Skip to the record
For the highest quality transcripts.

Council archive · source document

08/0215 - Op Works - Landscaping, Sediment & Erosion, Frontage Stormwater, Filling, Car Parking & Acess [As Published] · 142008.215

of 47

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

eS

ny NEOLOK We Checklist - Applications Involving Land
Development & Land Use Sections

 

 

 

 

IDAS APPLICATION
This checklist should be used for any IDAS application. Please check each of the following items before accepting an
application at the counter.
+a

   
   
 

Form 1 Part A
1.1.1 Ensure that the form is fully completed.
1.1.2 In the case of an MCU or Op Works below the high-water mark, owners consent is required.
1.1.2.1 If there are multiple owners, the consent of each owner is required.
1.1.2.2 If the owner of the land is a company, either ACN No. or Company Seal required.
14.2 Form! Part 8-O Supporting Information
1.1.2 Ensure that for each box checked on Form A, the relevant additional Forms B-O are attached.
1.1.2.1 Ensure that each of Forms B-O which are attached are fully completed.

 

 

 

 

 

 

3.4 Ensure that Part G is completed if EPA referral is required.

3.2 Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application
fee is paid and recorded on the application.

 

 

  

 

41 Eneure that items 4-28 have been checked and/or completed including information regarding
applicant details and owners consent.

 

 

 

 

 

 

 

64 Ensure that at least 6 sets of the Plan of Development (5 for Reconfiguration a and ‘Operational 3
Works) accompanies the application. In addition ensure that each set is complete.

6.2 Ensure that 1 of the copies of the Plan of Development is in an A3 or A4 format and is "
unbound.

 

 

i Ensure that at least 6 copies of any report eccompanies the application (6 for Reconfiguration
and Operational Works). If the application is accompanied by a covering letter, ensure that it Is
@ capable of reproduction.

 

 

 

  

tn the case of reports, ensure that 1 of the copies is in an A3 or A4 format and is unbound. =

   
 

  
   

Ensure that the application 100, as determined from the Council s “adopted scale of fees, S/S
accompanies the application or has been paid.
7.2 Ensure that the fee which has been paid is recorded on the application form. . Y

Receiving Officer . hs Soon Date .. A tl: OP...

Having completed this form and socepied the appji€ation, please deliver both to the folowing ID IDAS S Application Receiving

trays:-

» Ifthe application is for a Material Change of Use exclusively -AOP1's desk in the Land Use Section.

« — {f the application is for an Materfal Change of Use & Reconfiguration - AOP1’s desk in the Land Use Section.

¢ ifthe application is for Operational Works (for parking, access, sewerage or drainage) exclusively - AOD2 in the
Land Development Section.

« Inall other circumstances - AOP1's desk in the Land Use Section.

Please DO NOT leave the application at the counter and DO NOT deliver the application to Records.

 

a
i
|
|
’

 

 

 

 

 

   

 

 

 

SEP! g:\antYorms\application checklist.doc
Full text of the other 46 pages

Page 2

INTEGRATED PLANNING ACT 1997

Pan A Version 2.4. vy Mey “05€

 

 

Common d details

 

The completion of all applicable questions on Part Ais mandatory for alt applications. Part A must be accompanied by the completed 1DAS DAS Assessment ! Checklist,
required, and by one (1).or more ‘other: completed arts of the Form as required.’ For more information on the parts of the Form refer to wrw.ipa.gid gov du

Any information requested it in the form may be provi edt ina

 

attachment to the application. For further information about completing the fotiowing details, re! "er to Guine *

 

Description of tand . yA.

Allland the subject of the application, must be
identified. However, a description of the land is not

required in relation to a mobile or temporary 2

Environmentally Relevant Activity (ERA)
Advice for completing Q2 - Q2 appiies if
development is proposed within a water body or
walecourse. 3;

Advice for completing Q3 - Most land can be
identified by a lot on plan description. These details

can be obtained from title documents or througli the 4 .

local government.

However, if the land on which the development is
proposed does not have a lot an plan des¢ription (i.e. .
the development is proposed in a water body or
walercourse) provide -
(i) the lot on plan description for the
adyoining/adiacent land, or
(ii) GPS coordinates where there Is No
adyomning/adjacent land (eg. in Moreton Bay) 5.
Advice for completing Q? - Q7 does not apply if the
derelopment is within a water body or watercourse,

Advice for completing Q8 - Q8 applies if 8.

evelopment is within a local government area.
diute’ Areas beiow high water mark are not within a
focal government's area unless provided for under the
Local Government Act 1993. 9.
Advice for completing Q9 - Q9 applies it
development is on stratugic dort land or a Strategic
port lana tidal area. For nore details refer to Gu:

 

“proposal details

(there is insufficient room available, details may be
Provided «n at attactiment to the application

 

40. Existing use’of the land: (eg. vacant, H, single house, shop etc.)

 

Street-address: {nctudinghouse number, street name, suburb/ocality name & postcode) {it applicabie)
| 784 CYmMePIE  ~fenkec€ Mocs AUICLE & S66

Narie of water body or watercourse, within which the development is proposed “it appicn

L

Lot on plan description (eg. Lot 123 on RP 4567)! GPS coordinates:

[it T RP CT BEB.

The above ‘description is for: (lick applicable box)

)~" tHe 'land oni which the development is proposed; or

“EV Qi) the'land adjoining:the water body or watercourse, within which the development is
~ proposed; or”

(1 (iii). the water body or watercourse.

 

 

 

 

 

Shop / tenancy number: 6. Storey / ievel: 7. Total area of lane

_ Po, 08 eG HF,
Local government area in which the land i is situated: (eg. Esk. Her

[peeve

Port authority for the strategic port laid 2 tec :
development is proposed: (cg. Port of Brisbane burt fo Townsville e} ia appr

Woes

 

S600 Ob) UE pI ada

 

rwaich the

 

 

 

: pon

DWCUL AN -

 

41. Proposed use of the fand: (eg. 6 unit apartment busding, 36 fot residential subdivision, 1 ERA for aquaculture «

 

ponds witha lola area of zi ha for which wastes are 12 released int into waters etc)

PCE , : m4

 

 

 

Other applicable parts of Form 4
Part A must always be accompanied by other
conpluted parts of Form +. For information sbout
when a pad ol Form 1 may apply refer to Guide 1.

 

 

Clearly identify who is mahing the application: The*
applicant need not be the owner of the jand.

When signing and lodging this application 114.

‘The applicant is responsibie for ensuring Ihe
information provided 1s correct. The assessment
manager, any fetet-f agency & the Chic! Executive

(wre applicable) will reiy on this information when 17
assessing and deciding the application

ifthe applicant is a company - a comact percon
must be shown.

|
|
|

 

Applicant details : | 13. Applicant's name:

\18.

 

 

Contact person _.
| BUILDING SURVEYING PROF.QLD | STEWART MAGILL
Contact number:

foa3s4gi4a7

Postal addres:

[ PO BOX 1632 BUDERIM 4556 _

Signature:

 

 

46. Facsimile t number/c-mail address:
| 64435273

 

 

 
   

Page 3

INTEGRATED PLANNING ACT 1997 Part A, Version 2.4, 29 May 2006
d dua Sangent 0 tre making ofthis application:

   
 
 
 
  
 
 
   
 
 
 
  
  
 

 

 

 

Name Signature Date
RET - BRACKET, a L
 Uycomn. RRNCREN | 5 ‘a Be hola elute

    

 

 

 

 

 

 

 

Protection and Management Act 1995)?

ES™.90 fo 022

lication is accompanied by evidence: (tick applicable bor)

(i). .of the allocation of, ar entitlement to, the resource - attach evidence and go to 023(v)

EA) the chief executive of the department administering the resource is satisfied the

developmentts consistent with an allocation of, or entitlement to, the resource - go
£0023...

i);:the Chief.6 acutive of the department administering the resource is satisfied the
,developme cation: may.proceed In the absence of an allocation of, or
i SQUIER ~'go to. O23

ent: we
Mince entitlement:/ authority details

  
 
  

(vil) Official stamp of the department
administering the resource (if
applicable)

 
   
   

 

 

 

 

 

 

 

 

 

vende of evidence — |

2 IDAS Assessment Checklist completed and attached to this application?
ae (NO- the asséssment manager may refuse to accept this application on the
grounds that the application has not been property made

 

 

 

 

 

 

 

 

 

 

 

 

 

PLEASE NOTE: The assessment manager may refuse to accept an application that, af the time of lodgement, fails to provide al! applicable information required by Part A
and any other relevant part af Form 1

 

OFFICE USE ONLY (applicable to assessment managers)

     
  
 

T REFERENCE |”
| NUMBERS |

 

 

fit of Private Certifier:Qntional fomet :
jegadas the prlvale certifies for the building work referred to in this application \

 

 

Signature:

 

Page 4

21/12/2907 18:24
NO.499 pa1i8

CURRENT TITLE SEARCH
. NATURAL RESOURCES AND WATER, QUEENSLAND
Request No: 2844540 :
Search Date: 21/12/2007 09:10 Title Reference: 13172073
. Date Created: 30/01/1959

Previous Title: 12544174
- REGISTERED OWNER

KEITH DESMOND ALFRED BRACKEN
VALDA MAY BRACKEN JOINT TENANTS

ESTATE AND LAND

@ Estate in Fee Simple
Lor 1 REGISTERED PLAN 69868 .
County of MARCH Parish of WEYBA

Local: Government: NOOSA SHIRE
‘BASEMENTS, ENCUMBRANCES AND INTERESTS

1. Rights and interests reserved to the Crown by
Deed of Grant No. 10985104 (ALLOT S SUBN SEC C)

2. MORTGAGE No 601792470 (G663976) 08/03/1982.
TO COMMONWEALTH SAVINGS BANK OF AUSTRALIA

ADMINISTRATIVE ADVICES - NIL
UNREGISTERED DEALINGS - NIL
CERTIFICATE OF TITLE ISSUED - Yes Certificate No. 1
Caution - Charges do not necessarily appear in order of priority
** End of Current Title Search **

COPYRIGHT THE STATE OF QUEENSLAND (NATURAL RESOURCES AND WATER) {2007]
Requested By: SMIS .

Page 1/1

21/12 2007 FRI 10:20 [TX/RX NO 5054] 010

Page 5

INTEGRATED PLANNING ACT 1997 Part E, Version 2.1, 18 June 2007

     

Form 1 Development Application

 

‘Operational &/or building work

assessable against a local government's planning scheme

 

Completion of all question on Part E is mandatory for ail applications involving the assessment of operational work and/or building work assessable
against a local government's planning scheme (including detailed engineering plans and other plans, detailed engineering plans for subdivisional works and conceptual
design plans for engineering & building work when the application does not involve assessment of a material change of use of premises at the same time).

 

 

Nature of the works 1. The application is seeking approval of (tick one (1) or both if applicable):

The types of work that are assessable against C Building work assessable against a planning scheme - provide details of the aspects of building
a planning scheme are determined by the work (@.9. building height greater than 8.5m; building work on high landslip risk area)

scheme for a particular local govemment and

will vary across the State. [

To determine the types of work that are I Operational work assessable against a planning scheme - provide details of the nature of the

assessable under a particular planning

operational work (e.9. roadworks; landscaping; drainage works; stormwater, water infrastructure; sewerage
scheme, contact the relevant local pe (eo png 39 "9

infrastructure; earthworks; clearing vegetation; signage)

 

 

 

 

goverment. > - 7 TT: 7
The infomation in Q2 is necessary for pannscaping. Sediment & Erosion Control, Frontage, Stormwater, Filling, Car Parking &
statistical and planning purposes. CCESS
2. Is the application for operational work involving the creation of new lots?
No (11 YES - specify number of new lots to be created below
3. Does the proposal involve the construction of a canal that is associated with reconfiguring a lot?
&no YES
Nature of the application 4. This application is for: (tick one (1) or both if applicable)
A development permit authorises (2 Preliminary approval - provide details of the type of work eg. roadwork, stormwater, water and sewerage

development to occur, while a preliminary

a fi infrastructure, etc
approval is a step in the approval process |

and does not authorise development to occur.

4

[K] Development permit - provide details of the type of work eg. roadwork, stormwater, water and sewerage
infrastructure, etc

Landscaping, Sediment & Erosion Control, Frontage, Stormwater drainage, Filling, Car
Parking & Access

 

 

5. Are the works subsequent to a previous development permit or preliminary approval?
OONo (X] YES - provide details of all previous approvals
List of approval reference/s Date approved Date approval lapses

APPEAL NO. MD 2470F 24] 31/03 / 2006 21 1031210

Portable Long Service Leave levy (f {6. Is payment of a Portable Long Service Leave (PLSL) levy applicable to the proposal?

 

 

 

 

 

 

 

applicable) | [X] YES - complete Q7
Prior to issuing a development permit for the
works, the assessment manager is required LINO - a7, 8&9 do not apply

by law to “sight” an approved form, issued by .
Qleave, which signifies that the PLSLlevy |7. Has the PLSL levy been paid?

has been paid. - YES - complete 08
For further information refer to
htto ww. gleave.qid.gov.au Xl NO - the applicable levy must be paid before a development permit can be given for the works

8. How much was paid?

|

9, Whatis the receipt number of the payment?

L |

 

 

 

 

Page 6

INTEGRATED PLANNING ACT 1997 Part E, Version 2.1, 18 June 2007
PLEASE NOTE

This application cannot be accepted unless accompanied by Part A of Form 1
The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information
requested by Part A and any other relevant part of Form 1

 

OFFIC E USE ON LY (applicable to assessment manager)

REFERENCE
DATE RECEIVED NUMBERIS
(i) Is a PLSL levy applicable in this instance? CUNO KK] YES - complete ayii

(ii) Has the approved form (issued by QLeave and which signifies that the PLSL levy has been paid) been sighted by the assessment
manager / private certifier at the time of lodgement of this application?

—X} NO C1 YES - provide receipt detaits

 

Page 7

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 April 2007

Form 1 Development Application

IDAS Assessment

 

Checklist

(Formerly the “Referrals Checklist”)

 

IMPORTANT NOTE FOR ALL APPLICANTS:
4 This checklist was formerly referred to as the “Referrals Checklist’. Some of the ‘Guides’ to using the IDAS Application Forms continue to refer to this document as the
“Referrals Checklist’. The name of this checklist was changed from 25 July 2005 to more accurately describe its function.

2. Under the IPA and IDAS framework, an application may require assessment by the local Council and/or certain Queensland State entities (e.9. Environmental Protection
Agency, Dept. of Natural Resources and Water, Queensland Heritage Council etc.)

3. This checklist is provided to assist applicants to determine when an application requires assessment by a Queensland State entity and may also assist the applicant to

determine the assessment manager’ for the application.

Therefore, the completion of all questions in section 1 of this checklist is mandatory for all applications (other than those requiring the completion of Parts A & B only}.

Itis the responsibility of the applicant to accuratety complete this checklist.

Section 2 is mandatory only if the proposed development is located in any part of a wild river area declared under the Wild Rivers Act 2005.

Depending on the nature of the application, an applicable State entity may be either the assessment manager or an IDAS referral agency for the application.

The assessment manager for the application will rely on the information provided in this checklist (as well as any material lodged in support of the application) to identify

any applicable referral agencies for the application in the Acknowledgement Notice. The assessment manager will also rely on this information when identifying if the

application triggers referral coordination?.

9.  Toassist you in answering the following questions a series of guides are available free from the IPA website www.ipa.qid.gov.au. Guide 25 explains the role of the IDAS
Assessment Checklist in the IDAS application process, and its relationship to the Form 1 development application.

10. Any other parts of Form 1 that this checklist requires to be completed are available from the Council or the applicable State entity, or can be downloaded free from
www.ipa.qid.gov.au.

11. Section 3 provides advice about the referrals that can be required for applications for building work assessable against the Building Regulation 2006.

CN DOS

 

 

SECTION 1 - STATE ASSESSMENT (completion mandatory)

Note: The following state assessment triggers apply to development other than for building work assessable against the Building Regulation 2006.

 

Environmentally relevant activity 1. The application involves: (tick applicable box/es)

For more information refer to Guide 4. C1 (i) an environmentally relevant activity (ERA) for which a code for environmental compliance
Unless you answered “none of the above" to Q1, has not been made - complete Part G of Form 1

the application requires assessment by the oe rare : . .

administering authority. CJ (ii) a mobile or temporary ERA for which a code of environmental compliance has not been
tf an entity, other than the administering Made - complete Part G of Form 1

authority, is the assessment manager for the X (iii) none of the above

application, the administering authority is a
concurrence agency for the application in retation
to this matter.

Note: An application involving ERA 19 and/or 20
will also require completion of Part Kr of Form 1
for approval where an allocation under the Water
Act 2000 is required.

 

 

Continued overleaf

 

PLEASE NOTE: The assessment manager may refuse to accept an application, which, at the time of lodgement, fails to provide the
completed IDAS Assessment Checklist {if applicable).

 

OFFICE USE ONLY (applicable to assessment manager}
DATE RECEIVED REFERENCE NUMBER/S

1 The assessment manager is responsible for assessing and deciding an [DAS application. The assessment manager for an application is prescribed in schedule 8A of the |PA.
2. For additional information refer 10 Guide 6 ‘Does my application trigger the referral coordination process?”
3. The ‘administering authority’ may be either the Environmental Protection Agency, the relevant local government (for a devolved ERA) or the Queensland Department of Primary Industries and
Fisheries (for a delegated ERA)
Page 1

Page 8

INTEGRATED PLANNING ACT 1997

IDAS Assessment Checklist, Version 20, 2 April 2007

 

 

 

 

State-controlied road matters 2. The application involves: (tick applicable box/es)
For more information refer to Guide 3 (1) development on land contiguous’ to a State controlled road and for -
Unless you answered “none of the above” to Q2, . . .
the application triggers referral to the Department LO (a) material change of use assessable against the planning scheme;
of Main Roads (OMR) as areferal agency. — (J (b) reconfiguring a tot unless -
In certain circumstances DMR will be an advice : . .
agency, while in other circumstances DMR wil « the total number of lots is not increased; and
be a concurrence agency. « the total number of lots abutting the State-controlled road is not increased;
Schedule 2 of the (F Reaulaton wil assist you to Ow) operational work (not associated with a material change of use assessable against he
concurrence agency for the application planning scheme or reconfiguring a lot mentioned in (b) above)~
* associated with access to a State-controlled road; or
¢ for filling or excavation; or
« involving the redirection or intensification of site stormwater from the land, through a
pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a
State-controlled road.
LD (i) development on land not contiguous to a State-controlled road and -
UO (a) material change of use -
« assessable against the local government's planning scheme; and
« mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule;
(1 (b) reconfiguring a lot for a purpose mentioned in schedule 5 of the IP regulation
and exceeding the thresholds set by that schedule;
( (c) operational work (not associated with a material change of use assessable against the
planning scheme or reconfiguring a lot mentioned in (b) above)—
« assessable against the local government's planning scheme; and
« mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule.
[1 (iii) none of the above
Clearing vegetation 3. The application involves: (tick applicable box/es)
For more information refer to Guide 12. Oo (i) material change of use -
“ f the above” to Q3, . .
the cpploaten renunes sscesement the Q (a) assessable against the planning scheme;
en ral R (b) on alot containing -
fan agency other than NRW is the assessment * acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or
manager for the application, NRW is a / « if there is no property map of assessable vegetation for the lot - remnant vegetation;
Gonourrence agency fr the application in elon (c) where the existing use of the land is a rural or environmental use; and
H you ticked Q3(i) or (ii), your application requires (d) where the size of the land is 2 hectares or larger - complete Part J of Form 1
feferral to NRW for assessment regardless of OC (ii) reconfiguring a lot -
whether vegetation clearing is proposed or not. i
(a} ona lot containing a category 1, 2 or 3 area shown on a property map of
assessable vegetation or, if there is no property map of assessable vegetation for
the lot, remnant vegetation;
(b) where the size of the lot before the reconfiguration is 2 hectares or larger;
{c) where 2 or more lots are created; and
{d) where the size of any lot created is 25 hectares or smaller - complete Part J of Form 1
Ci) operational work -
{a) for the clearing of native vegetation where the vegetation clearing is made
assessable under Schedule 8 of the IPA; and
(b) not associated with a material change of use assessable against the planning
scheme mentioned in (i) or reconfiguring a lot mentioned in (ii) - complete Part J of
Form 1
El (iv) none of the above.
Strategic port land 4. The application involves:

For more information refer to Guide 11.

