANDARD
                                                                                                                                    S




                        PROPOSED SEWER
                                                                                                                                           W




                        RELOCATION SUBJCT TO                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          SPECIFICATION.
                        UNITYWATER APPROVAL                                                                   PE      F
                                                                                                                W
                                                                       W
                                                   S




                                                                                                                  03                                                                                                                                                                  D
                                                                                                                                                                                                                                                                                                                                                                                                                    POSCW
                                                                                                                                                      SHEET PILING TO
                                                                                                                                                                                                                                                                                                       S                                                                                                                                                                                                                              SHEET PILING NOTES:
                                                                                                                                                                                                                                                                                                                                                                                                                    ENVIRONMENTAL
                                                                                                              S




                                                                                                                                                      MANUFACTURERS SPEC                                                                                                                                                                                                                                                                                                                                                    ·         ALL TEMPORARY AND PERMANENT SHEET PILING TO BE DESIGNED, DOCUMENTED




                                                                                                                                                                                                                                                                                                                                                                  | | |
                                                                                                                  W




                                                                                                                                                                                                                                                                                                                                  D                                                                                 MANAGEMENT &
                                                                                                                                                                                                                                                                                                                                             S                                                                      CONSERVATION ZONE                                                                                                 AND CERTIFIED BY THE SHEET PILING CONTRACTOR




                                                                                                                                                                                                                                                                                                                                                                  |
                                                                                                                                                                                                                                                                                                                                                              |
                                                                                                                                                                                                                                                                                                                                                          |                                                                                                                                                                 ·         ALL SHEET PILING, WHALERS, GROUND ANCHORS ETC. TO BE DESIGNED IN




                                                                                                                                                                                                                                                                                                                                                              |
                                     W




                                                                                                                                                                                                                                                                                                                                                      |
                                                                                                                                                                                                                                                                                                                                                                      D                                                                                                                                                               ACORDANCE WITH THE RELEVANT AUSTRALIAN STANDARDS, LOCAL AUTHORITY
                                                                                                                                                                                                                                                                                                                                                                                               SHEET PILING TO
                                                                       S                                                                                                                                           PAD LEVEL                                                                                                    | |   | | | | | |
                                                                                                                                                                                                                                                                                                                                                                                               MANUFACTURERS SPEC
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      REQUIREMENTS & PROVISIONS OF THE WORKPLACE HEALTH AND SAFETY ACT.
                                                                                                                                                                                                                                                                                                                         | |                                               EX5

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            ·         DESIGN LOADS DUE TO RETAINED SOIL, GROUND- WATER, ADJACENT STRUCTURES &
                                                                                                                                                                                                                   RL10.8
                                                                               W




                                                                                                                                                                                                                                                                                                                                                                            1


                                         PE                                                                                                                                                                                                                                                                        | |
                                                  G




                                             W                                                                                                                                                                                                                                                               | |                                                                                                                                                                                                                      SERVICES, SURCHARGES, CONSTRUCTION TRAFFIC ETC. ARE TO BE DETERMINED BY
                                                  03                                                                                                                                                                                                                                                   |   |
                                                                                                                                                                                                                                                                                                                                           EXTENT OF TEMPORARY
                                                                                                                                                                                                                                                                                                 |   |
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      THE SHEET PILING CONTRACTOR IN LIASON WITH THE GEOTECHNICAL CONSULTANT
                                                                                                                                                                                                                                                                                           |   |
                                                                                                                                                                                                                                                                                                                                           1 IN 2 BATTER
                                                                                                                                                                                                                                                                                     | |
                    W




                                                                                                                                                                                                                                                                                                                                                                                     D
                                                                                                                                                                                                                                                                               | |                                                                                                                                                                                                                                                    & STRUCTURAL ENGINEER.
                                                                                                                                                                                                                                                                         | |
                                                                                                                                                                                                                                                                   |   |                                                                                                                                                                                                                                                    ·         ALL EXISTING SERVICES TO BE LOCATED ON SITE BY THE SHEET PILING




                                                                                                                                                                                                                                                                                                                                                                                 S
                                                                                                                                                                                                                                                                                                                                                                                         EX6


                                                                                                                                                                                                                                                             | |
                                                                                                                                                                                                                                                                                                                                                                                          1
                                     S




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      CONTRACTOR. ANY DAMAGE CAUSED TO EXISTING SERVICES BY SHEET PILING
                                         W




SHEET PILING TO                                                                                                                                                                                                                                        | |
                                                                                                                                                                                                                                                 |   |
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      OPERATION ARE TO BE RECTIFIED BY THE SHEET PILING CONTRACTOR.
MANUFACTURERS SPEC                                                                                                                                                                                                                         | |
                                                                                                                                                                                                                                       |
                                                                                                                                                                                                                                                                                                                                                                                               7                                                                                                                            ·         THE SHEET PILING CONTRACTOR IS TO ASSESS THE LIKELIHOOD OF VIBRATION
                                                                                                                                                                                                                                   |