Hf you ticked (i) - the relevant Port Authority is the
assessment manager for the application.

If you ticked (ii) Queensland Transport is a
concurtence agency for the application.

 

(1 (i) development on strategic port land as defined in the Transport Infrastructure Act 1994 (Tl
Act) - complete Part | of Form 1

CO (ii) a material change of use that is inconsistent with the land use plan approved under the
TI Act for the strategic port land - complete Part | of Form 1

(iii) none of the above

 

4 Land contiguous to a State-controlled road is defined in schedule 14 of the IP Regulation to mean land - if part of the land is within 100m of the State-controlled road; or that is part of a future State-

controlled road.

Page 2

Page 9

INTEGRATED PLANNING ACT 1997

Acid sulfate soils

For more information refer to Guide 10.

Unless you answered “none of the above” to Q5,
the application requires assessment by
Cepartment of Natural Resources and Water
(NRW).

If an agency other than NRW is the assessment
manager for the application, NRW is an advice
agency for the application in relation to this
matter.

IDAS Assessment Checklist, Version 20, 2 Aprit 2007
The application involves development on land situated in an identified’ local government area
and where the surface of the land is: (tick applicable box)
(1 (i) below 20m AHD® and the development will involve the excavation of 1000m3 or more of
soil or sediment at or below 5m AHD, or

O (ii) at or below 5m AHD and the development will involve filling the site with 1000m3 or more
of material

XI (iii) none of the above

 

 

Major hazard facilities or possible
major hazard facilities

For more information refer to Guide 17

If you answered "YES" to Q6, the application
requires assessment by the Department of
Emergency Services (DES).

Hf an agency other than DES is the assessment
manager for the application, DES is a
concurrence agency for the application in
felation to this matter.

Does the application involve a material change of use for a major hazard facility or possible
major hazard facility as defined under the Dangerous Goods Safety Management Act 2001?

INO
(17 YES - complete Part L of Form 1

 

 

Water related development under the
Water Act 2000

For more information about items (a) ~ (f), refer
to Guide 15. For more information about item
(g), refer to Guide 14 Does my application
involve assessment of a referable dam?

Unless you answered “none of the above” to Q7,
the application requires assessment by the
Department of Natural Resources and Water
(NRW).

If an agency other than NRW is the assessment
manager for the application, NRW is a
concurrence agency for the application in
elation to this matter.

 

The application involves:
C1 (i) operational work, for taking or interfering with water under the Water Act 2000, that is:
{tick applicable box/es)
oO (a) in a watercourse, lake or spring, (eg. e pump, gravity diversion, stream re-direction, weir or
dam) - complete Part Kz, K2, K., Ke, or Ky of Form 1 whichever is applicable;
CJ (b) for an artesian bore anywhere in the State, no matter what the use - complete Part
K, of Form 1,
(1 (c) for a subartesian bore, in declared subartesian area’, or in a certain area covered
by a water resource plan, for use for purposes other than stock and/or domestic
use - complete Part K; of Form 1;
(1 (@) for a subartesian bore, in certain declared subartesian areas, for use for stock
and/or domestic purposes - complete Part Ks of Form 1;
(J (e) for taking overland flow water in certain areas covered by a water resource plan
- complete Part Ks of Form 1;
C2 (f) for interfering with overland flow water in a drainage and embankment area -
complete Part Kioof Form 1
( (g) for constructing a referable dam® or works that will increase the storage capacity
of a referable dam by more than 10% - complete Part Ks of Form 1; of

1 (ii) none of the above.

 

Removal of quarry material from a
watercourse

For more information refer to Guide 16.

If you answered "YES" to Q8, the application
requires assessment by the Department of
Natural Resources and Water (NRW).

Hf an agency other than NRW is the assessment
manager for the application, NRW is a
concurrence agency for the application in
felation to this matter.

Note: Part G of Form 1 is required to be
completed as the activity of removing quarry
material from a watercourse is also an
Environmentally Relevant Activity (ERA).

 

Does the application involve development for the removal of quarry material from a watercourse?
requiring an allocation notice under the Water Act 2000?

No

(C1 YES - complete Parts K; and G of Form 1

 

5 The identified local government areas are: Aurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Burnett, Caboolture, Caims, Calliope, Caloundra, Cardwell, Carpentaria, Cook,
Cooloola, Dounglas, Fitzroy, Gladstone, Gold Coast, Hervey Bay. Hinchinbrooke. Isis. Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough. Mirium Vale, Momington, Noosa, Pine Rivers,
Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday.

Australian Height Daturn {AHD)

Referable dam is defined under the Water Act 2000.
Watercourse is defined in sch 10 of the IPA.

Cones

The declared ground water areas are listed in Guide 13 Development in a declared catchment area.

Page 3

Page 10

INTEGRATED PLANNING ACT 1997
Operationat work that is tidal work or
work in coastal management district
For more information refer to Guide 18. For
Tore information about prescribed tidal work in
local goverment tidal areas refer to Guide 24.
Uniess you answered “none of the above” to Q9,
the application requires assessment by the
Environmental Protection Agency (EPA).

If an agency other than EPA is the assessment
manager for the application, EPA is a
concurrence agency for the application in
relation to this matter.

Local goverment is the assessment manager
for all prescribed tidal work.

 

9.

IDAS Assessment Checklist, Version 20, 2 April 2007

The application involves operational work that is: (tick the applicable box/es)

Of

Di)
Diy

Xi

tidal work" as defined under the Coasta/ Protection and Management Act 1995 (the
Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; or

tidal work that is prescribed tidal work" other than in a canal'2 -complete Part P of Form 1; or

carried out within a coastal management district under the Coastal Act and for - complete
Part M of Form 1 if any boxes (a) to (i) below are ticked.

C1 (a) constructing or installing works in a watercourse between MHWS and HAT (ie.
other than those works in tidal water) where the development has been determined not
to be assessable against the Water Act 2000 ;

constructing a canal'? intended to be connected to tidal waters;

constructing an artificial waterway;

reclaiming land under tidal water;

disposing of dredge spoil or other solid waste material in tidal water;
interfering with quarry material on State coastal land above high-water mark;

draining or allowing drainage or flow of water or other matter across State
coastal land above high-water mark;

removing or interfering with coastal dunes on land, other than State coastal land,
that is in an erosion prone area and above high-water mark;

constructing a bank or bund wall to establish a ponded pasture on land, other
than State coastal land, above high-water mark; or

none of the above.

CL) (b)
Ce)
C1] (4)
Oe)
OW
Og)

CZ (h)
Oi

 

 

Operational work below high water
mark
For more information refer to Guide 18. For
more information about prescribed tidal work in
local government tidal areas refer to Guide 24.
Unless you answered ‘none of the above" to
Q10, the application triggers referral to
lueensiand Transport (QT) (Maritime Saf
Qld) as a concurrence agency.
Local government is the assessment manager
for all prescribed tidal work.

10. The application involves operational work that is: ( tick the applicable box/es)

Oi
Diii

tidal work"? as defined under the Coastal Protection and Management Act 1995 (the
Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; or

tidal work that is prescribed tidal work'4 - complete Part P of Form 1; OF

CL (ii) carried out within a coastal management district'S under the Coastal Act and for -

Xv)

Hea)

disposing of dredge spoil or other solid waste material in tidal water - complete Part
M of Form 1,

reclaiming land under tidal water - complete Part M of Form 1; OF

C1 (b)
C1 (c) constructing a canal’2, if the canal is associated with reconfiguring a lot - complete
Part M of Form 1;

none of the above.

 

 

Coastal management

For more information refer to Guide 18.

Unless you answered “none of the above" to
Q11, the application requires assessment by the
Environmental Protection Agency (EPA).

If an agency other than EPA is the assessment
manager for the application, EPA is a

concurrence agency for the application in
relation to this matter.

 

1.

The application involves: (tick the applicable box/es)

C1 til
C1 (iv)
I)

a material change of use assessable under a planning scheme involving operational
work carried out completely or partly in a coastal management district'®

a material change of use assessable under a planning scheme involving building
work, carried out completely or partly in a coastal management district that is -

« the construction of a new premises with a GFA'® of at least 1000m?
« the enlargement of the GFA of existing premises by more than 1000m2

reconfiguring a lot assessable under schedule 8 of the IPA where the land is situated
completely or partly in a coastal management district

reconfiguring a lot'’ assessable under schedule 8 of the IPA and in connection with
the construction of a canal'? - complete Part M of Form 1

none of the above

 

10 Tidal work is defined in sch 10 of the IPA.

11 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a local government tidal area.
12 Canali means canal as defined under the Coastal Protection and Management Act 1995

13 Tidal work is defined in sch 10 of the IPA.

14 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a local government tidal area.

15 Coastal management district is defined in sch 10 of the IPA and means a coastal management district under the Coastal Protection and Management Act 1995, other than an area declared as a
coastal management district under section 47(2) of that Act.

16 GFA is defined in sch 14 of the [PA to mean the gross floor area. For a definition of how to calculated GFA, go to the planning scheme against which the application is being assessed.

147 Under $117 of the Coastal Protection and Management Act 1995, an application for reconfiguration, where the reconfiguration is associated with the construction of an artificial waterway, must be
accompanied by the application for the operational works to construct the artificial waterway.

Page 4

Page 11

INTEGRATED PLANNING ACT 1997
Development within the limits of a
port

For more information refer to Guide 18. For

information about prescribed tidal work refer to

Guide 24

Ifyou answered “YES” to Q12, the application

triggers referral to the Port Authority.

The Port Authority is a concurrence agency if the

development is —

* within 200m of a shipping channel or an entry
and exit shipping corridor for the port

¢ within 1000m of a swing basin, a commercial
shipping wharf, a mooring, anchorage or spoil
grounds;

* within 1000m of a pianned port facility
identified in a land use plan approved under
the Transport infrastructure Act 1994

In all other situation the Port Authority is an

advice agency.

IDAS Assessment Checklist, Version 20, 2 April 2007
12. Does the application involve development below high water mark'® and within the limits of a port
under the Transport Infrastructure Act 1994?

XJ No

(11 YES - complete Part M of Form 1, or Part P of Form 1 if the work is prescribed tidal work

 

 

Marinas

For more information refer to Guide 18. For
information about whether a marina is prescribed
tidal work refer to Guide 24. The local
govemment is the assessment manager for all
prescribed tidal work

Ifyou answered “YES to Q13, the application
triggers referral to Queensland Fire and Rescue

Service as an advice agency.

13. Does the application involve operational work that is tidal work for a marina’ with more than 6
vessel berths?

No

(71 YES - complete Part M of Form 1, or Part P of Form 1 if the tidal work is prescribed tidal work

 

 

 

Tidal works in strategic port land tidal
areas

For more information refer to Guide 18.

Unless you answered “NO” to 014, the relevant

Port Authonity is the assessment manager for the
application and the Environmental Protection

Agency (EPA) and Queensland Transport (QT)
are concurrence agencies for the application.

=

4. Does the application involve tidal works within a strategic port land tidal area20?

KINO

(YES - complete Part M of Form 1

 

Heritage
For further information refer to Guide 19
If you answered “YES” to Q15, the application

triggers referral to the Queensland Heritage
Council as concurrence agency for the
application.

 

Unless you answered “none of the above” to
Q15(b), the application involves referral to the
Environmental Protection Agency as an advice
agency for the application

15. Does the application involve development in a heritage registered place as defined under the
Queensland Heritage Act 1992?

No

(71 YES - complete Part C of Form 1

15(b)The application involves: (tick applicable boxes)
(i) amaterial change of use assessable against the planning scheme and the lot shares a
common boundary with a protected area or registered place under the Queensland
Heritage Act 1992;
D1 (ii) reconfiguring a lot if the lot shares a common boundary with a protected area or
registered place under the Queensland Heritage Act 1992;
XX (ii) none of the above.

 

Declared catchment areas

For more information, including a list of the
declared catchment areas within Queensland,
Tefer to Guide 13.

Unless you answered “none of the above" to
Q16, the application requires assessment by the
Department of Natural Resources and Water
(NRW)

If an agency other than NRW is the assessment
manager for the application, NRW is a
concurrence agency for the application in
Telation to this matter.

 

16. The application is in an area declared to be a catchment area under the Water Act 2000 and
involves: (tick the applicable box/es)
CO (i) reconfiguring a lot if any lot resulting from the reconfiguration is less than 16 hectares;
LI (ii) development assessable against the planning scheme involving the establishment or

expansion of a waste water disposal system, other than a disposal system for carrying
out an environmentally relevant activity under the Environmental Protection Act 1994;

(iii) none of the above

 

18 High water mark is defined in the Coastaf Protection and Management Act 1995 and means the ordinary high water mark at spring tide.
19 Marina is defined in the Transport Operations (Maritime Pollution) Regulation 1995.
20 Strategic port land tidal areas are the areas generally 50 metres seaward of high water mark adjacent to strategic port land.

Page 5

Page 12

INTEGRATED PLANNING ACT 1997

IDAS Assessment Checklist, Version 20, 2 April 2007

 

 

Contaminated land 17. The application involves: (tick the applicable box/es)
Applications involving material change of use j i i: mi: _
and! or reconfiguring alot may bigger Bis Oi reconfiguring alot for which all of part of the premises are
referral. (a) premises mentioned in the IPA, schedule 8, part 1, table 2 -
For more information refer to Guide 5. « item 5, including the exemption otherwise provided for by paragraph (d):
Unless you answered “none of the above" to « item 6, including the exemption otherwise provided for by paragraph (e); or
Q17, the application requires assessment by the « item 7, including the exemption otherwise provided for a mining activity or petroleum
Environmental Protection Agency (EPA). tf an ctivity: or
agency other than EPA is the assessment activity; / ; ;
manager for the application, EPA will be a (b) in an area for which an area management advice has been given for unexploded
Concurrence agency for the application in ordnance - complete Part N of Form 1
relation to this matter. . .
LU (ii) a material change of use -
(a) made assessable under the IPA, schedule 8, part 1, table 2, items 5 to 7; or
(b} assessable against the planning scheme and if all or part of the premises is in an area
for which an area management advice has been given for unexploded ordnance -
complete Part N of Form 1
EX (iii) none of the above
Electricity infrastructure 18. The application involves: (tick the applicable box/es)

For more information refer to schedule 2of the IP
Regulation.

Unless you answered “none of the above" to
Q18, the application triggers referral to the

agency to which the easement is granted in
favour of as advice agency.

CI (i) reconfiguring a lot where any part of the lot is —

subject to an easement in favour of a distribution entity or transmission entity under the
Electricity Act 1994 and the easement is for a transmission grid or supply network under
that Act; or

« situated within 100m of a substation site;

a material change of use, assessable against a planning scheme and not associated

with reconfiguring a lot if -

any part of the premises is subject to an easement in favour of a distribution entity or
transmission entity under the Electricity Act 1994 and the easement is for a transmission
grid or supply network under that Act; and

* any structure or work that is the natural and ordinary consequence of the use is, or will be,
located wholly or partly in the easement;

a material change of use, assessable against a planning scheme and not associated

with reconfiguring a Jot if any part of the premises is situated within 100m of a substation

site;

LJ (iv) operational work that is filling or excavation assessable against the planning scheme,

not associated with reconfiguring a lot, if -

« any part of the premises is subject to an easement in favour of a distribution entity or
transmission entity under the Electricity Act 1994 and the work is located wholly or partly in
the easement;

e the work is located wholly or partly within 10m of a substation site;

EX] (v)_ none of the above.

Oi

0D til

 

 

Land designated for community
infrastructure

Applications involving development on land
designated for community infrastructure may
‘trigger this referral.

For more information refer to schedule 2 of the
IP Regulation.

If you answered “YES” to Q19, the application
requires assessment by the chief executive of
the department administering the Act authorising
the development for the designated purpose.
Ht an agency other than the designator is the
assessment manager for the application, the
designating agency will be a concurrence
agency for the application in relation to this
matter,

 

Does the application involve development assessable against the planning scheme and on land
designated for community infrastructure?

{i) intended to be supplied by a public sector entity; and
(ii) on land not owned by or on behalf of the State; and
(iii) other than development -

(a) for the designated purpose; or

(b) carried out by, or on behalf of, the designator.
No
CO Yes

 

 

Page 6

Page 13

INTEGRATED PLANNING ACT 1997

SEQ Regional Plan

For more information refer to schedule 2 of the
IP Regulation

Refer to Chapter 2, part 5A and schedule 10 of

the Integrated Planning Act 1997, and schedule
2 of the Regulatory Provisions for relevant
definitions.

Unless you answered “none of the above" to
Q20, the application requires assessment by the
Office of Urban Management (OUM).

IDAS Assessment Checklist, Version 20, 2 April 2007
20. The application involves (tick applicable bowes) -
LJ (i) a material change of use of premises -
(a) in a Major Development Area in the Urban Footprint for -

0 (i) anurban activity -
in an area included in a structure plan where the IPA, section 3.1.6
applies;
in an area not included in a structure plan where -
« the IPA, section 3.1.6 applies to the application for the material change

of use; or

« the premises exceeds 10,000m2; or
« the gross floor area (GFA) on the premises will exceed 10,000m2; or
« impact assessment is required under the relevant planning scheme
(CD (i) intensive animal husbandry, or

C1 (ili) residential development involving a rural residential purpose

O
O

(b) in the Regional Landscape and Rural Production Area for -
1 (i) anurban activity and not specified in section 2.4(2); or
C1 (ii) residential development involving a rural residential purpose and not
specified in section 2.6(2)
(c) in the Rural Living Area for an urban activity and not specified in section 2.8(2);

(d) in the Investigation Area for -
CJ (i) anurban activity and not specified in section 2.10(2);

C (ii) residential development involving a rural residential purpose and not
specified in section 2.12(2); or

CJ (iii) intensive animal husbandry

(1 (il) reconfiguring a lot-
On land in a Major Development Area in the Urban Footprint that is:
(a) not included in a structure plan; and

(b) not specified in section 3.1(2).
&

(iii) none of the above

 

Fisheries matters

For more information refer to schedule 2of the IP
Requlation.

Unless you answered “none of the above" to
Q21, the application requires assessment by the
Qepartment of Primary Industries and Fisheries
{DPI8F).

tf an agency other than DPI8F is the assessment
manager for the application, DPI&F is a
concurrence agency for the application in
relation to items (i) - (iv) and an advice agency
in relation to item (v).

 

21. The application involves: {tick the applicable box/es)

(J (i) an assessable material change of use for aquaculture - complete Part O; of Form 1;

OU (ii) assessable operational work that is the construction or raising of a waterway barrier -
complete Part O3 of Form 1,

C (il) assessable operational work completely or partly within a declared fish habitat area-
complete Part O2 of Form 1;

LJ (iv) assessable operational work that is the removal, destruction or damage of a marine
Plant - complete Part O2 of Form 1;

(1 (v) development assessable under the IPA, schedule 8, part 1, on land that adjoins a
declared fish habitat area;

Bd (vi) none of the above.

 

Page7

Page 14

INTEGRATED PLANNING ACT 1997
Integration of land use and public
transport

For more information refer to Guide 23, schedule
8A of the IPA, & schedule 2 of the IP Regulation.
Unless you answered “none of the above’, the
application triggers referral to QT as a
concurrence agency.

IDAS Assessment Checklist, Version 20, 2 April 2007

22. The application involves: (tick the applicable box/es)—

CJ (i) a material change of use assessable against the planning scheme for a purpose
mentioned in schedule 13C of the IP Regulation and exceeding the thresholds set by that
schedule.

D (ii) reconfiguring a fot—

(1) (a) on land that is completely or partly within a public transport corridor, and the
total number of lots increases;

(J (b) on land that is completely or partly within a future public transport corridor or
an airport's public safety area;

C1 (c} on land that is within 400m of a public passenger transport facility or a future
public passenger transport facility, and the total site area is 5000m? or greater;

(J (d) _ for a residential purpose within the 25 ANEF contour for an airport;

Cl (e) _ for a residential purpose resulting in 100 or more allotments.

CO (iii) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, on land that—

CJ (a) __ is completely or partly within a public transport corridor or a future public
transport corridor;
(1 (b) will result in work that encroaches into an airport's operational airspace.

{X (iv) none of the above.

 

 

 

Railway safety and efficiency 23. The application involves: (tick the applicable box/es}—
For more information refer to Guide 23, schedule i) a material change of use assessable against the planning scheme for a purpose
Ba of te A & Schedule of te P Requiation wiaton, Oe Mentioned in schedule 13D of the IP Regulation and exceeding the thresholds set by that
Unless you answered “none of the above’, the
application triggers referral to QT as a schedule.
concurrence agency. LD (ii) reconfiguring a tot—
(1 (a) on land that is completely or partly within a future public transport corridor,
future railway land or a railway tunnel easement;
[J (b) on land that is within 400m of a Citytrain passenger railway station or a future
Citytrain passenger railway station, and the total site area is 5000m? or
greater;
(1 (c) _ onland that abuts rail corridor land, commercial corridor land or future railway
land, and the total number of lots increases;
(1 @)__ onland that abuts rail corridor land, commercial corridor land or future railway
land and an easement abutting the corridor or future railway land is created;
(Je) _ on land that is completely or partly within 100m of, and abutting an approach
to, a railway level crossing, and the total number of lots increases;
(C(f) for a residential purpose resulting in 100 or more allotments.
U1 (ii) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, involving extracting, excavating or filling greater than 50m%, on land that—
(1 (a) _ is completely or partly within rail corridor land or commercial corridor land, and
the work is not for rail transport infrastructure or other rail infrastructure;
(J (b) is completely or partly within future railway land, or a railway tunnel easement;
(1 (c) abuts rail corridor land, commercial corridor tand or future railway land, and
the work is within 25m of the railway boundary.
| (iv) none of the above.
Moonie to Brisbane pipeline 24. The application involves the easement for the construction or operation of the Moonie to

For more information refer to schedule 2of the IP
Regulation

Unless you answered “none of the above", the
application triggers referral to the holder of
pipeline licence No 1 issued under the Petroleum
Act 1923, currently Santos QNT Pty Ltd, for
advice.

 

Brisbane strategic pipeline, and involves: {tick the applicable box/es)—

CJ (i) a material change of use assessable against the planning scheme and not associated
with reconfiguring a lot, and any structure or work will be located wholly or partly in the
easement.

L (ii) reconfiguring a lot

CO (iii) operational work assessable against the planning scheme, that is filling, excavation,
compaction, drilling, boring or piling not associated with a reconfiguring a lot, and the
work is located wholly or partly in the easement.

EX (iv) none of the above.

 

Page 8

Page 15

INTEGRATED PLANNING ACT 1997

IDAS Assessment Checklist, Version 20, 2 Aprit 2007

 

 

 

 

 

 

Koala habitat area 25. The application involves: (tick the applicable box/es)—
sshovtle Dole ® Renabton (i) a material change of use of premises in a koala conservation area or koala
Unless you answered “none of the above", the sustainability area made assessable under a planning scheme, that is not for a domestic
application requires referral to the Environmental activity and will result in —
Protection Agency as a concurrence agency {J (a) clearing of native vegetation over an area greater than 2500m?;
(J (b) anew building and any reasonably associated structure with a total footprint
greater than 1000m2;
(1 (c) an extension to an existing building and any reasonably associated structure if
the extension has a total footprint greater than 1000m?;
(1 (d) extracting gravel, rock or sand from an area greater than 5000m2;
UC (e) excavating or filling an area greater than 5000m2;
(0 (f) additional traffic in a koala conservation area or koala sustainability area,
between 6p.m. on a day and 6a.m. on the following day.

D (ii) reconfiguring a fot in a koala conservation area or koala sustainability area that will

result in —
(J (a) an increased number of lots;
(1 (b) clearing of native vegetation over an area greater than 2500m?,

CO (iii) operational work in a koala conservation area or koala sustainability area made
assessable under Schedule 8, Part 1, Table 4, items 1A to 1G (not associated with
reconfiguring a lot mentioned in (ii) above) that will result in the clearing of native vegetation
over an area greater than 2500m?.

(1 (iv) operational work in a koala conservation area or koala sustainability area made
assessable under a planning scheme (not associated with a material change of use
mentioned in (i) or reconfiguring a lot mentioned in (ii) above) that is not for a domestic activity
and will result in -

(1 (a) clearing of native vegetation over an area greater than 2500m?;
(0 (b) extracting gravel, rock or sand from an area greater than 5000m2;
(1 (ec) excavating or filling an area greater than 5000m2.

LX] (v) none of the above.

Wild river area 26. Does the application involve development in a wild river area declared under the Wild Rivers Act
For more information, refer to Guide 27 2005?

If you answered YES to Q26, you must also & NO

complete section 2 of this checklist. This will

enable you to determine if your application can OOYes

proceed in a wild river area and which referral

agency will assess your application against the

Wild Rivers Code, or if the proposed

development is “prohibited” in a wild river area.

Note: Development can be ‘prohibited’ in a wild

fiver area because the application cannot be

accepted by the assessment manager.

Preliminary Approval 27. Does the application involve a development for which preliminary approval is sought under
Hf you answered YES to Q27, the application Section 3.1.6 of the integrated Planning Act 1997?

triggers referral to the Department of Local

Government, Planning, Sport and Recreation as & NO

an advice agency. O YES

Wetlands 28. The application involves: (tick the applicable boxes) -

Domestic activity means the construction or use
of a single residence on a lot and any reasonably|
associated building or structure. Examples of a
building or structure that could be reasonably
associated with a single residence include:
caretaker’s residence, granny flat, building or
structure used for a home business

Note: Wetland is defined in the Integrated
Planning Regulation 1998

Unless you answered “none of the above” to
Q28, the application involves referral to the

Environmental Protection Agency as an advice
agency for the application.

 

CO (i) —amaterial change of use, other than for a domestic activity, assessable against the
planning scheme that is in or within 100m of a wetland;
OO (ii) reconfiguring a lot -

In or within 100m of a wetland that will result in
(J (a) more than 10 lots being created; or
LJ (b) lots less than 5 hectares;

KI (iii) none of the above

 

Page 9

Page 16

INTEGRATED PLANNING ACT 1997
Conservation Estate

Urban purposes is defined in the Integrated
Planning Act 1997 as “purposes for which land is
used in cities or towns, including residential,
industial, sporting, recreation and commercial
purposes, but not including environmental,
conservation, rural, natural or wildemess area
purposes”.

Unless you answered ‘none of the above" to
29, the application involves referral to the

Environmental Protection Agency as an advice
agency for the application.

 

IDAS Assessment Checklist, Version 20, 2 April 2007
29. The application involves: (tick the applicable box/es)—
CJ (i) a material change of use for urban purposes that is in or within 100m of any of the
following —
(1 (a) a protected area, forest reserve, critical habitat or area of major interest under
the Nature Conservation Act 1992;;
(1 (b) a State forest or timber reserve under the Forestry Act 1959;
CJ (c) a marine park under the Marine Parks Act 2004;
(J (d) a recreation area under the Recreation Area Management Act 1988;
(1 (e) a world heritage area listed under the World Heritage Convention;
LJ (f) Brisbane forest park under the Brisbane Forest Park Act 1977.
C1 (ii) reconfiguring a lot if -
(J (a) any part of the lot is situated in, or within 100m of, any of the following —
CI (i) — aprotected area, forest reserve, critical habitat or area of major
interest under the Nature Conservation Act 1992;
(ii) a State forest or timber reserve under the Forestry Act 1959;
CI (iii) amarine park under the Marine Parks Act 2004;
OJ (iv) arecreation area under the Recreation Area Management Act 1988;
[1 (¥) _ aworld heritage area listed under the World Heritage Convention;
Brisbane forest park under the Brisbane Forest Park Act 1977; and
UJ (b) the reconfiguration involves more than 10 lots being created, or any lot
resulting from the reconfiguring is less than Sha;
& (ii) none of the above.

 

Page 10

Page 17

INTEGRATED PLANNING ACT 1997

IDAS Assessment Checklist, Version 20, 2 April 2007

SECTION 2 - ASSESSMENT IN A WILD RIVER AREA

(completion mandatory if the proposed development is located in a wild river area)

 

 

Wild River Area

it the responsibility of the applicant to
determine if the development is proposed in
a wild river area.

Information about wild river areas including the
geographical location and position of
management areas in relation to properties, can
be accessed by contacting the Department of
Natural Resources and Water (NRW), accessing
the department's website www.nrw.ald.qov.au or
contacting the department by email on:

wild [email protected]

Note on Referrals

Referrals for development in a wild river area
{other than for agricultural activities and animal
husbandry activities) are not changed from the
existing referral arrangements.

Notes on development assessable
against the Wild Rivers Code

For information regarding development in a wild
iver area, see the relevant wild river declaration
and Guide 27. The relevant wild river
declaration will provide information regarding
which types of development must be assessed
against the Wild Rivers Code, and in some
cases which types of development are exempt
from wild river requirements.

The notes on development assessable against
the Wild Rivers Code in this section of the
checklist provide some guidance however this
May vary between wild river areas. The relevant
declaration will provide the information applying
to each wild fiver area.

Applications for some new developments will not
be accepted if the proposed development is ina
high preservation area (HPA). Most applications
for development activities which may be made
including these in a preservation area (PA), must
be assessed against and must comply with the
Wild Rivers Code where indicated in a relevant
wild river declaration.

1. Which wild river area is the development proposed in?

 

 

 

 

The proposed development is to be located in: (tick the applicable boxes}
CO i) a high preservation area (HPA);

(J ii) a preservation area (PA) ;

(J iii) a witd river floodplain management area (FMA);

| iv) a wild river nominated waterway,

(J v) a designated urban area (DUA).

 

 

Environmentally relevant activities
(ERAs) in a designated urban area

Ifyou answered YES, your application for an
ERA is exempt from any wild river requirements
and provided there are no other aspects of this
development that require assessment against
wild fivers, you do not need to complete the
Temaining questions in Section 2.

If you answered NO to Q2, please complete the
remaining questions in Section 2.

2. Does the proposed development only involve any of the following environmentally relevant
activities (ERAs) in a designated urban area (as mapped in the relevant wild river declaration)?

i) An ERA 28 or ERA 14: or
ii) Alevel 2 ERA except ERA 1, 2, 3, 4, 20, 22 or 59.
XK] NO oO YES (ensure you have completed Part G of Form 1)

 

 

Clearing native vegetation

H YES, there are a limited number of purposes
for which an application to clear native
vegetation may be accepted in a HPA. See
Guide 27 for a list of relevant purposes for
which an application may be made in a HPA.
If YES and you ticked Q4 box i) the application
may be made and is assessable against the Wild
Rivers Code. If YES and you ticked Q4 box ii}
the application will not be accepted.

Note: If clearing native vegetation is in a PA,
there are no wild river requirements and
provided there are no other aspects of this
development where wild river requirements
apply, do not complete the remaining questions
in Section 2.

 

3. _ Is the application operational work for clearing native vegetation in a HPA?
XX] NO Z| YES (ensure you have completed Part J of Form 1)

4. If YES, is the clearing?

[J i) clearing regrowth (as defined in the Vegetation Management Act 1999) in a registered
area of agriculture in a HPA (see Guide 27); or

LJ ii) in a HPA outside a registered area of agriculture?

 

Page 11

Page 18

INTEGRATED PLANNING ACT 1997

IDAS Assessment Checklist, Version 20, 2 April 2007

 

Works in tidal areas, coastai
management districts and fish habitat
areas

tf you answered YES to Q5. and ticked any
boxes in Q6). your application is required to be
assessed against and must comply with the Wild
Rivers Code.

lf you answered YES to Q5 and ticked box i) in
Q6, your application is required to be referred to
the EPA.

Note: If specified works are proposed in a local
govemment area, it is prescribed tidal work — the
Televant focal government will be the
assessment manager with the EPA as a
concurrence agency

tf you answered YES to Q5, and ticked box ii) or
iil) in Q6, your application requires referral to
DPIF.

if you answered NO to QS and ticked box i} in
Q6, the application will not be accepted.

Ifyou answered NO to Q85, ticked box ii) in Q6
and the development is necessary to install
authorised works or infrastructure where a
development permit is not required, or if a
fequired permit is held, the application must be
assessed against and must comply with the Wild
Rivers Code. Applications for purposes other
than specified works or as described above will
Not be accepted.

Ifyou answered NO at QS and ticked box iii) in
Q6, the application may be made if the works are
in aPA. These applications must be assessed
against and must comply with the Wild Rivers
Code. The application will not be accepted if the
development is proposed to be located in a HPA.

For more information about specified works refer
to Guide 27

ls the development for specified works? (see definition in the Wild Rivers Act 2005 and Guide 27-
Development in a wild river area)

EX] No Clves

The application is for one or more of the following:

C i) Operational works that is tidal works or works in a coastal management district (ensure you
have completed Part M and/or Part P of Form 1); OF

J ii) Operational works for the removal, destruction or damage of marine plants (ensure you have
completed Part Q2 of Form 1), or

oO iii) Building or operational works in a fish habitat area (ensure you have completed Part O: of Form 1).

 

 

 

 

 

 

Residential, commercial or industrial |7. Is the application for residential, commercial or industrial development in a designated urban
development area?
\fyou answered YES to Q7, your application is
not subject to wild river requirements. Provided xl NO | YES
there are no other aspects of this development
that require assessment against the relevant wild| 8 |f NO, does the application for residential, commercial or industrial development involve:
ter dectaration or Wild Rivers Code, you do not ; | .
need to complete the remaining questions in O i) a material change of use made assessable in a local government planning scheme

. ensure you have completed Part D of Form 1); or
Section 2 you h leted Part D of Form 1
'fyou answered NO to Q7 and ticked either box os . . . .
i) or ii) in Q8, the assessing agency is the i ii) operational works associated with reconfiguring a lot (ensure you have completed Part F
relevant local government. The application must of Form 1),
be assessed against and must comply with the
Wild Rivers Code.
Animal husbandry activities 9, Does the application involve a material change of use for animal husbandry activities (as defined
Ifyou answered YES to Q9 your application under the Wild Rivers Act 2005) in a PA?
requires assessment against and must comply
with the Wild Rivers Code. & NO O YES (ensure you have completed Part R of Form 1)
The assessing agency is NRW.
Note: Applications for animal husbandry
activities will not be accepted if proposed in a
HPA, For more details and a definition of animal
husbandry activities see the Wiki Rivers Act
2005 and refer to Guide 27.
Agricultural activities 10. Does the application involve agricultural activities (as defined under the Wild Rivers Act 2005) in
tfyou answered YES to Q10, your application a PA?
fequires assessment against and must com
wih the Wild Rivers Cole. vy &X) NO O YES (ensure you have completed Part Q of Form 1)
The assessing agency is NRW.

11. If YES is the application for:

Note: Applications for agricultural activities will
Not be accepted if proposed ina HPA. For more
details and a definition of agricultural activities
see the Wiki Rivers Act 2005 and refer to Guide
27.

The production of fodder in a PA, and pasture
improvement using low impact soil disturbance
techniques is not an agricultural activity as
defined under the Wild Rivers Act 2005. For
More information see Guide 27.

 

(J i) a material change of use; or
(J ii) operationat works.

 

Page 12

Page 19

INTEGRATED PLANNING ACT 1997

IDAS Assessment Checklist, Version 20, 2 April 2007

 

Works that take overland flow water

The relevant wild river declaration will state
works that take overland flow water are either
self assessable or assessable, or are exempt
from wild river requirements.

Hf you ticked 013 i), your application must be
assessed by NRW against the Wild Rivers Code
and must comply with the code.

If you ticked Q13 ii) an application is not required
to be made however the works must comply with
the relevant setf-assessable section of the Wild
Rivers Code, otherwise the works become
assessable development for which an application
is required and must be assessed by NRW
against the relevant part of the Wild Rivers Code
and must comply with the code.

If you ticked Q13 iii} your application is not
subject to wild river requirements.

Applications for development that is other than

that stated to be assessable, self-assessable or
exempt will not be accepted.

13,

Does the application involve works that take overland flow water in a HPA or an FMA?

XX] No

If YES, is the application for works stated in the relevant wild river declaration to be?
(J i) assessable works

LJ ii) self-assessable works

(J iii) exempt works

O YES (ensure you have completed Part Ke of Form 1)

 

 

Works that interfere with overland
flow water

The relevant wild river declaration will state
works that interfere with overland flow water that
are either self assessable, assessable or exempt
from wild river requirements.

If you ticked Q15 i), your application must be
assessed by NRW against the Wild Rivers Code
and must comply with the code.

Ht you ticked Q15 ii) an application is not required
to be made however the works must comply with
the relevant self-assessable section of the Wild
Rivers Code, otherwise the works become
assessable development for which an application
is required and must be assessed by NRW
against the relevant part of the Wild Rivers Code
and must comply with the code.