                                                                                                                                                                                                                                                                                                                                                                                               1




                                                                                   PAD LEVEL                                                                                                                                                                                                                                                                                                                                                                                                                                          DAMAGE OR OTHER DEGRADATION OF ADJACENT STRUCTURES, SERVICES ETC DUE
                                                   |                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  TO SHEET PILING OPERATIONS. ANY SUCH DAMAGE INCURRED IS TO BE RECTIFIED
                                                                                   RL17.05
       W




                                                       |   |
                                                               |   |                                                                                                                                                                                                                                                                                                                                                                                                                                                                  AT THE SHEET PILING CONTRACTOR'S EXPENSE.
                                                                       |   |
                                                                               |   |                                                                                                                                                                                                                                                                                                                                                                                                                                        ·         THE SHEET PILING CONTRACTOR'S ENGINEER WILL PREPARE AND CERTIFY WORK
                                 W
                             S




                                                                                                                                                                                                                                                                                                                                                                                                   OUT
                                                                                                                                                                                                                                                                                                                                                                                                    1
                                                                                       |   |
                                                                                               |   ||                                                                                                                                                                                                                                                                                                                                                                                                                                 METHOD STATEMENTS WHICH DETAIL SEQUENTIAL PROCESSES FOR:
                                                                                                        | |
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                -       SHEET PILE INSTALLATION
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                -       EXCAVATION
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                -       ANCHOR INSTALLATION, TENSIONING & GROUTING
                                                                                                                                                                                                                                                                                                                                                                                                                                               LEGEND                                                                       ·         ALL WORKS SHALL BE CARRIED OUT INACCORDANCE WITH THE WORK METHOD
        W




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      STATEMENT
                                                                                                                                                                                                                                  S
                                         W
                                 S




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      PROPOSED EARTHWORKS CUT               ·         SHEET PILES TO BE INSTALLED PLUMB & WITHIN 50mm OF DESIGN PLAN ALIGNMENT
                                                                                                                                    | ||




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            ·         VIBRATION MONITORING IN ACCORDANCE WITH AUSTRALIAN STANDARDS TO BE
                                                                                                                                      |
                                                                                                                                        | |




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      CARRIED OUT DURING ALL SHEETPILING AND ANCHORING OPERATIONS.
                                                                                                                          W
                                                                                                                                              |
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            ·         MAXIMUM VIBRATION LIMITS OF 5MM/SEC TO BE ACHIEVED FOR ADJACENT
                                                                                                                                                  |




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      100mm COMPACTED GRAVEL
                                                                                   W
                                                                                                                                                    | ||




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      HARDSTAND CBR15                                 ''EMERALD'' BUILDING
                                                                                                                                                                                                           >
                         W




                                                                                                                                                             |                                                             POSCW
                                                                                                                                                         |




                                                                                                        D                                                        |   | |                                                                                                                                                                                                                                                                                                                                                    ·         CONTRACTOR TO INDEMNIFY PRINCIPLE AGAINST ANY ACTIONS ARISING FROM
                                                                                                                                                                           | |                                             ENVIRONMENTAL
                                                                                                                                                                                                       >




                                                                                                                                                                                                                                                                                                                                                                                                                                                            8.90                      PROPOSED EARTHWORKS LEVEL                       STRUCTURAL OR COSMETIC DAMAGE TO ''EMERALD'' BUILDING DUE TO
                                                                                                                                                                                                                           MANAGEMENT &
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      CONSTRUCTION OPERATIONS.
                                                                                                                                                                                                    >




                                                                                                                                                                                                                           CONSERVATION ZONE
                                                                                                                                                                                                           S
                                                                                                                          W




                                              EXTENT OF TEMPORARY
                                              W                                                                                                                                                                                                                                                                                                                                                                                                                                       SHEET PILING TO MANUFACTURERS
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 NOTE:
                                                                                                                                                                                               >




                                              1 IN 2 BATTER                                                                                                          D                                                                                                                                                                                                                                                                                                                DESIGN & CERTIFICATION.
                                                                                                                                                                                            >