Ifyou ticked 15 iii) your application is not
Subject to wild river requirements.

Applications for development that is other than
that stated to be assessable, self-assessable or
exempt will not be accepted.

5.

Does the application involve works that interfere with overland flow water in a FMA?

&J No

If YES, is the application for works stated in the relevant wild rivers declaration to be?
(J i) assessable works

a ii) self-assessable works

(J iii) exempt works

oO YES (ensure you have completed Part K1o of Form 1)

 

 

Waterway barrier works

Applications for building or raising waterway
barrier works in a HPA will not be accepted.
If you answered YES to Q16, your application
must be assessed by DPIF against the Wild
Rivers Code and must comply with the code.

16.

Does the application involve building or raising waterway barrier works in a PA?
X NO O YES (ensure you have completed Part O3 of Form 1)

 

 

Aquaculture (non ERA)

Applications for aquaculture in a HPA will not be
accepted.

tf you answered YES to Q17, your application

must be assessed by DPIF against the Wild
Rivers Code and must comply with the code.

Does the application involve aquaculture in a PA?

ine)

[1 YES (ensure you have completed Part O: of Form 1)

 

 

Works that interfere with water in a
watercourse

Note: If the development is proposed in a HPA.
applications for ail works that interfere with water
in a watercourse (including dams or weirs,
stream realignment or stream diversion) will not
be accepted.

In a PA, applications for instream dams and
weirs may be accepted in nominated waterways.
If you ticked box ii) in Q19, your application will
not be accepted.

Note: Operational works outside a HPA or
nominated waterway are not subject to wild
river requirements.

More information and locations of nominated
waterways is available by contact NRW,
accessing the department's website
www.nnw.gid.gov.au or contacting the
department by email on:

wild [email protected] the application involve operational works that interfere with water in a watercourse that is in
a nominated waterway in a PA?

XX NO LlyYes (ensure you have completed the relevant Part K of Form 1)

If YES,
O i) The application is for an instream dam or weir; or

O ii) The application is for operational works that interfere with water in a watercourse, and is
for development other than a dam or weir,

 

Page 13

Page 20

INTEGRATED PLANNING ACT 1997
Environmentally relevant activities

Most applications for an ERA in a HPA will not
be accepted. Applications which may be made
Tequire referral to the EPA. The assessment of
some ERAs is assessed by NRW, others have
been devolved to DPIF, NRW or delegated
local goverment (see EPA website for more
information on devolved ERAs)

If you answered NO to Q20 you do not need to
complete Qs 21-24.

H you answered YES to Q20 and the
development is in a PA, your application must be
assessed by the administering authority?!
against the Wild Rivers Code and must comply
with the code, uniess the proposal is for
development where an application will not be
accepted, or is exempt from wild river
fequirements (see Q2). You will be able to
determine if an application will not be accepted
for the development by answering Q21 - Q24.

ff you answered NO to Q21, you do not need to
complete Q22. Ifyou answered YES to Q21 you
are required to complete Q22.

If you answered NO to Q22, the application will
not be accepted. ff you answered YES to Q22,
the application must be assessed by NRW
against the Wild Rivers Code and must comply
with the code.

tf you answered NO to Q23 and the development
is proposed in the HPA the application will not be
accepted. If you answered YES to Q23, the
application must be assessed by the EPA or
NRW (as prescribed in schedule 8A of the IPA)
against the Wild Rivers Code and must comply
with the code.

If you answered YES to Q24 the application will
Not be accepted. If you answered NO to 024.
your application must be assessed by NRW
against the Wild Rivers Code and must comply
with the code.

Exempt ERAs in a designated urban
area

If the development is proposed in a designated
urban area there may be no wild river
fequirements. See Section 2 Q2.

Note: All applications that can be accepted must
be assessed against and must comply with the
Wild Rivers Code (other than exempt ERAs in a
designated urban area).

20.

21.

22.

24.

IDAS Assessment Checklist, Version 20, 2 April 2007
Does the application involve an ERA?

& NO f YES {ensure you have completed Part G of Form1)

ls the application for an ERA 20 instream?

XI No CJ yes

Is a quarry allocation notice held for the proposed ERA 20 instream?

EJ No Dyes

Does the application involve any of the following in a HPA?
i) a level 2 ERA 11, (and is for specified works or a residential complex)
ii) an ERA 19 (dredging)

iii) Low impact ERA 20 (out of stream) for specified works or a residential complex (as defined in
the Wild Rivers Act 2005, and Environmental Protection Act 1994)

iv) an ERA 22 (out of stream)

{X] No Ll Yes

ls the proposed development for ERA 20 (out of stream) and;
— inaFMA; and

— not low impact; and
— not for a residential complex in the area, or for specified works.

Eno Clyes

 

 

Documentation

It you answered NO to 025, your application
may be subject to an information request and
processing of the application may be delayed.

 

25.

Has documentation been included with the application describing how the applicant proposes to
comply with the mandatory requirements, required outcomes, and/ or performance requirements
as set out in the relevant part/s of the Wild Rivers Code?

J No (J Yes

 

21 The administering authority may be either the EPA, or if devolved or delegated, the local goverment, DPIF or NRW.

Page 14

Page 21

INTEGRATED PLANNING ACT 1997

IDAS Assessment Checklist, Version 20, 2 April 2007

 

SECTION 3 —- BUILDING REFERRALS (completion not mandatory)

 

 

Below is a list of the referrals that can apply to an application for building work assessable against the Building Regulation 2006. This section of the IDAS
Assessment Checklist is provided for advice only. This section of the IDAS Assessment Checklist is not required to be completed and iodged with an
application for building work assessable against the Building Regulation 2006 only.

 

Special fire services - generally 1
For more information go to schedule 2 table 1 and
schedule 2A of the iP Regulation

Assessment period 15 days. No response is a
deemed refusal.

An application may trigger referral to Qld Fire and Rescue Services as an advice agency if the building work
requires special fire services mentioned in schedule 2A part 1 of the integrated Planning Regulation 1998
(IP Regulation) or includes an alternative solution assessed against the performance requirements of the
Building Code of Australia.

 

Fire safety for budget accommodation =| 2.
For more information go to schedule 2 of the IP
Requlation

An application may trigger referral to Qld Fire and Rescue Services as an advice agency if the building work
the subject of the application requires the installation of a fire safety system for a budget accommodation
building.

 

Spray painting 3.
For more information go to schedule 2 of the IP
Regulation

An application may trigger referral to the Department of Industrial Relations (DIR) as a concurrence agency
if the application involves a workplace incorporating spray painting.

 

Retail meat premises 4.
For more information go to schedule 2 of the IP
Regulation

An application may trigger referral to Safe Food Qid as a concurrence agency if the application involves a
fetail meat premises.

 

Private health facilities 5.
For more information go to schedule 2 of the IP
Regulation

An application may trigger referral to the Department of Health as a concurrence agency if the application
involves a private health facility.

 

Workplace area less than 2.3m2 6.
For more information go to schedule 2 af the IP
Regulation

An application may trigger referral to the Department of Industrial Relations (DIR) as an advice agency if the
application involves a work place area less that 2.3m2.

 

Land contiguous to a State-controlled | 7.

road
For more information go to schedule 2 of the IP
Regulation

An application may trigger referral to the Department of Main Roads as a concurrence agency or advice
agency if the application involves land contiguous to a State-controlied road.

 

Pastoral workers accommodation 8.
For more information go to schedule 2 of the IP
Regulabon

An application may trigger referral to the Department of industrial Relations (DIR) as a concurrence agency
if the application involves pastoral workers accommodation.

 

Child care centre 9.
For more information go to schedule 2 of the IP
Regulation

An application may trigger referral to the Department of Communities as a concurrence agency if the
application involves a childcare centre.

 

Coastal development 10.

For more information go to schedule 2 of the IP
Regulation

An application may trigger referral to the Environmental Protection Agency (EPA) as a concurrence agency
if the application involves land completely or partly seaward of a coastal building line?2.

 

Heritage 1.

For mare information go to schedule 2 of the IP
Regulation

An application may trigger referral to the Heritage Council as a concurrence agency if the application
involves a heritage registered place.

 

Fisheries matters 12.

For more information go to schedule 2 of the iP.
Regulation

An application may trigger referral to the Department of Primary Industries and Fisheries (DPI&F) as a
concurrence agency if the application involves assessable building work in a declared fish habitat area; or
as an advice agency if the application involves assessable building work on land that adjoins a declared fish
habitat area.

 

Integration of land use and public 13.

transport
For more information go to schedule 2 of the |P
Regulation

An application may trigger referral to Queensland Transport as a concurrence agency if the application
involves existing or future public transport corridors, or airport operational airspace”.

 

 

Railway safety and efficiency 14,

For more information go to schedule 2 of the |P
Regulation

 

An application may trigger referral to Queensland Transport as a concurrence agency if the application
involves future railway land.

 

NOTE: CONCURRENCE AGENCY ASSESSMENT PERIODS

 

The locai government, as the concurrence agency, is required to assess and provide a response for the following building applications within a prescribed
time. For applications relating to design and siting (17, 18 & 19), and building work for removal or rebuilding (23), the assessment period is 5 days. For alt
other applications the assessment period is 15 days. If no response is received from the local government for an application, it is taken to be a deemed
refusal. However for amenity and aesthetics impact of particular building work for a single detached class 1a or class 10 building or structure (15), no
response is taken to be a deemed approval.

 

 

Amenity and aesthetic impact of 15. An application will trigger a referral to the local government if it is :

particular building work for single e for a single detached class 1 building or class 10 structure; and

detached class 1 building or class 10 e the local government has declared by resolution the following:

building or structure - the appearance of the building or structure will have an extremely adverse impact on the amenity of
For more information go to schedule 2 table 1 of the the locality; and

 

IP Regulation. — the appearance of the building or structure would be in extreme conflict with the character of the
Assessment period 15 days. No response is a locality
deemed approval

 

2 Coastal building lines are prescribed under the Coastal Protection and Management Act 1996.
73 Operational airspace is as defined in State Planning Policy 1/02 “Development in the Vicinity of Certain Airports and Aviation Facilities”.

Page 15

 

Page 22

INTEGRATED PLANNING ACT 1997

IDAS Assessment Checklist, Version 20, 2 April 2007

 

 

 

 

 

 

 

 

Whether particular buildings may be | 16. An application to use an existing building that is not class 1, 2, 3 or 4 for residential purposes may trigger a

occupied for residential purposes referral to the local government as the concurrence agency.

For more information go to schedule 2 table 1 of the

IP Regulation

Assessment period 15 days. No response is a

deemed refusal

Design and siting 17. An application may trigger referral to the local government as the concurrence agency if the building work

For more information go to schedule 2 table 1 of the does not comply with the performance criteria of parts 11 and 12 of the Queensland Development Code.

IP Regulation 18. An application may trigger referrat to the local government as the concurrence agency if the building work

Assessment period 5 days. No response is a does not comply with the qualitative statement for building clearance and site cover.

deemed refusal 19. An application may trigger referrat to the local government as the concurrence agency if the building work
does not comply with the qualitative statement for performance criteria 4, 5, 7, 8 or 9 of the Queensland
Development Code, part 11 or 12.

Fire safety in particular budget 20. An application may trigger referral to the local government as the concurrence agency to determine the

accommodation buildings building will comply with the fire safety standard under the Building Act 1975 when the building work has

For more information go to schedule 2 table 1 of the been completed.

IP Regulation.

Assessment period 15 days. No response is a

deemed refusal

Higher risk personal appearance 21. An application may trigger referral to the local government as the concurrence agency to determine if the

services building work

For more information go fo schedule 2 table 1 of the * — complies with the performance criteria of the Queensland Development code part 15; and

IP Regulation and the QDC part 15 « — the work does not comply with an acceptable solution stated in the part.

Assessment period 15 days. No response is a

deemed refusal

Building work for residential service | 22. An application for building work for premises in which residential care service under the Residential

For more information go to schedule 2 table 1 of the Services (Accreditation) Act 2002, section 4, is conducted, or is proposed to be conducted, will trigger

IP Regulation and the QOC part 20. teferral to the local government as the concurrence agency

Assessment period 15 days. No response is a

deemed refusal.

Building work for removal or 23. An application for the removal and/or rebuilding at another site of a building or other structure, will trigger

rebuilding referral to the local government as the concurrence agency.

For more information go to schedule 2 table 1 of the

IP Regulation.

Assessment period 5 days, No response is a

deemed refusal.

Building work for rainwater tank in 24. An application may trigger referral to the local government as the concurrence agency to determine if the

designated rainwater tank area

For more information go to schedule 2 table 1 of the
(P Regulation and the QDC part 25.

Assessment period 15 days. No response is a
deemed refusal.

 

building work or structure complies with the relevant performance criteria if -

« Under the Building Regulation 2006, a rainwater tank is proposed to be installed as part of relevant
building work, in a designated rainwater tank area; and

« Under the Queenstand Development Code, part 25, the rainwater tank does not include an acceptable
solution for a relevant performance critena.

 

Page 16

 

Page 23

       

 

aggegdy Yo | 101 -7dda

ou tea [ETRY ST |

 

youansjsuod
9} soud sadinzas SUNSXe HID
303904ju09 Burquinid 30 /9u0

  

£us3x2 10 JO Sjaaa] pud jvawubio
sbuimoup asayy uo Ajas jou Og
Su, MDIP BSAY} WO1y B}/09S JOU OG

a10N

QN3937
9 S3LON 1V¥3N39

 

Tu OME

ATMAVSOON

JOvUNIL BIdNAD 1G

XITAAG GISOdOYd — 193-OHa
NOISIO YYTIGAON MIYONY

po 13OMY

NaNOvVUa “A WH

vw /16 jo WNUixoW 0 pazoxKe

jou OUS #2, PHL “S@SO1 samoys puo $d0} OF
Aiossazau 313: SBAIDA 2O}D1U}S|s MOLY BDIADI
00v952N/S¥ 4q paujap so waysks

Buoy uononiasuc) JOM Ww auy UyM AidWOD 0}
Puc s6us 4e9024}0Q YW Aspunoy “waud}y tiv
SION

 

wand
“wo BGS mm
wos phyvorgm Owe
Seer a0 dUIperE
gcit #08 Od

toe OM O3GH Kevan BUJLUBOH PFOYUIBY “LIVNI

 

vata vere
Sree PIS “Ho

su0:70§ aOM JOIE, 4)9/ YONeAK) JO HIER 19)

 

saing 21m S02

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  
 

 

 

 

 

 

 

 

 

 

              
  

      

 

   

       

            

 

 

 

 

 

         

 

 

 

FOTIVEIS ONILSSARVH STLYMAYOL

| ott

 

 

 

voRebien,

Jo p= a+

a=
&
oJ

 

— 4
pevuuaep 24 4 i
oa, ars |

  

 

 

 

 

 

 

 

  

 

     

 

  

anion Bitoeoursy

 

 

rozagor 12s weumpes ane be De __.
ry 1) i |
perauysie) my : ' ‘ ‘buvee: J) PU #OZARO :
aed ii ii I Foe ayaanow amare wee dee 4
rer ged bd a L i"
10-6=1 x i a a — 7 ” ” eb eer rememmat ptm nnn semerme hansen see ve en ee
a aaa RR as * 4 r — T aT
[Eres aa ‘aan oon Sonne T | 4)
ve i xs wa H
+ : |
oo joueigo ganas 2 re Los LC
oy _ teo-ogre Gund evnecasd stoyenens 2 nail
- song
to - Jani UIMOd BOI TIGVIOa NON 4O A1ddNS KONFOWINS
Teo PTE) es oc606da
L
(vedo pounos he a
04 yonbe) mu Swe ee
ee
* 2leSeldSs
———$ ox; v
IWI30 Lid TOINT 30S | gow “3
W130 Lid TWIN payoads 40 eo ES xy -
; ge unyte due eonesarg | i
payoeds 90 |-— ___-
oy ASbee eon a—KHt- 2 OO
a.95— ‘ ——_.
INN rr een ae KIKI ro
peiosade yoo) pve 92801) MouLon
Ms “ial tee oe es Bae |
LAS MB OIAL MOUROS, ve e :
a rcacocsya) ord * *
RARER bee do i
onsore 6 moun NONNNY) Y sen aaoied i
SII, snare me ma seneh :
RRARRERS ee Oe Wain eee | a omiava FE
RRR a 3
RODRIG a
peyoede 60 joewdojsneg mau 4o 1988] A “,
TH “,
mT
peyreds #0 joe fumorsy 2 m
nm c8eesids
m
- 1
uo!poy!9ads $aimj90jnUoW 0) so Us |
4o} SasN}xly PUo duu!
Auoak aduo winuyuiu s ues» puo yedsur OL °G 4 |
Wy Y20e 13})0-- ¢ — -
uosoas Auioy ut Aj jonb winuwiviws—
uo! yOjNUDW OY SO- mone, |
yuo} 260/03$ UsMy 15. Saaap Udald Ol ‘b F
Buruoal2 30 Du puo daay ol C a i
533} yo pud S,dQ 10 2 AG,
s1ajoa 03] ayt] Saotap bua ur jo 1S OL 'Z *
yuawabouon | L 'S uiegatny a9
Noy UBig wsw7sHT id { . é
%, “,
|g

 

NV1d TONLNOD NOISONS ® LNANIGAS - Z-O-£9L1

SMHOM IWNOILWY3dO YSLVMNYOLS - — b-O-£9Z1

SMYOM IWNOILVYSdO YOS SONIMVAG

SIONANTS OINVYGAH YOOII GNODIS *% 1Sel4d — ¢-e9Lt
SIDIAMAS DIINVYGAH GNNOYD ~ Z-E941

QN3931 % SALON TWY3N39 — t-"9Zt

va 4YO4 SONIMVAC
SONIMVAG

 

B9869dy Yo | 4°)

 

 

 

 

 

 

 

 

Sovaasl
AIdWAD

—_—-— __ —_—

 

 

 

ng eueny Sa

wines omnis
Oo yeay 250m 364 aM

tH
El
xl we ve (J
Q
8
a

aemous 1S,

 

oun waog 8

/n fine

syn aeom seog OM
auyz0i

ant tuiseom

ee an omen

                     

ag saiew mou

 

uN wey mgood von
Wuvoy % Qn DWH
swooping 01 buiuedg uon!>ednuy 0: vei 94d

1 sa8dox ang

 

4 Jee sme
Jaquioy) vonredsut om “! rom
rena yin eA quan onpu

wae onp9

ypupig von>%uuea a4noH eo
was dnovg

dig 1U94
wos

vig uaog

aang 12104 PIO
wag iby

ay
aBouIOW 190m WHOIS,

           

 

or pus Buipeo) 10) Bu
Jonbs para.ddo 10 >,

Aime 464 ye
‘Onn Aine.

S21L0N 1¥83N39

NIXOVEE “A B® OY

yO4

ATNMAVSOON
JOVeYsL AldWAD 181

 

 

Page 24

 

 

 

 

S3DAMIS SIINVYOAH

aNnoud __ a\09s 0 Jou
NIVHO BOOT THSISH TIAVIGVA
INSTVAINDS YO NIATVS

TUL MMI

 

zat joas Bu

JMAvSOON
JOVYNSL HdNAD LAL cr ot

X31dNd AISAdOdd _193r0ug

»>
NOISIC Y¥T1Z4OM MZXONY

pesMaerad

 

Naxovad “A BW

Vere ore KS
$990 Hors cha

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

wondyaeeg Fe

 

 

onsen

wig * SL * S21 OF ota Sage
Ole 48 vonaauve> 40) Bury

10 '(q 10 N ¥dhi}
wae pejoes 9a oF
perwonios dp 104

BuIA OL VRUVMAYOIS JO NOSIS SSOYT WIidar

 

 

shy

 

ums

 

 

 

 

 

12" pW URAIOR AY, HOV. 49404
Ad vo KWo! IW ¢ Burin vonzeuve3

Oy om OIE IZ
ONS, #4010
AMG Aine Moeu wuIggL 48 01 Ad Daan “t vons36 gm
TO Patuonoy wag x SC Sh

    

 

 

 

 

 

   

‘nytogog Wun Jed
reson IO
suo7 BuneawDH

 

 

 

 

  

(1p) Jed #0002)
a Ci

    

 

 

 

ype 93 wonere
veuorwuan OLS

auoqwan

         

4
a

id 3008

___& a

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

M1ddNS SIV

TIBHSBIMDOD ans

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

As ans os

GYMPIE TERR

 

 

 

 

 

 

 

 

 

 

 

 

 

[Tie te

 

y0ds0>

5— mt:

    

 

 

 

 

 

 

ed

Wo ote

   

|—— Sp ———

soars

 

 

 

—nz

         

 

 

on PAAIHSBIMDOD B41
ab
— wT © HY
te 4 9300
goa
2:
Ss — as 25 ——n. ———-ns ns ——ars cas as AS AS ns ———ans -——as s

 

 

 

 

 

 

 

 

= AS mee - 2)

tye or dwor
.

 

 

     

 

 

 

 

= pou mow OSH
= 40a asi

 

 

 

 

Roya
1 pesrens siodsoa
peimnea io bunpos5)

n10N4

   

f

 

 

 

 

 

 

 

 

  

 

 

 

 

u

 

 

 

 

 

 

 

 

'

v
8

 

 

eae
SS

belt ly
Mp Uf

Uiiyyy
LL yy gpmenrolO
Hy”

   

 

 

 

 

 

 

              
 

 

02:11 018

 

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 25

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

—. -
| : 4p oz
Lady [,
iy | | =
3 partie
= tee + maa

a

 

 

 

 

 

 

 

Page 26

   
 

 

B9G69dY YO | 491 —-dda

 

 

 

 

 

 

 

   
  

 

SG ae y OMA IYO OOLL : Twas
te-8-T a] ‘Ge CIC
SMYOM TYNOLL¥eadO
YALYMNYOLS
— (sreuiSop srt STOTY SW IATS NVId INTAISVI
JTUAVSOON
QoveNAL AldANAD Leh
X31dNG GISOdoud
NOISIO AVTIZHON MIYONV Wi 7
iounow 30 Tig BINT FOS

 

 

NIWDvVUa “A FW

90 90un,

        

4na7D uae

 

5 as Dias tm
Sera yes Ns wo> phvorge rows
Seay a0 owperE
Bett 108 Od

£201 ow daay vevan BuyUUIOy PLOUUIOY 42N09

    

 

~
|

S¥OR HRS Ha

     

 

f@ way uendo

     

RRRRRG
VY WORRRO
Citta iadond
pumesB 1OseseN

 

 

pmyreda $0 spewing

Wwewere9 ms

voua93,9901 ws 201 sie
fou WS, fee

 

usar poe
som Go =a | ites von 3
nue ae | 3) ee pe
[seas]
ze oo ‘Ors 09 8

 

 

peroansco)

aang =O > twewotog semeg
TeASTTAITD aH peyoeds 20 yuewdownng Aeu yO (eae)

 

 

 

 

 

 

 

 

nos woven, , ee 4
x } AEH
| mo) oun
oe8 069 8 069

 

 

 

Tepua| 78,
Tato x TORETOOG BOHN 78H
TOABIEDY Www wAOerOg 70: payoads 40 yom Bunnoreey 8 S£01-1018N paZuENOD,
Bud TaN acl

 

 

o NOUVAII4 dOL

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

For DoRTADeO 6 AM

mio1g yauad, MOOT

 

 

 

 

 

 

 

       

 

 

 

 

 

 

 

 

 

 

 

 

  

          

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TL SSIVAROL NOL:
PISHSBIMDOD SHE
19 avon v0 Wet
Previn ag.
°s yo w20q ‘
a= 8 NOIL
=e NOTTS s : > as tn ns t-—rs soar
wane sn Sys, 0} duos
aug * GL ¥ GEL O1 Ord nah! tr] a [ape _wurncz, enor
Dore Io wonseauea v0} Ounis hs wen ee ee
7-4 oo
/ ee
aro Bu a nn aa a re ee ee ore ae HE ne a iin me ga eee ee ed a as OE a
20 "(4 10 N 8@h) yuaWa> pam [DADE 1499106 we uapiog
ie arcana ot #6 ong U0. nO ty“ y
Peavonah Sp ity"ns St bom ote iE ta wees wot OF pee se
fwd Aine faooy wiui9g ¥4 01 did Daan s onset sim oysang O68 7
in panwoyen wig x 6, YM fm De ent See J | ae
\ us Hoo Ps Poe
. K ri wee eet
. oo
fe ' ;
ga oan azteus — Shsanns ja
PF ay t
g ao a votes Yb \*
: <a ---- | Eig
“yily aS
. = “ae |
__- = bh
vj).

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

   

usy33ed ASVOT
Fa\aioue> ye020d Fatavauos yooed adh >

[pua Bueanioy sajomssays apis,

 

 

 

 

 

 

 

 

Page 27

GENERAL NOTES

    

 

ae - - - .
Prior to the of any construction activities the following measures
shall be : < | : .

. ; | Provide temporary

Provide education of site personnel |
‘Set up ection plans as a precaution in case of disturbances occuring t

 

 

ONIAVd

 

"

STORMWATER DRAINAGE

woles and cut off Underground pipework shall ba 100 cho PVC cloes EW mn grade 1:100 UNO.
Domnplpes anak be ‘00 Dio PVC clasy SW

 

drains as construction
progresses so as to

          

tuty_UNO.
int) sight duty

especially after an unexpected strong rainfall event ravi ensure the runoff is
Provide regular inapection and maintenanca of all structures including the
temporary structures.

 

ys discharged to the
‘ation and
sedimentation sump

 

 

 

Temporary Sump out sump -
cater detail

 

 

   

  

1d ot Iwomt meekly ond fe
‘erosion ix controlled ond 70% permenent soil

 

() Use woven
3, lamp Cont

        

iment Trap

 

o)"Aajacen te diverted oxay hom entry/exit
e} Wheel woah or np wet woatner
UTT. . 4, Sofety issues mu pale trotte control devices ta the aotisfoction of the auperintengent

 

to timber stokes of comers

 

      

Dalety issues must be considered at olf times, incorporate traffic cantrol devices to the satislaction af the Superintandent

temporary drainage ond 7. Safety tb idered at oll times, incorporate traffic control at to the sotiatoct the Sup
08 per detail

ovartion to the gully LEGEND

ient sedimentation

 

8 guily pit ond the
10 Councia pit prior to

r oetivily on site, su Esisting storm water

 

 

 

———— Storm moter Droinoge

 

ea—~ Agi Drain

           

F42 Foone to ASIIO4

Daxturbed oreo
Berm (300mm min reight) o,

feet in,
ON? cf

 

¢ Down Pipa

 

mf

00min, |

 

  

50x50 HW alone or atee! a GPL Gully
Picket 1200min tong

  

       

 
     

  

 

 

 

on ee meme Soci Fence
3 100min vertical overtop of lobrie — me Sectiment borrier
Io andiment 3
Crushed oF granular moter
Grading 10 Tobie 4 of OT
Unaisturbed oreo Specification MRS11.03
ALTERNATIVE 2 ef tocar
TEMPORARY CONSTRUCTION. ENTRY/EXIT 8 ——
SEOIMENT_ TRAP

 

SEDIMENT FENCE DETAIL

 

 

 

Secimentation
trop

™

 

 

itil

 

 

 

 

 

Concrete masoney Iniet with grote
blocks (150 serie)

 

SEDIMENT AND EROSION CONTROL MANAGEMENT PLAN:

 

 

 

 

 

 

 

 

* ORRCTME:
‘To mvniios eronion fn whe and erwura sediment hot washed down to the receiving waterway dus fo contruction
oA

 

 

 

 

© RESPONGAMLITY:
‘The maponabiity for afl assures regarding the sadiment end erpetnn control during corwtcion hell be wih the

 

 

CONTRACTOR, The contractor shell appoint ene stall mambar, Healy the foreman tn be reeporabte ta:

“he locaton of train parte such aa menias ard trenched, cut of matte, ost draira and perenater banks. Alot
treme mutes dha rare fo CuneH in dreched fo Be endimentaton banin duxing conetnllon.

Whe waste ered went down of matarai and proce In partondar conven and coment ahall be eoperated, mal to dey
rd epores of

‘Petataion ord mairaanance of te sediment contra tances of eraund the partmeter 99 shown in pian

‘~conlol of tances, sondage end hala as woh at tp vacdimariaton bepln she aach mainte greed,

12mm wire netting oll andes

goncreta mosonry blocks

 

(50. series)

 

 

 

 

 

K

 

 

 

 

 

 

 

‘corel erry pa and Wo mrivastion ef vedinen varadar ts treet parca cord of concott cuent
ed carter voces

<niipervie over merece of se and ned by enaerate m K. & V. BRACKEN
—Coware ena Bet councon vows wr prove Wr oben of aby Mer ent care, betes ape,

boat eed sins hang meat! ek Pa | scare

‘—eemur afl ernciptee tor hath Incoming and eating goods in pavtcuder nail and parsiy ore carly martad ond ned
Diaching drain path and hap raat ana! cham

‘~scanira the fon pom of winrromweter ato Bee Gury Construcion and use owelne, sandbags, bates and cher
mecouree to arwure be roncl e @recied to Fe nacdmantaton been a. times,

° acTIONE:
cane of mater rainfall everas Bw fohowing Baton plan shel be tolowed and weperabiy Inined ater by the
CONTRACTOR:

DONT WANT URITL IT 8 TOO LATED
(bo on ohn during Bre rained period wre merot Pee rath pute. Racect were repited,
‘~*chack tha tances efter every reidad and replace fre Dances where required. Check and replecs al beetara,

 

 

 

 

 

TYPICAL PUMP OUT SUMP FOR SEDIMENT AND EROSION CONTROL

 

Field inlet with grate

 

 

PRouect PROPOSED DUPLEX
181 GYMPIE TERRACE
NOOSAVILLE

DRAWING TITLE:

OPERATIONAL WORKS

contact Reinhold Koenning meat RPEG We 7023
£0 Bos $176
Buddino OLD 4575,
mod. scopy com

 

ANDREW MCKELLAR DESIGN

SEDIMENT & EROSION
CONTROL PLAN

 

hk.

 

 

 

 

 

 

 

 

Drew] RK [Oncor dere [13-907 [ho
tems 15100 oma ueo| S % 5 | 1763-0-2]

 

 

RPD:— Lot 1 on RP69868

 

Page 28

   
 

     

    

     

   

  

 

       
 

<3 @

Es zi

| a é '
2 loxCors

£ . x e Lx Syz fos te Syz Lit
x z 4 [4 , x
ts Syz Rus | bas g 2000h vendbcs bicek wall Sabir Exe p\x Sy Lit 00" 10x Coe * 4 5 “ve
.

 

 

 

 

 

 

 

    
  
 

       

 

 

 

  

entry path . od
4 x Cor sp i rr aL) are tesa OT a et Bx Cor Se
19x Lic Eve. Re rey <= x \hag Qos
Lx Sy. Cag—— | roy
y* A cri > vas rt G x Ga Cas
vacuumaid Of Co (Le Lic ve (UrdesbvsS
4 Put oO
Y Pt rn } Oo
\ under 7 H FACE | ° ©
io \see hyd getail Y c - FL 39 ©
oO . . i iC —
2x > visitor Sy Cor wo
Syz Cos, = “A, eh es Phi Yow
a x Coc se om f a eT ee 1 SSS yo tp tt tet (Le Coe §
2x Cya Coo ae b CF ) oe LY y #2 or ttt b | LL ‘a f
. . 7 ae ‘ w Liv Rus
1x CorS (2) > \f Ws | Rn RR RE FL GPS) |
i 1.34 , y \ | : . FCA j Existing Liu A
tx Cre Ete ” eo oo] , < CNT eo ae : ‘4 iS AS He OO POI CLL & bon 3 j ~~ us
A Wy) A RRA ls = ee =p Sy Po NOS TEx Ore Be Oops
\Ex Phy MA 74 C2 A SEAS 2) ( =
1 H A} wg 178 ~ <K IH QP ! Box Pry I
we Aes = Oy oti | ot ICA Tort —-C_> eS | ss
este Tete TOR eee ee "TN
Spee r— see
L-— “SX
re/ CT \ I | | vr \ me ft ee
“ne eee OS Sef ae ,
IS x Coe Se Rx Dra Bee. % 7 1X | IBx Pk Mis \Lx CorSe * Cor Sp 16 x Oni Xow 20 x Syu Lik
Ax Ror Com S$xSyz Aus 18 x er t\is the cockleshell’ Sy2 Lk / 12 x Qt Ke zx Sy2 Cos, 4 x Sy Aus
G * Syz Aus
Bx Roe Cet
PLANT SCHEDULE
#Ne: Gardess \e be Moonded,, doping ho dxeck
Code Botanical Name Size Number 8-10 large socMs Xo askey gardens.
Bac Cit Backhousia Citriodora 100%tr 3
Cor sp Cordyline species 200mm 111
CyaCoo Cyathea Cooperii 200mm 3
Dia Bre Dianella Brevipedunculata 140mm 59
Har Pen Harpulia Pendula 4Sitr 2
Lir Eve Liriope Evergreen giant 140mm 48
Liv Aus Listonia Australis 45ltr 2
Phi Xan Philodendrum Xanadu 140mm 40
Phy Mui —_‘ Phylianthus Muitiflora 140mm 72 - :
Pit Mis _Pittosporum Miss Muffet 200mm 36 PINo I Oty ae ee
SyzAus Syzyzgium Aussie Southern 25ltr 19 d
SyzCas Syzygium Cascade 25ltr 23 i Garden Consultation Design Irrigati
. : : Irrigat
par Syzygium Little Gem 200mm 6 anasca pl nN g pla n Commercial & Residential Landscape Construction
* Spread 1” hoop pine mulch to all garden areas. Location
: ray Sir Walter Buffalo to haven areas QBSA Licence No: 715497 ve wood Scale 100
ow improved soil fo tings. ,
: 1p il for all plantings 181 GYMPIE TERRACE | 3 November, 2007.

Install a Computer controlled irrigation system
(all lawns and gardens)
* Garden edges to be paver edges ( match other pavers )

Mixstone Pty Ltd
ABN 927 697 695 10

   

NOOSAVILLE 4 Wildflower Street Date
Sunshine Beach 4567 . 107

Page 29

 

 

 

 

 

 

 

 

 

 

 

  

<a ©
B i
| no
| 2 < : 10 x Cor so Lx Syz fos By Sue Lik Wb Syo Lt
= x CacSp , x dyu le
$ ax Syz Lit ir E . S x Cor
Ls Sy Pras | is 20h rend honen wall Sx Lir Eve Ax Syz Lit Ay Lie Eve 0°00! \Ox Cor SP 41.762 5? Rx CorSp (2x Syt Lit
>? i? _ oy
Ne xix x
| entry path
4 x Cor SP ey re TT | cone Yeeeces age 8 x Cor Se
19x Lie Eve, | y 3 x Yee Non
[x Sy2 Cog af Gx Ga Cas
=e vacuumaid ward
ce eae
Ni], 1 ovtane tus Lie Eve (Undead
7 . inder oO
. | see hyd detait | O
©
to ‘ \see hyd det’ cA , o
io |] “i on “
3 f° visitor tH. @
2 x Syz Cas, = ro tell SLY we PAG Xow
aecaesp IIT _| Lege
x Coe gi * Hi, LJ
a EERE Ve <Cer Sp
x Cya. Coe . rk .
Pe) 1] Lu Liv Aus
Lo Ie Ex isting, Lau Rus

|
:

 

Bx Lic Evo:
\€ x Phy MA

\p
\

6 x Sy2 Lik

7
“ \

  
 

 

 

 

 

 

 

 

 

 

4& x Syz Pus
Tus &
_ 06
IS x Cor Se x Dra Bee. x 7 FRAN SN 1Bx Pk Mis \Lx CorSe
Bese Por Pon SxSyz Aus L aye RG x Syz lit / 3x Sy2 Cag
’ 8. Pi Mis the cockleshell 18 «Via Reo. y
G x Syz Ros
Bx Roe Cet
PLANT SCHEDULE
AN: Gordons ‘eo bo Mounded, sloping Lo aveck ,

Code Botanical Name Size Number 8-10 large. socMs Xo aur y gardens.
Bac Cit Backhousia Citriodora 100ltr 3
Cor sp Cordyline species 200mm lil
CyaCoo Cyathea Cooperii 200mm 3

Dia Bre Dianella Brevipedunculata 140mm 39

Har Pen Harpulia Pendula 4Sitr 2

Lir Eve Liriope Evergreen giant 140mm 48

Liv Aus Listonia Australis 45ler 2

Phi Xan — Philodendrum Xanadu 140mm 40

Phy Mul —— Phylianthus Multiflora 140mm 72

Pit Mis Pittosporum Miss Muffet 200mm 36

Syz Aus Syzyzgium Aussie Southern 25ltr 19 d .

Syz Cas Syzygium Cascade 25ltr 23

Syz Lit Syzygium Little Gem 200mm 6 a n SsCa pl n g p | a n

NOTES :

* Spread 1” hoop pine mulch to all garden areas. Location

* Lay Sir Walter Buffalo to lawn areas QBSA Licence No: 715497

* Allow improved soil for all plantings. 181 GYMPIE TERRACE
* Install a Computer controlled irrigation system NOOSAVILLE

(all lawns and gardens)
* Garden edges to be paver edges ( match other pavers )

 

Mixstone Pty Ltd
ABN 927 697 695 10

   
  
 
  
 

* Cor Sp 16 x Pri Xow

1% x Ota Bre (nderpe®)
BO x hy May

 

  

Rox Syx Lit

4 x Sym Aus

Drawn
W. Redwood
3" November, 2007.