                                                                                                                                                                     S                                                                                                                                                                                                                                                                                                                                                              ALL SERVICES TO BE LOCATED BY CONTRACTOR ON SITE PRIOR TO CONSTRUCTION. ANY
                                                                                       S                 W                                                                                                                                                                                                                                                                                                                                  | | | | | | | | | | | | |         |
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      PROPOSED TOP OF BATTER
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    DAMAGE TO EXISTING SERVICES TO BE RECTIFIED AT CONTRACTORS EXPENSE.
                                                                                                                                                                                                                                                                                                                                                    ALL BATTER GRADIENTS                                                                                                              PROPOSED TOE OF BATTER
                                                                                                                                                                                                                                                                                                                                                    TO BE CONFIRMED BY                                                                                                                EXISTING SURFACE CONTOUR
                                                                                                                                                                                                                                                                                                                                                    GEOTECHNICAL                                                                                                                                                                NETT EARTHWORKS VOLUMES
                                                                                                                                                                                                                                                                                                                                                                                                                                                        E                             EXISTING ELECTRICAL RETICULATION
                                                                                                                                                                                                                                                                                                                                                    ENGINEER'S ONSITE                                                                                   T                             EXISTING TELSTRA RETICULATION                  EARTHWORKS FILL (SOLID)                           = 0m³
                                                                                                                                                                                                                                                                                                                                                                                                                                                        D                             EXISTING STORMWATER DRAINAGE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     EARTHWORKS CUT                                    = 74946m³
                                                                                                                                                                                                                                                                                                                                                    ALL WORKS TO BE CARRIED OUT IN STRICT                                                               W                             EXISTING WATER RETICULATION
                                                                                                                                                                                                                                                                                                                                                    ACCORDANCE WITH APPROVED SETTLERS                                                                   S                             EXISTING SEWER RETICULATION                    NOTE: ALL QUANTITIES SOLID COMPACTED IN GROUND. VOLUMES HAVE BEEN
                                                                                                                                                                                                               0           10                20                         30                           40                    50                       COVE NOOSA RESIDENTIAL HIGH DENSITY                                                                                                                                              CALCULATED FROM EXISTING SURFACE TO EARTHWORKS PAD LEVEL (VOLUMES
                                                                                                                                                                                                                                                                                                                                                    ENVIRONMENTAL MANAGEMENT PLAN (EMP1)                                                                                              STORMWATER MANHOLE / LABEL                     INCLUDE ADDITIONAL EXCAVATION REQUIRED FOR CBR15 MATERIAL AND
                                                                                                                                                                                                                                                                                                                                                    DATED 21 JULY 2005 BY WBM OCEANICS.                                                                                                                                              EXCAVATION FOR TEMPORARY BATTERS
                                                                                                                                                                                                                                 SCALE 1:500 (A1), 1:1000 (A3)



NOTE: ONLY DRAWINGS MARKED "FOR CONSTRUCTION" AND BEARING AN ORIGINAL SIGNATURE SHALL BE USED FOR CONSTRUCTION Design:
                                                                                                               PURPOSES.
                                                                                                                       PBL                                                                                                                                                                                                                                                                                               PROJECT:                                                                                                               DRAWING TITLE:
                                                                                                                                                                                                                                                                                                                                                                          Brah 101 pty ltd t/a Alta Projects
                                                                                                                                                                                                                   Drawn: PBL
                                                                                                                                                                                                                                                                                                                                                                          A.B.N. 91 611 354 511                                                                                                                                                 PRELIMINARY EARTHWORKS LAYOUT
                                                                                                                                                                     FOR APPROVAL                                   Date: AUG 2022                                                                                                                                        26 Memorial Avenue, Cotton Tree                PROPOSED HOTEL
                                                                                                                                                                                   NOT FOR CONSTRUCTION                                                                                                                                                                   PO Box 559, Cotton Tree, QLD, 4558                                                                                                                                                                            Revision     Sheet
                                                                                                                                                                                                               Checked:. . . . . . . . . . .
                                                                                                                                                                                                                                                                                                                                                                          Tel (07) 5475 4125 Fax (07) 5479 1607          at 3-7 SERENITY CLOSE, NOOSA HEADS                                                                                     DRAWING No:
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 A6769-22-PEW01           B         1 of
                                                                                                                                                                                  STEVEN HARRISON
                                                                                                                                                                                                                                                                                                                                                                          Email: [email protected]
  B
  A
       10/07/2023
       05/10/2022
                    ISSUE FOR APPROVAL
                    ISSUE FOR APPROVAL
                                                                                                                              PBL
                                                                                                                              PBL
                                                                                                                                                  S.H.
                                                                                                                                                  S.H.
                                                                                                                                                                         .......................
                                                                                                                                                                             DIRECTOR APPROVAL                      Datum AHD
                                                                                                                                                                                                                                                                                                                                                                          Web: http://www.alta.net.au                    for CALILE MALOUF INVESTMENTS
 REV    DATE                                  DESCRIPTION                                                                     BY           CHKD                              RPEQ - 4784                             A1 SHEET SIZE                           FILENAME : a6769-22-PEW01 EARTHWORKS LAYOUT.dwg - DATE : 10/7/23 - 2:44pm - XREF's: X-SURVEY; X-ARCH 3 ground; X-ARCH 1 basement; X-ARCH 2 lower ground; H-Approved-SH; H-Checked-SH                                                            Council Ref:
Log in to download the original file

SARA RFI - Preliminary Earthworks Plans.pdf · 5.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.