4 Wildflower Street
Sunshine Beach 4567

   
 

EA
aed
AR
4 WY.
SN ee
Qi
= some _

LANDSCAPING

Phone/Fax: 07 5448 0123
Mobile: 0417 700 942

      
      

Garden Consultation Design Irrigation
Commercial & Residential Landscape Construction

Scale

1:100

 

Page 30

 

 

 

 

    
 

   

 

   
   
   
    
  
   
 
   

 

 

  
   

 

 

 

  

 

 

   

       
  
 

   
   
  

      

|
\
len o
gg &
me 8
WY a
21 10x Cor s
2 x e LxSyz fos Ue Syo La
§ 1 $y, CorSp eS Lik leg \ gx Syn Lik S CoS
Le Sy2 us \ bis / a000F vend [= beck wall Sa Ur bye a x Syz Li ay Lar Eve 0°00! lox Cor Pr 41.762. p ca CerSe \2x Sy. Lit 4
enn eniry path | EL ee ge 8. CoS
“ee f ee 6 er TE ac 8
Ix Lic Eve ry : <I Xx thar Son
I» Sy2 Cog | HH A a eezt G x Gyn Cas
| Lt P (Le Lie Eve (orderdeas
/ RW tank Troon w
\ ores detail | LT 4 oO
bs rica | ©
X gee hyd gta Fey 4 (3 ©
ici aaa S “
visitor % ®
2 x Syz. Cos. 4 ey id 3 % ee PG Xan
Xx Coc rH OG DOA FL €
se m— VL x Cor S
aan 7 jt ae oO) xLoc >p
Ax Cya. Coo | / 1. Liv Ras
Tx CocS P| Existing Liv Rus
Qx Lic Eve: a UB x Dia Bee (nderpe
\é x Phy MA BO x Phy Ma
6 x Sy2 Lit
4 x Syz Bus
Task
AO 0B —“p— fF" 1 5
\S x Cae Se x Ora Bee. IB Pk Mis \Lx CorSe Rox Syn Lit
fox Yor Pon Sx Syz Aus 19. Pk Mis the cockleshell’ Sy2 it / 18 x Ma &rea 3x Syu Cos
G ~ Syz Aus
Sx Roe Ct
PLANT SCHEDULE
#BNeo: Cas dens Xe be Moonded, Sop ing ho &reck :
Code ___ Botanical Name Size Number 8-10 large. cocks Yo aekcey gardens.
Bac Cit Backhousia Citriodora 100ltr 3
Cor sp Cordyline species 200mm il } an
CyaCoo Cyathea Cooperii 200mm 3 aside
DiaBre Dianella Brevipedunculata 140mm 59 a 1G ay NAD) ( A Less
Har Pen —_ Harpulia Pendula 45itr 2 ae : ae ay
Lir Eve Liriope Evergreen giant 140mm 48 5 ESC ge 2
Liv Aus Listonia Australis 45ltr 2
Phi Xan _Philodendrum Xanadu 140mm 40 LANDSCAPING
vie Pay tanthus vo ' eon x PhonelFai: 07 5448 0123
it Mis ittosporum Miss Mutfie mm jobile: 0417 700 942
SyzAus  Syzyzgium Aussie Southern 25ltr 19 d . '
SyzCas Syzygium Cascade 251tr 23 arden Consultation Design Irrigation
Syz Lit Syzygium Little Gem 200mm 6 an sca p In g p an Commercial & Residential Landscape Construction
NOTES :
* Spread 1” hoop pine mulch to all garden areas. Location Drawn Scale
* Lay Sir Walter Buffalo to lawn areas QBSA Licence No: 715497 :
x Allow i 4 soil for all planti W. Redwood 1:100
: ow improved soil for all plantings. 181 GYMPIE TERRACE | 3“ November, 2007.

  

«all tas ond ourdeng) irrigation system Mixstone Pty Ltd NOOSAVILLE 4 Wildflower Street Date
* Garden edges to be paver edges ( match other pavers ) ABN 927 697 695 10 Sunshine Beach 4567 07

Page 31

 

 

 

aa

Requirements for Sustainable Buildings for new Class 1 building and
a sole-occupancy unit of a new Class 2 building, and renovated
bathrooms in an existing Class 1 and a sole-occupancy unit of an
existing Class 2 building.

Acceptable Solutions:

to reticulated mains water supply areas only
ar rating under Hiciency Labelling
Scheme (WELS) or a AAA rating when assessed against AS/NZ
6400:2005 Water Efficient Products -rating and labelling.

Water Pressure Limiting: (to reticulated mains water supply areas
only)

The maximum pressure level of water from any outlet within the
property boundaries of a new Class 1 building must not exceed
500kPa. Compliance can be achieved through the installation of a
water pressure limiting device in line with the water meter.

Where it is known that the pressure level of the water supply does not
exceed 500kPa, a water pressure limiting device is not required.

Dual Flush Toilets:
Toilets must have a dual flush capacity that does not exceed 6 litres
on full flush and 3 litres on half flush.

Energy Efficient Lighting:

Energy efficient lighting includes fluorescent and compact fluorescent
lights. It does not include incandescent or halogen fights. Energy
efficient lighting is to be used for at least 40 percent of the total floor
area of the building or sole occupancy unit. (Floor area means the
area of a room measured within the finished surfaces of the walls, and
includes the area occupied by any cupboard or other built-in furniture,
fixture or fitting)

This area includes associated garages.

Where a part of a house is lit by more than one light source, and one
or more of those light sources is not deemed to be efficient lighting,
then that part of the house is not considered to have efficient lighting,
and therefore does not qualify towards the 40% efficient lighting
requirement.

Hot Water Supply: In a new Class 1 building.

A suitable hot water system includes:

(a) a gas hot water system with a five star energy rating; or

(b) a heat pump or a solar hot water system where:

(i) in a building with 3 or more bedrooms, the hot water system, must
be eligible to receive at least 22 Renewable Energy Certificates; or
(ii) In a building with 1 or 2 bedrooms the hot water system must be
eligible to receive at least 14 Renewable Energy Certificates.

 

 

BIRAGKAIEN DUPLEX
181 GYMPIE TERRACE
NOOSAVILLE

 

 

 

 

 

ANDREW MCKELLAR DESIG
62 IILTON TERRACE
NOOSAVILLE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

DRAWING SCHEDULE

1.0 Cover page and Drawing Schedule

1.1 Ground Floor Plan
Second Floor Plan
Roof Plan

Door Schedule
Window Schedule
Section A

Section B

Section C

Section D

Section E
Elevations
Elevations

Ceiling Plan; External Cladding

 

 

 

Page 32

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  
  

 

 

   

 

 

 

  
 
  
  

  
   
 

      

       
  
 
 
 
 
 

   

 

  
  

    
  
 

 

  
   

 

    
 
  

  
  
 
 
 

 

    
  

 

 

  
 

 

 
    
   
 
 

 

 

     
  

 

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

 

 

 
     

 

 

 

   

 

  
 

 
   
  

    

     

 

 

  

 

 

 

 

 

 

 

 

 

 

 

  

 

 

 

 

 

 

 

 

 

 

| \ I
t 3,205 : 26,790 1,000 10,767
i 7,390 3,210 .. 6,590 2,610 - _ 6,990 . { !
1 eo 1 a |
200},,190 6,810 190 3.210 190 4,410 190), 1,610 2,610 1,700 4,900
' i 1 al fe |
leg 2 tf 6,100 f 16,210 { 5,500 190
ES =, | :
w 5 g stair details: N
GB 6 18R @ 175mm . |
2 | 16T @ 250mm |
2000h rendered blockwork B chad f influence stair to be 100mm min Wi |
over existing 3 clear widt
Fetaining wall §: existing 2000h rendered bck walt 190, 7 4,1 2,000 4,310 A 0°00 41 762 oS
+
= : 3 5 =: =p-—> 1 —*
7 i
2 Z D d + m2 li 2 2
3 2 (77 (> \ sero 8 veto 3 tit Fonte lift pit: FL 1.42 entry path hose point ate ; 2 2 2
ai — new A pS WT oe TT | -_FT- TT conc. qrposed agg - ™ ea
a - 2 Loot = p | —k 8
SM oP Q op 2 4 Ss oP { ° [__1R00n glass pool fence P intercom ! oO
a a 1L/0.80 7 Pez 7 SS CL ILL A IVT _ _ Y Y y) KIA 77 PIII IZ ZIT a gate || i o ds a
= “2065 ~ — H ies 14 e\"e
x) 2 2900 ] seamless epoxy flooring oo ———— 1 J et CW5 ez iy | = | &, 2 — er
— inish to carspaces | hose point [J Y seamless Epoxy floorin: y z 2 SY
L_—_fyzd YJ U Poxy 9 {7 z _
o =< hoes por] WO | LCL... LG # finish to carspaces == banked 8 on
oO NX H 4 NN O22 77777 A . 5 Y garden 2Q LX 8
Qo N - / RW tank \ 3,400 | / del ; . A Bt
8 8 o bin ( woeh 4 + t A A | garden |S = p Oo
rcp) 2} Oo (| st see hyd detail | k 4 2 — a a Oo
oO “7 Nl o sto ] | Ca rpa r shaded area denotes y r} 5 g ~N © Oo 5 3 2
: fal ling at 2550h { ~~ | |
° . y FL 1.65 meceings H Y z 19 (5 & 4 oF ©
wo U 4 \ o
© H concrete | Y 4,073 s /
r z - pee @ |
or Oo 8 P Sy 8 | 2
o pe 1 a
= oO oO ; 9 a °Q
No - & 8 g 2 i c o| 2
= = iy = Zz
So Oo 0 > eS
o _ x
= x 4 3 | oD)
4 2 | | in =
gS 8 oO | oF weatherboard-clad block ™ °° | 8 8
O —- t column i o - oO
yi pool pump | Garcerr—Ssnnre ee 5
«| garaen enclosure 7 20 pit pit . —
¢ jn) E <f HE al[e |} 2d 4
6 _———4 powdercoated alum SI
Metal Art Industries 3 000h rendered block wall slatted screen 2000h rendered block wall
Superslat screen & ! |
® ex S2x10x ~ —
© powdercoat finish Pave 4-20 180°00' 52 Sg 2 600 |
net =o _ /
SL footpath 1500w /
ou als) a a |
C © a
V ee 1:2 V <
1.25 1.22 back of kerb 1.20 118
1.10 TB 1.06 ~
concrete exposed aggregate 104
as selected
the cockleshell
190), 1600 27,210 600 190
note:
total enclosed floor area (all floors): 490sqm.
no requirement for fire hydrant / hose reel
under 500sqm
no. date amendments - workmanship and materials shall be in accordance
with relevant current s.a.a codes and statutory

 

ground floor plan

   
 

Client Location

K. & V. BRACKEN

 

andrew meoxellar

  

   
  
 
 

181 GYMPIE TERRACE

 

 

 

   

design

 

 

PO Box 1222
TEWANTIN 4565

 
   
 

QBSA reg. 65073

   
  

Project

PROPOSED DUPLEX

Phone/Fax:
(07) 5449 9066

NOOSAVILLE

Drawing

FLOOR PLAN

Drawing no.

18.0707.1.1

  

   
  

  
 
  
 
  

   
 

authorities requirements

- all dimensions and levels to be checked on site by
builder before commencing work

- do not scale drawings

Drawn Scale

AM 1:100

     

 

Date

   
  

 

SEPT ‘07

Page 33

 

 

 

 

 

 

  
 

 

 

    

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

      
   

 

        
  
      
   
   
  
   

   

  

 
   

 

   

 

 

   
  
  

 

 

 

3,205 - 26,790. _. __ 1,000 10,767 '
t 400 7,390 3,210 6,590 3,000 2,810 3,790
1 190 00
200},,190 3,210 70 3,530 190 3,210 190 4,410 190), 1,610 2,610 190 00 2,810 190 3,010
190} 1,100 0 70 |600
190 3,810 2,000 —_ 1,730 pot pe 7,300 190
NK
provide Extend-a-line (A)
clothesline to balcony stair detai - f
shaded area denotes 18R @ 175mm 2
false ceiling at 2500h
3,260 16T @ 250m 0°00" 41.762 2
SS + clear width © —_—* —_—
| handrail at 1000h over oO |
2 2,899 900h solid blockwork 2 50d ow spitt 2 8
. ia pvc overflow spitter
S| oO | 2 oCW8 = fe _CWws op hose point cast into conc hob ° oO 2B 8 a
3 op oP — s | fall roof stab to cast-in rainwater — om OQ
= sey} |S 19 ry outlet, o
. one — alv brass clamp-ring type To
a] | ft ‘ | 1w2d 1W21 iu | weatherboard-clad block > 3 Q
9 iumn.
2 bed 2 a [ 4 a = ‘zip’ water chiller/ mie ci | downpipe to be cast into column Se
sf a heater =
3S t d 1id4 75 wo LN | | ZX Mo oO
5 | carpe side polished timber floor ironing 8 gallery 102) wt try alcove’ = d . oe {D) | I B | | = {D) % = ‘S| oO 2
hes =, Ining . i rt semi-frameless glass balustrading _ - N a oe
2 Iced tv _ of HE sigs F° oe livi ng +H to detail Qj © 9 "oO «|
oO ee 4 q ‘ id lin tidt e Ne soo} b- intercom FL 4.85 polished timber floor 7 - — 8 Ay
9 bed1 | sia? lL . én75 U1 10547 ® 9".
x : media | tT + oS
1W14 | verre __t : yap iwi i Ee 8
' | ° 1W5 4W2 atu | Ss Os
¢ dP t “3
3 = O —* 8—*3
© sp a io << o
to 1000h blockwork 9 ©
ip Caroma Profile © over hob 5 c
& x corer aves . © handbasin 600, v Tat 20!
o N guner handrail at 1000h over 190, 3,000 0
line of ground floor colaurbond custom orb 900h solid blockwork 190 3,010 190/|,1,010 3,190
roofing below 200 3,300 200
4{— ° © —*
| 180°00' 41.762
A [| shaded area denotes
Rw 45 suspended ceiling to conceal services over.
13mm Gyproc Soundchek plasterboard on timber
Seren vias oelparttion batts over
the cockleshell ig pipes wih Pyrotek 4525
note; max 4 downlights per Ssqm
PVC pipe penetrations to slab to be protected
with fire rated collars to manuf. written specification
70 |}800] 1,0 note: perimeter detailing of Rw rated ceilng to be in
190 00 4,210 1,810 2,280 | 70 00 3,610 70 4,730 190 7,610 190 3,000 accordance with manufacturers specification to ,
ensure acoustic performance of ceiling in maintaine:
200//,190 4,210 190 5,810 190 4,210 190 4610 3,400 190) 3,010 190) 1,200
400), 4,990 | 5.410 | 4,990 | 4,410 3,200 | 3,790 1,000)
| ssa 27,790 500 orto sult nt praeroas lor
75mm glasswool partition batts my appropriately licensed persons
IT _
ARISEN ROI]
>< [><]
timber stud frame to manf. detail KY) COG 2
- workmanship and materials shall be in accordance slayer 13mm plasterboard iy 3
with relevant current s.a.a codes and statutory “ayer Tomi Plastemoan ? RX 8
authorities requirements waste pipe lagged with Pyrotek 4525 er Dy N
- all dimensions and levels to be checked on site by IRR NR
builder before commencing work RN SE au oooN AS hydraulic design to consultant's detail
- do not scale drawings js ae eee of sonices as required for
to coun requterenie provide
aluminium angle frame & sealing . .
no date amendments access panel not to be placed in habit services duct detail (sd)
e access panel not to be placed in habitable rooms :
‘a other then kitchen; see BCA Qid F5.6 to achieve Rw46
fi rst floor plan see CSR specification
CSR S$S22
“1; - alee - Client Location Drawing Drawn Scale
andrew mexellar FLOOR PLAN AM 4-100
; a K. & V. BRACKEN .
design QBSA reg. 65073 181 GYMPIE TERRACE
Project Drawing no. Date
PO Box 1222 Phone/Fax: role NOOSAVILLE 48.0707.1.2 SEPT ‘07 4 2
TEWANTIN 4565 (07) 5449 9066 PROPOSED DUPLEX . t. .

Page 34

 

  

 

 

 

    

 

 

 

 

 
  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

3,205 26,790 a 1,000 10,767 ‘
T 400 7,390 3,210 4,600 1,990 3,000 2,810 3,790 1,000
10 4 0
200 3,210 70 3,530 190 3,210 190 4,410 1,610 2,610 190 00 2,810 190 3,010 00
7 600
190 1,109 2,000 “ 1,730 is 20 7,300 190 +t 2,500 ¢
A A
(A)
colourbond custom orb stair details: 7
roofing Below 18R @ 175m 2
provide Extend-a-line 16T @ 250m 0°00! 41.762 wo
clothesline to balcony ‘air to of -
a aie oem T °
3 260 : handrail at 1000h over 3 o
‘soll lockwo!
2,899 | S| oP = Ss hose point 50dia pvc overflow spitter Oo 3 oO S|
_- _ _ ] — >; ~ 2wWT7 € _- 1 cast into conc hob oa
op bP —— OP sp w post Q
= ~T — swe “] aatherboericlad block
2W1 _~- - ° | ft 4 —, av— — plinth. refer to sections
IN 2 400, | c/o i Wis \ 2wod 2W21 J 7 fall roof slab to cast-in rainwater
r ‘bed 2 28 36 . zip\water chiller/ . 7 | | ae tampering type
| 4, kit. heater A XN @
{ carpet\ 2id4 75 2D2 \ 2 iv (:) | 7 _ oO
\ 2ia6 7 polished tirhber flpor rome o \ gallery trys alcow dw re dinit 4D) Le = 4D) O
6 Ied Pras = “HLL, hg J Y | 1 l semi-frameless glass balustrading “ c
| / ~! Lt aa > < ye | § [-inercom | 6 vin | '0 deta N 2
bed 4 mon \ ! id lin Y Didt , a 300 ahs | FLL 00 polished timber floor ud 10.547 - v
~ 2iey : rN / 2 A ‘ ®
S  awal pom ——t YA am en : | Be g e
= -- ei oor - Tc 3 WS — —2W2 5
2Wh2 bwit, .2w40/2 se|_2W6 4 in oD)
= | o> 3 io
= 150 Hebel LLL 4t — J] 150Hebe! L | Eel | | 150 Hebel L | <P @ 8031 3
ty sun hood below sun hood below sun hood below sun hood below sun hood below sun hood below ao!
oO i ©} Caroma Profile l 190 900 1,400 a o
— 3 t+ integated pan & -
o 8 SN] handbasin 190, 3,010 190 ||, 1,010 2,690 i)
| 200 3,390 200
*— o- ~ —O +
T 180°00'
the cockleshell
70 ||800| 1,0
190 00 4210 70 1,810 2,280 70 00 3,610 70 4,730 190 7,610 190 2,500
740 1,20
600 4,210 190 5,810 190 4,210 190 4,610 3,400 190) 3,010 190
400 4,990 | 5,410 [ 4,990 | 4,410 3,200 | 3,790 1,000}
1 3,544 27,790
- workmanship and materials shall be in accordance
no. date amendments with relevant current s.a.a codes and statutory
second floor plan authorities requirements
- all dimensions and levels to be checked on site by
builder before commencing work
- do not scale drawings
| i , Client Location Drawing Drawn Scale
andrew micellar FLOOR PLAN AM 4:100
2 K. & V. BRACKEN .
design QBSA reg. 65073 181 GYMPIE TERRACE
Project Drawing no. Date
PO Box 1222 Phone/Fax: rere NOOSAVILLE 9 48.0707.1.3 sept‘o7| 3
TEWANTIN 4565 (07) 5449 9066 PROPOSED DUPLEX . -t. .

Page 35

12.211

271°35'15"

 

colourbond quad
gutter & fascia

7,190

 

no.

date

amendments

 

 

 

 

 

 

colourbond trimdek roofing on
R2.0 insulation bianket

colourbond custom orb rpofing on

R2.0 insulation blanket

tine of wall below

3,210

ancdrow me

design

PO Box 1222
TEWANTIN 4565

4,590

 

 

N
N

11.70m high

7
74
7

y 2w25

4.710

180°00'

the cockleshell

roof plan

xellar
QBSA reg. 65073

Phone/Fax:
(07) 5449 9066

Client
K. & V. BRACKEN

Project

PROPOSED DUPLEX

7
/

\ 7
. yan | /2N22
\ 4 IN Aa —
roof ridge RL 130 J x<

“ void of living ‘ .2w23

\

U2

Lowa N

 

Location

181 GYMPIE TERRACE
NOOSAVILLE

aluminium shade battens
ex 100x50x3 bolted to welded cleats.
powdercoat finish

 

gympie terrace

colourbond apron flashing

colourbond custom orb roofing on
R2.0 insulation blanket

 

 

- workmanship and materials shall be in accordance
with relevant current s.a.a codes and statutory
authorities requirements

- all dimensions and levels to be checked on site by
builder before commencing work

- do not scale drawings

Scale

ROOF PLAN 1:100

Drawing

Drawing no. Date

18.0707.1.4 SEPT ‘07

 

Page 36

2,590

810 970 810

4.810 ‘

 

 

 

1,810 .

 

 

 

 

 

 

 

2,410
2,110

 

 

 

 

 

 

 

N
oltward
opening
fg fg

 

 

 

 

 

 

 

 

2.410
SS +
eS

2.710 -

 

 

 

 

 

 

2,410

 

 

 

 

 

fg

 

 

 

 

rebate slab 30mm for sill

alum framed fixed
louvre doors

CD2

alum framed entry/exit
door with lever handle

CD1

, 1,410 ,

with cl

-/60/30 FRL door
in folded steel frame,

. 3,210 ,

rebate slab 50mm for silt; provide sub-sill as required

timber framed sliding doors
with 10.38mm lam glass

1D1, 2D1

joser

CD3

, 770 4

-/60/30 FRL door
in folded steel frame,
with closer

1D2, 2D2

. 1,370 .

rebate siab 50mm for sill; provide sub-sill as required

timber framed sliding door
with 10.38mm lam glass

1D3, 2D3

, 820 1

 

 

 

 

 

 

 

 

 

 

 

milky white
glass

rebate slab 50mm for sill; provide sub-sill as required

 

 

 

 

 

 

 

 

 

 

 

 

milky white
glass

rebate slab 50mm for sill; provide sub-sill as required

timber framed sliding door
with 10.38mm lam glass

1D4, 2D4

alum. framed sliding doors
with 6mm toughened glass

1D5, 2D5

_ 170 4 pe verify on r

ch

solid core cavity
sliding door

1id7, 2id7

2,410
2.110

 

alum framed sliding
wardrobe doors with
cotourbacked glass infil

typical wardrobe door

notes

*“ windows & doors to be quality, aluminium framed
‘Vantage’ or equivalent as selected; except as noted

* aluminium frames to be clear anodise finished to

* all reveals to be plasterboard

* frames & glazing to comply with relevant
Australian Standards

* all clear glazing unless otherwise noted

* builder to verify sizes on site

* Openings in blockwork to be waterproof membraned
before fitting window / door frames.

* door furniture to owner's specification

  
   
  
      
  

 

a)

andraw mekellar
design

PO Box 1222
TEWANTIN Q4565

2.410

 

 

 

timber framed bifolding
plantation louvre doors

1id1, 2id1

solid core door in
timber frame

lid2, 2id2
1id4, 2id4

door schedule

  
   

  
   
  
 
 
    
    

   

Client Location

K. & V. BRACKEN

QBSA reg 65073 181 GYMPIE TERRACE

NOOSAVILLE

 
 
 
     

Project

PROPOSED DUPLEX

Phone/Fax:
(07) 5449 9066

Aa

  

 

 

 

 

 

 

 

 

 

timber framed bifolding
louvre doors

1id3, 2id3

    
  
   
 

Drawing

SCHEDULE

 
 

 
 
   
 
 
  
 

Drawing no.

18.0707.2.1

      
  
 
       

    
  

A

Vy

solid core door in
timber frame

1id5, 2id5,
11d6, 2id6

2,410

 

 
   
 
 

Date

SEPT ‘07

   

 

Page 37

1,810 p—1810 yy py

Tt | ,
io

, 610» 310, 1 , 1,810 .

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

oO fg © © L °
= =
st 2 x
, : a .
2 =
2
10.38mm NI 10.38mm lam. glass 8 10.38mm iam. glass 8
lam. glass © @
6 ne
10.38mm lam. glass 8 6mm toughened giass 10.38mm tam. glass 10.38mm tam. glass — my toughened glass gS ~ 8
oO Qo oO
7 fg = ~
rebate slab 30mm for sill
alum framed Breezway louvres alum framed alum framed alum framed fixed glass alum framed alum framed alum framed alum framed
double hung double hung double hung 9 sliding double hung sliding double hung

1W1, 2W1,  1W2, 1W5, 1W18 1W12,2W12 1W6, 2W6 1W7, 2W7 1W8, 2W8  1W9, 1W10, 1W111W13, 2W13 1W14, 2W14 tosenmiom sss
1W3, 1W4 = 1W20, 1W21, 2W2, 2W5, 2W9, 2W10, 2W11 1WV15, 2W115 crm roushenes sass
2W3, 2W4  2W18, 2W20, 2W21 CW11

1,210 1,610 1.810 2,320 2,320 2,570 2,570
2,320 1,160 1,160 1,160 1,410 1.410 1,160

8 8
fg o fg fg © fg
2 milky white glass 6mm toughened glass 6mm toughened glass 6mm toughened glass 6mm toughened glass
6mm toughened co fg
milky white obscure glass

milky white glass

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

610

9 fg

q
|

 

 

 

 

 

 

 

 

 

o|
oO

oO

@

7 Oo

    
  

    
   
 

alum framed ‘Pyropanel' or equivalent ‘Pyropanel' or equivalent alum framed fixed glass alum framed fixed glass
sliding coupled with Breezway louvres coupled with Breezway louvres

1W16, 2W16 1W17, 2W17 1W19, 2W19 2W22 2W23 2W24 2W25

  
    
  

 
 

 

 

 
  
 
 

 

 

 

6mm toughened glass

 
 

1,000
1.200

-/60/- rated glass bricks

   

 

 
 

alum framed Glass Bricks Australia
double hung ‘Newave’ or equiv.

CW1, CW2, CW3, CW6, CW7, CW8,
CW4, CW5 Cw9, CW10

notes

“windows & doors to be quality, aluminium framed
‘Vantage’ or equivalent as selected: except as noted. WI n d OW sch ed Uu le
* aluminium frames to be clear anodise finished to
* all reveals to be plasterboard
* frames & glazing to comply with relevant
Austratian Standards
* all clear glazing unless otherwise noted
* builder to verify sizes on site
* Openings in blockwork to be waterproof membraned
before fitting window / door frames.
* door furniture to owner's specification

 
  
   

 
          
     
   
   
 

 
  
 
   

 
  
     
  
  
 
     
 

    
  
  
 
 
  
   
   
    
  

   
  
  
  

  

Client

andrew mekellar Location Drawing

design QBSA reg 65073

PO Box 1222 Phone/Fax:
TEWANTIN Q4565 (07) 5449 9066

K. & V. BRACKEN SCHEDULE

   
 
 
  
   
   

 
 

181 GYMPIE TERRACE
NOOSAVILLE

  
    
 
   

 
    

     
   

 

Date

SEPT '07

Drawing no.

18.0707.2.2

Project

PROPOSED DUPLEX

 

   
   

Page 38

20° roof pitch

5° roof pitch

colourbond custom orb roofing on R2.0 insulation blanket.
38x75 hw roof battens @ 900crs

prefabricated timber roof trusses @ 900crs to manuf. design
10mm plasterboard ceiling on 35x42 battens @ 450crs

412.0m max height line

 

600

 

50x 100hw top plate bolted to
blockwork |

colourbond custom orb roofing on R2.0 insulation blanket.

alignment

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

colourbond channel : flashing

7
Wi fixed to blockwork
screw sheets through top flange
colourbond custon orb
/ screw into pipe

S0dia galv pipe

25dia galv struts @ 1500max crs
welded to 50dia pipe

NN 10mm galv flat bracket

bolt to blockwork

window awning detail 1:20

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

 

 

 

 

 

 

 

38x75 hw roof battens @ 900crs , ;
120x45 MGP12 rafters @ 900 crs to eng. detail € Hardie Lidea weatherboards on sarking
to manuf specification
OO cotourbon apron flashing
lintel & timber framing aS FB
to eng. detail SS ounont quad gutter & fascia
& 165x8$/17C lambeam to detail
concrete block intel to eng. detail —— g a fibrecement eaves lining
Ss g plasterhoard lined
top floor Oo oO bulkhead
10mm plasterboard linings on 2 ol
15mm plasterboard battens @ 450 crs oO |
{wall shaded by eaves) oO S livi ss waterproof membrane openings in blockwork
wo + before fitting windows
waterproof skimcoat render 0 [
& acrylic armour paint finish > N iN block
I ill blo
rebate slab 50mm for blockwork U2 polished bonen timber flooring glued &secret nailed
mim tor DIOcKWOrK, to 15mm plywood substrate, adhesive fixed &
SL 8.00 typical | FFLI8.035 screwed es Substrate:
oO .
rr a ee ee mk Ra a a a a a ee Te lat Ce ke a.
190mm reinforced blockwork
8 10mm plasterboard lined bulkhead solid corelfilled to eng. detail
N T
10mm plasterboard ceiling on
35x45 timber battens screwed to siab. squar t |
provide 30mm insulation batts between battens plasterhoard KX
galv CHS window awning to detail
o frst floor 7 ° 3 . |
1 mm plasterboard linings on Oo zt 15° roof pitch
- 30mm plasterboard battens @ 450 crs. nN ~ o« a
oy total R value for core filled, rendered wall: wo a F
N R14 | AN built-in apron flashing
colourborh custom orb roofing on foil sarking
w 38x75 hw roof battens @ 900crs
—
SL 4 85 rebate slab 50mm for blockwork: | wo U 1 90x45, mre rafters @ 900 crs to eng. detail
. w
stab o
5 < aes seed |
8 8
suspended concrete slab to engineer's detail | N N << PVC downpipe ;
off-form finish to soffit 7 all brackefs & fixings to be stainless steel
existing rendered block wall | waterproof skimcoat render &
Oo acrylic arrhour paint fintsh
Rg 600,
oO : j a
8 | garage
N
render & paint finish
to garage internal walls
epoxy flake enamei over
SL 1 .65 concrete slab
**

concrete slab & footing to eng. detail

NOTES:

protect against white ants to AS 3660.1.
Kordon or equivaient .

All applications to manufacturer's written
specification

 

section A

sncdlray a} alle Client Locati Drawing

! Irauy meseallar K.&V.BRACKEN | btn SECTION
desi gn QBSA reg 65073 481 GYMPIE TERRACE :
PO Box 1222 Phone/Fax: Project NOOSAVILLE Drawing no.

TEWANTIN Q4565 (07) 5449 9066 18.0707.3.1

PROPOSED DUPLEX

Drawn Scale

AM 1:50

3.1

Date

SEPT '07

Page 39

5° roof pitch

12.0m max height line

alignment

600

alignment

  
 
 
 
 
  
 
 
 
 
  
 
  
  
 
 
  
 
  
   
    
 
   
 

colourbond custom orb roofing on R2.0 insulation blanket.
38x75 hw roof battens @ 900crs |
120x45 MGP12 rafters @ 900 crs to eng. detall

 

Hardie Lirjea weatherboards
on sarking.
paint finish

 

 

blockwork to extend to underside of
roofing material ( including 2 adjacent
walls of shaft )

fill all gaps with mineral fibre or

other fire resisting material |

 

 

 

 

 

colourborts quad gutter & folded
colourbond fascia

Hebel renfered window hood
through bolted to blockwork

 

 

90/90/90 FRL ceiling
2 layers 16mm Gyproc Fyrchek
to CSR 876 specification

 

 

ment lined bulkhead

Hardie Linea weatherboards
on 20mm battens fixed to blockwork.
paint finish

 

fibrecement reveal as required

 

2.720

suspended slab failing to rainwater outlets
selected non slip floor tiling over
‘Wolfin’ firs we membrane laid

2.700 headroom

to manufafturer’s written specification.

polished 19mm timber flooring glued &secret nailed i" r
to extend into sill rebate

to 15mm plywood substrate, adhesive fixed &

SL 8 . 00 screwed to slab

membra

semi-frameless glass balustrading
to detail

 

conc. drip'’mould & texture paint finish
to slab soffit

200

10mm plasterboard ceiling on
35x45 timber battens screwed to siab. t
provide 30mm insulation batts between batte

waterproof skimcoat render & —_____.__] p>

acrylic armour paint finish

 

waterproof membrane openings in blockwork
before fitting windows

 

 

       
  
 
   
  
 
 

°

stainless steel handrail at 1000h

    

140 reinforced blockwork over
conc.hob 100hx140w

oo built-in apton flashing

 
 
  
 
 

Easy Living Lifts ‘Superdomus' lift.
car, 100wx1400dx2100h

with -/60/30 stainless steel
automatic doors to AS1735 Part 16.
provide PIN coder or security card reader
to manuf. specification

 
 

  
 

    
     
 

5

LASNSAAY

I
L

i

 

190mm reinforced blockwork
solid core filled to eng. detail

 

    
 
 

 

 

 
     
       
      
     
  
   
   
   

 

 

 

 

 

| a NZ °
oy VM Oo colourbon}s custom orb roofing on foil sarking
L V4 t+ 38x75 hw'roof battens @ 900crs
duct space 5 i 600 90x45 MGP12 rafters @ 900 crs to eng. detail
existing rendered block wall r fibrecemeht eaves lining
suspended concrete slab to |

8 N engineer's detail
“A off-form finish to soffit
oO WwW Oo | t—SsSY panelift gqrage door with remote

S i. acific maple ply cladding to

wo P ple ply ing
0) garage oO} ™| N manuf. detail
N lift control unit in weatherproof render & paint finish pa N |
enclosure to garage internal wails N
rebate slap for
SL 1.65 en
. concrete exposed aggregate driveway
44 |
2s DONS cme
4

NOTES:

protect against white ants to AS 3660.1.

Kordon or equivalent . .
Atl applications to manufacturer's written se ( | O n

specification

    
   
 
  
   
 
     
 

 

Client Drawing Scale

  
  
 
  
   
   

     

andrew mexellar Location

 
 
 
  

K. & V. BRACKEN SECTION 1:50

 

  

 
    

 
      
 

  
   

design QBSA reg 65073 481 GYMPIE TERRACE
PO Box 1222 Phone/Fax: Project NOOSAVILLE Drawing no. Date
TEWANTIN Q4565 (07) 5449 9066 PROPOSED DUPLEX 18.0707.3.2 SEPT ‘07

Page 40

colourbond custom orb roofing on R2.0 insulation blanket
38x75 hw roof battens @ 900crs

prefabricated timber roof trisses @ 900crs to manuf. design
10mm plasterboard ceiling on 35x42 battens @ 450crs

20° roof pitch 5° roof pitch

|

 

 

alignment

colourbond custom orb roofing on R2.0 insulation blanket
38x75 hw roof battens @ 900crs
timber rafters @ 900 crs to eng. detail

50x100hw top plate bolted to
blockwork

 

top blockwork

waterproof skimcoat render
& acrylic armour paint finish

     
 
 
  
 
 
  

Hardie Lite weatherboards on sarking
to manuf specification

*oeursony apron flashing

alignment

 

230x85 17C lam in plate of trusses

|

colourbond quad gutter & folded
colourbond fascia

 

 

 

 

 

 

 

 

 

 

 

"brecemert eaves lining

 

 

 

 

top floor

 

 

frameless glass shower screen

2,750

fall slab to floor waste in wet areas.

 

constant floor level with adjacent polished

bed floor tiles as required to provide Li

10mm plasterboard linings on
15mm piabterboard battens @ 450 crs
(wall shaded by eaves)

 
  
  
 

 

 

timber or carpetted floors

SL 8 . 00 rebate slab 50mm for blockwork;

selected dive over 15mm plywood substrate,
adhesive fixed & screwed to slab

   

 

 

 

 
    

 

 

 

 

 

 

 

  
 
 

with fire rated cotlars to manuf. written specification
Note: perimeter detailing of of Rw rated ceiling to be
in accordance with manufacturer's specification to

ensure acoustic performance of ceiling is maintained

SL 4.85 |

rebate slab 50mm for blockwork;

  

=

suspended concrete slab to engineer's detail |
off-form finish to soffit

PVC downpipe
oO all brackets & fixings to be stainless steel
x
N
Q 7
«] Vy
N Metal Art Industries Supersiat screen Z

ex 32x 10x 4.2
powdercoat finish

 

SL 1.65

 

 
   
   

          
    
 
   
 

 

  

 

 
 

 

 

 
 

 

 
 
 
 
 
  
  
 

 

 

 

 

te We
—— sound rated services duct to detail 190mm rainforced blockwork
gS Rw46 solid corejfilled to eng. detail
N |
Rw 45 suspended ceiling to conceal services ber 6 Sel } first floor L
13mm Gyproc Soundchek plasterboard on timber plasterboard 10mm plaS$terboard linings on
ceiling joists @ 600crs 30mm plasterboard battens @ 450 crs.
o yemm glasewoo) partion patts over. provide 39mm insulation between battens.
lag pipes yrote ° i total R vahue for core filled, rendered wall;
© o CSR Spec. SS23_ (max 4 downlights per 5sqm) 15° roof pitch R1.4

10mm plabterboard ceiling on
35x45 timber battens screwed to slab.
provide 39mm insulation batts between battens

 

built-in apton flashing

 

 

colourbor}
38x75 hw

custom orb roofing on foil sarking.
roof battens @ 900crs

 

acrylic arrhour paint finish

4
i waterprocf skimeoat render &

garage

render & paint finish
to garage internal walls

   

2,410

 
 
   

 

 

NOTES

protect against white ants to AS 3660.1
Kordon or equivalent

Ail applications to manufacturer's written
specification

    

 

 

 

section C

andrew mekella; Client Locati Drawing
’ neler K.&V.BRACKEN | SECTION

design QBSA reg 65073 481 GYMPIE TERRACE

PO Box 1222 Phone/Fax: Project NOOSAVILLE Drawing no.
TEWANTIN Q4565 on hag 9066 PROPOSED DUPLEX 18.0707.3.3

 

Date

SEPT ‘07

Page 41

SL 8.00

~~

3.920

colourbond custom orb roofin
38x75 hw roof battens @ 90:
Pprefabocated timber root

10mm plasterboard ceiling o

lintel & timber framing to engi

timber framed sliding door to

polished 19mm timber floor
to 15mm plywood substrate,
screwed to slab

 

 

 

a
200
35

 

 

  

on R2.0 insulation blanket
rs

-@ WOcrs te manuf. design
35x42 battens @ 450crs

20° roof pitch

=

 

 

 

 

 

 

 

glued &secret nailed
dhesive fixed &

 

FFL 8.035

Be a a eae

between battens

living

FFL 4.885

garage

8 2 10mm plasterboard ceiling o
N 35x45 timber battens screw
provide 30mm insulation batt
frame down to door head hei
oO 10mm plasterboard lined bull
8 2
—
Q
oa} OH] ©
oy Ni
N
Q
Ww)
N suspended concrete slab
to engineer's detail
Q
a
ao
oO Ww
oy
N der & t finish te
render & paint finish to
garage internal walls ?
SL 1 65 epoxy flake enamel over
. concrete slab
$—*

 

 

 

925

2,875

 

12.5° roof pitch

==

 

 

600
1,855 700
Leers detail F
“oT
--
Bchedule >_> o Ss
living 2 bale.
8 :
N

 

 

 

 

 

1,000

Hardie Linea weatherboards
Paint finish

colourbond custon orb roofing on
R2.0 insulation blanket
& 140x45 MGP12 roof purlins @ 900crs to eng detail

powdercoated alum shade battens
ex 100x50x3.0 @ 100crs bolted to cleats to eng detail

twin galv 125x75x4.0 steel [email protected] welded cleats for purlins to eng detail

Hardigroove grooved fibrecement ceiling with
on timber ceiling joists & battens

200x200 hw post set on galv
saddle.
oil finish

semi-frameless glass balustrading
to detail

toughened semi frameless giass

an balustrading

stainless stee/ upright
with 50dia staintess steel
offset handrail

   
  

rebate door sill 50mm

cone hob with spitters
as located on floor pians

welded ss bracket
face-fixed to balc slab

 
 
 

selected non slip floor tiling over
‘Wolfin' waterproofing membrane laid
to manufacturer's written specification
membrane to extend into sill rebate

drip mould
render & paint finish

balcony detail 1: 20

 

 

60

 

 

 

200

 

 

 

 

 

 

 

 

 

 

suspended slab falling to rainwater outlets.

selected non slip floor tiling over ‘Wolfin’ waterproofing
membrane laid to manufacturer's written

specification

membrane to extend over plinths & into sill rebate

downpipe to be cast into column

clad column with Hardie Linea weatherboards
on sarking, fixed to galv [email protected] finish

rebate slab 50mm for door sill

render & paint finish to slab soffit.

waterproof skimcoat render
& acrylic armour paint finish

stainless steel BBQ and
bench unit

 

 

 

 

 

 

 

 

 

 

section D

andraw mekallar

design

PO Box 1222
TEWANTIN Q4565

Phone/Fax:
(07) 5449 9066

Client

QBSA reg 65073

selected -Slip tiles
over cong slab

stone faded feature wall
with wate? cascade

rendered garden wall
max 2000h

 

 

 

 

K. & V. BRACKEN

Project

PROPOSED DUPLEX

Location

 

Scale

1:50

3.4

Drawn

AM

Drawing

SECTION

181 GYMPIE TERRACE
NOOSAVILLE

Date

SEPT '07 |

Drawing no.

18.0707.3.4

Page 42

colourbond custom orb roofing on R2.0 insulation blanket. 20° roof pitch 5° roof pitch
38x75 hw roof battens @ 900crs

Prefabricated timber roof trusses @ 900crs to manuf design ——
10mm plasterboard ceiling on 35x42 battens @ 450crs

|

'

i

i

i

i
i
|
\
|
|
|
i
\
i
i
|

_ Qe" TZ-Om Max height Tine

 

alignment

600

alignment

cotourbond custom orb roofing on R2.0 insulation blanket
38x75 hw roof battens @ 900crs
120x45 MGP12 rafters @ 900 crs to eng. detali

|
|

  
  
  
   
 
 
 
 
 
   
 
 
 
 
  
  
   

Hardie Linea weatherboards on sarking
to manuf $pecification

colourbond apron flashing
50x100hw top piate bolted to

blockwork
lockworl 230x85 17C lam in plate of trusses

PVC downpipe
all brackets & fixings to be stainless steel

 

colourbond quad gutter & folded
colourbon# fascia

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
 
   
     
 
  

 

90/90/90 FRL ceiling .

2 layers 16mm Gyproc Fyrchek |. fibrecement eaves lining

to CSR 876 specification 15° roof
top floor
10mm plasterboard linings on

init toon ava 100 15mm plapterboard battens @ 450 crs

. |

end of block wall to bear on (wall shaded by eaves)

top landing |
selected carpet over 15mm plywood substrate,

fa adhesive ree & screwed to slab
oO
SL 8.00 @
. ©) rebate slap 50mm for blockwork;
rsy—
N ive) 190mm reinforced blockwork
5 solid corejfilled to eng. detail
: . N
stair details:
18R per floor @ 175mm
P @ SY 30mm plasterboard battens @ 450 crs.
16T per floor @ 250mm provide 39mm insulation between battens.

      
 
 
 

 

 

reinforced concrete stair to
engineer's detail with

900h powdercoated alum
balustrading

3,150

U 15° roof pitch total R value for core filled, rendered wall:

= R14

\| ye tat oa ard hing on

ae |\|

A a Vy

— Vy)
Z

al by

_2,950

  

 
 
 
 
 

35x45 timber battens screwed to slab
provide + insulation batts between battens

 
 

concrete.
stair to be 1000mm min
clear width

 
        
  

 

 

  

 
 

 

 

 

colourbond custom orb roofing on foil sarking
38x75 hwlroof battens @ 900crs
timber rafters @ 900 crs to eng. detail

waterproof skimcoat render
& acrylic 4rmour paint finish

| 600 |

 
  

-/60/- rated glass bricks
Glass Bricks Australia ‘
‘Newave' or equiv |

      

—F

 
   
 

 

325 t

    
  

MOONEE eae

 
 

suspended concrete slab to
engineer's detail.

  
  
  
 
   
     
      
  

 

SSS OQOIAY

Ww

    

 

 

 

 

 

 

 

 

o off-form finish to soffit
al - Z
Doki gk pa YT
oO ® he ~ - Y Y garage ee ala, detail
y y concrete exposed aggregate driveway
|
SL 1.65 y y
—+ ——— 2
7,

NOTES:

protect against white ants to AS 3660.1.
Kordon or equivalent

.
Alt applications to manufacturer's written se ( ti O Nn E
specification

   
  
  
     

 
 
 
     

 
  

 
   
  
   

andrew mekellar Client

Drawing Drawn

AM

Location

K. & V. BRACKEN SECTION

 

design QBSA reg 65073

PO Box 1222 Phone/Fax:
TEWANTIN Q4565 (07) 5449 9066

181 GYMPIE TERRACE
NOOSAVILLE

 
   
 

   
 
  
  

 
  
 
   

Project

PROPOSED DUPLEX

Drawing no.

18.0707.3.5

Date

SEPT ‘07

   
   
 

Page 43

  

Hardie Linea weatherboards _ Hebel rendered window hood
on 20mm battens fixed to blockwork through bolted to blockwork
Paint finish

    

  
 
   
  
 
 

 
      
 
 
 
 
 

colourbond custom orb roofing
on R2.0 insulation blanket

  

Hebel rendered window hood
through bolted to blockwork

   
 
 
 

Hardie Linea fibrecement weatherboards
on sarking. paint finish

 

 
  

 
 

powdercoated alum shade battens

ne to engineer's detail

200x200 hw post set on galv
saddie.
oil finish

     
    

190 reinforced blockwork to
eng. detail

waterproof skimcoat render
& acrylic armour paint finish

 
  
  

  
 
 
 

 
 
 
  
  

window awning to detait

 
 

TT

aluminium framed window to schedule

 
  
  

 

semi-frameless glass balustrading
to detail

 
 
  
 

 

Hardie Linea fibrecement weatherboard
cladding over block column
paint finish

 
 
    
    
  
 

  

Metal Art Industries Panelift garage door with remote
Superslat screen pacific maple ply
ex 32x10x1.2 cladding to detail
powdercoat finish

east elevation

    

 
 
 
   
 
  

 
 

 
 

Hardie Linea weatherboards
on 20mm battens fixed to blockwork.

 
  

colourbond quad gutter & fascia

 
 
 
    

colourbond custom orb roofing
on R2.0 insulation blanket

 

powdercoated alum shade battens
to engineer's detail

 
   
  
 
 
  
    

   
 

f N pyc downpipe

all fixings to be stainless steel

 
 

Breezway louvres to schedule

200x200 hw post set on galv
saddle
oil finish

  
 
  
 
  
 

  

twin galv steel rafters @ post

Hardie Linea fibrecement weatherboard
cladding over block column.
paint finish

 
 
 
 
 
  
  

    
 

timber framed sliding door
to schedule

 
 

semi-frameless glass balustrading
to detail

   
 
  

   

stainless steet BBQ and
bench unit to future detail

waterproof skimcoat render
& acrylic armour paint finish

   
  
   

rendered block garden wail

 

north elevation

 
 
 
   

   

  
 
   
    
  
    

     

      

  
 

Client Scale

K. & V. BRACKEN

Project

PROPOSED DUPLEX

Location Drawing

     

 

andrew mekellar
design QBSA reg. 65073

PO Box 1222 Phone/Fax:
TEWANTIN 4565 (07) 5449 9066

     

AM 1:100

4.1

ELEVATIONS

  

     
     
   

181 GYMPIE TERRACE
NOOSAVILLE

  
  
 

    
  
  

 
 
  
  
 
 

  
   

Drawing no. Date

18.0707.4.1

   
 
   

SEPT ‘07!

 

 
 

Page 44

powdercoated alum shade battens
to engineer's detait

twin galv steel rafters @ post

200x200 hw post set on gaiv
saddle.
oil finish

semi-frameless glass balustrading
to detail

Hardie Linea fibrecement weatherboard
cladding over block column
paint finish

semi-frameless glass pool fencing
& pool gate, 1200h

colourbond custom orb roofing
on R2.0 insulation blanket

Hardie Linea weatherboards
on 20mm battens fixed ta blockwork.

Stainiess steel handrail at 1000h
over rendered blockwork

paint finish ~/60/- fire rated window to schedule

rendered & painted blockwork

are esr

 

 

 

 

 

alum framed louvre door lift control in
to schedule weatherproof enclosure

colourbond quad gutter & fascia

waterproof skimcoat render
& acrylic armour paint finish

south elevation

Client

K. & V. BRACKEN

ancdroaw sockeallar
design

PO Box 1222 Phone/Fax:
TEWANTIN 4565 = (07) 5449 9066

QBSA reg. 65073
Project

PROPOSED DUPLEX

Metal Art industries

Supersilat screen

ex 32x10x1.2
owdercoat fi

colourbond custom orb roofing
on R2.0 insulation blanket

Hardie Linea fibrecement weatherboards
on sarking. paint finish

pyc downpipe
all fixings to be stainless steel

Hebel rendered window hood
through bolted to blockwork

rendered block garden wall

Metal Art Industries
Superslat screen & gate
ex 32x10x1.2
powdercoat finish

Location Drawing

181 GYMPIE TERRACE
NOOSAVILLE

Drawing no.

ELEVATIONS

18.0707.4.2

Date

Hardie Linea fibrecement weatherboards
on sarking. paint finish

190 reinforced blockwork to
eng. detai!

waterproof skimcoat render
& acrylic armour paint finish

Hebel rendered window hood
through boited to blockwork

pve downpipe
ail fixings to be stainless steel

AM 1:100

sept‘07} 4?

 

Page 45

 

 

 

p> 4
a a a eee

and CH

2
a PZZIP LPP ery

¢ Sama aaa a's

LY y

HHT # +
X tH i?

 

 

 

 

OO oT OT

di NS 7
8 wig

y 7 3920h ceiling

 

 

 

 

 

 

 

second floor plan

generally: 2700h ceiling

 
 
 

P
) AI I ea Cer zz 7 | e g en d

Lo

 

 
 
 
 

 
  
 
 
 
  
  
 
 
  
   

OP oP
CA TG

shaded area denotes ;
Rw 45 suspended ceiling at 2500h to conceal services over
13mm Gyproc Soundchek plasterboard on timber
2500h ceiling joists @ 600crs
75mm glass wool partition batts over
lag pipes with Pyrotek 4525
see CSR spec $S23
note; max 4 downlights per 5sqm
Pp pe pene ans_to b-tob

   
 
 
 
  
    

 
   

 

pipe p a o-protected
with fire rated collars to manuf written specification
note: perimeter detailing of Rw rated ceilng to be in
accordance with manufacturer's specification to

ensure acoustic performance of ceiling in maintained

 

eo

  
    
 

[2272277

 

 

emergency light fixture to
AS 2293.1

 
   
 
 

 

combined exit / emergency Jight fixture
with directional arrow as shown,
to AS2293.1

   
  

first floor plan

generally: 2870h ceiling

 
 

s residential smoke detector/alarm
hardwaired & interconnected throughout building

   

external wail finishes; rendered & paintel blockwork
except as noted:

   
 
 
  
 
   

 

     
 

 

HL Hardie Linea weatherboards
on 20mm battens fixed to blockwork.
TT paint finish

 

 

 

 

  
 

 

   

|  *& 2550h
L_* eee
carpark

: |
2875h 2875h terrace

 

 

 

 

 
  
 

 

 

 

 

 

  

- workmanship and materials shall be in accordance
OT with relevant current s.a.a codes and statutory
authorities requirements

g rou nd floor pla n - all dimensions and levels to be checked on site by

: a builder before commencing work
generally: 2950h ceiling - do not scale drawings

  

—~
"

 

 
  

 

refer to engineer's drawings
for steps in suspended slab soffits

 
    
 

 
 
 
 
   
  
 
 
  
  
      
  

       
 
 
  
  
 
    

 
 
 
 
  
  
 
    
    
  

 
     
  

  

Client Location

K. & V. BRACKEN

andrew mekellar Drawing

ceiling plans/ CEILING PLAN

  

  
  
   
 
 
 
 

 
    
 
  
 
 

 
 
 
    
 

 

_ design QBSA reg. 65073 181 GYMPIE TERRACE
Wa II fi Ns h ES PO Box 1222 Phone/Fax: Project NOOSAVILLE Drawing no. Date

18.0707.5.1 SEPT '07

TEWANTIN 4565 (07) 5449 9066 PROPOSED DUPLEX

 

 
 

Page 46

 

 
 
 

 

 

 

= LAND USE SECTION FEE!
Ag NOOSA :

SALE OF DOCUMENTS
Superseded Planning Scheme Documentation
Copy of Permit/Approval Letter
The Noosa Plan Documentation

 

APPLICATION FEES
Material Change of Use - Code/Impact

 

 

 

Consistent 521
Inconsistent 521
Assessment under Superseded Planning Scheme 521
Modification to a Development Permit 521
Extension of a Currency Period 521
Operational Works - Landscaping tows 521
e@ Bldg Work assessable against the Planning Scheme §21
PRE LODGEMENT REVIEW
Half Hour 522
One Hour 522
ADVERTISING
Purchase Advertised Applications 523
JETTIES
Jetty Application Fee 524
Jetty Bond 51
(Category 4)
BONDS
Performance Bond 51
(Category 9)
SIGNS
Registration Fee 222
Bec FEE
Search of Land Use Section file 112
Liquor Licensing Request 113
TOTAL $
NAME: (eA ta Lon to {eo Fog 1's meh
appREss: fo foxe Y (4527. 7“ Y

 

A OB62 Ay, _ UTS

 

 

 

FILENO: OS 24 5 DATE: —/¢/r-4o08

|
RECEIPT NO: SbU105 7 Signature of TP Officer: D% free.
AUTHORITY NO: /

 

N¢€[ 2e0e/ 205] 1

Page 47

90P'$33J LNSNdO TAAZO/SNOLLNGISLNOD 9 SIasveudopaeg puey:d

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

fovea siteoen | iopeur Auedexd wo aaetieoe S19) s (spuog Buypnjouy) pred seed Jo 16301,
(6980) ts
reouesejey Jo ssequunn eti4 | ddAL Laiaded | SENTONW| Sa Ree eT

swopecct 3 loyeneg $ (spuog Bujpnjoxs) pred see, 30 18701

eS (dSq) Aemyjed ~ S91

£8 6S O8N VEU pexEpUE JOU WE (dOINUITO) PEOY — SO1

18S (Jeans EM 9 JeISeNY OMABSOON dSd) ebeuRRI - SOI

isseuppy 6SS (808d dSd) pur] uoTPaNeYy pure pods - Soi

owen eeked ¥9 (dd) Adding se48M - SO!

a RW NO LLWOP hdd 199 (Aypooxey dSq) ue\Gerey ugnos - ebesemes - SOI

19 (ey880D Sq) eBevemes - SO}

tu0;,9eg/peoy 296 (ety dSd) eberemeg - $9)

19S yodsuey) o#gnd — Sol

UEUTYDIED 09s (eagoe Aguauino jon) pu AyunuRLIOD - SOI

" SNOREEIEENOD DHIOMaVON gs Ayununuog pur syed JeyN0 — uognqujueg tedoyaneg

‘olf 9ss (Bupped 165 ¢4¢Sd) Sued is 0 ner ~ ‘quUOD Jedoyoneq]

LOREINIeD uoj2edsu; seo dS¢ Uety JeuNC Aemijey ~ voRnqujucd Jedoyeneg

SAT SS Sd BIA J81nO eGeuRIC — LoRNgLIUCD Jedofeneq

SRE £95 Sd VEIN JOIN PEDY — UORNGUIUOD sedoyeneq
Sli 0s5

78) vopEINT|eD uoReUwexg Ueld | gdAL ainda | LNIONO a ee

6S

985 uogoedsut AL HNO peso‘)

WOHBINDED 307 v6 (sy0m peyeydwooun ‘suoynququc]) 624 uLupy Burpuog

ee en, SOLLWIND TWO Sys 259N ‘S1ST] Aoyod ‘sjUaWINoOG Jo aes

eS sjuewnoog febe) ‘sued Aang - 903 Buyees

eS “OOnN uoReURUEXS jueWNOOG febe)]

zs nit uogoedsuy pret eB2UNEIQ / Peay

:sseippy bs UreX3 URI eBeURIG / peOY

soulen eokea Ors see aw

‘shesed pc + SONOd | saAt Leszdau |: LNNONIV. : Saiadd TVENOONY ROLES Ada 6°

 

 

 

 

 

a a
SNOLLNSINLNOS 2 S334 LNAWdO1SA50 aS

 

Used in these records

About this file

File size
5.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0215 - Op Works - Landscaping, Sediment & Erosion, Frontage Stormwater, Filling, Car Parking & Acess [As Published].pdf · 5.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.