Council archive · source document
08/0215 - Op Works - Landscaping, Sediment & Erosion, Frontage Stormwater, Filling, Car Parking & Acess [As Published] · 142008.215
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 April 2007 Works in tidal areas, coastai management districts and fish habitat areas tf you answered YES to Q5. and ticked any boxes in Q6). your application is required to be assessed against and must comply with the Wild Rivers Code. lf you answered YES to Q5 and ticked box i) in Q6, your application is required to be referred to the EPA. Note: If specified works are proposed in a local govemment area, it is prescribed tidal work — the Televant focal government will be the assessment manager with the EPA as a concurrence agency tf you answered YES to Q5, and ticked box ii) or iil) in Q6, your application requires referral to DPIF. if you answered NO to QS and ticked box i} in Q6, the application will not be accepted. Ifyou answered NO to Q85, ticked box ii) in Q6 and the development is necessary to install authorised works or infrastructure where a development permit is not required, or if a fequired permit is held, the application must be assessed against and must comply with the Wild Rivers Code. Applications for purposes other than specified works or as described above will Not be accepted. Ifyou answered NO at QS and ticked box iii) in Q6, the application may be made if the works are in aPA. These applications must be assessed against and must comply with the Wild Rivers Code. The application will not be accepted if the development is proposed to be located in a HPA. For more information about specified works refer to Guide 27 ls the development for specified works? (see definition in the Wild Rivers Act 2005 and Guide 27- Development in a wild river area) EX] No Clves The application is for one or more of the following: C i) Operational works that is tidal works or works in a coastal management district (ensure you have completed Part M and/or Part P of Form 1); OF J ii) Operational works for the removal, destruction or damage of marine plants (ensure you have completed Part Q2 of Form 1), or oO iii) Building or operational works in a fish habitat area (ensure you have completed Part O: of Form 1). Residential, commercial or industrial |7. Is the application for residential, commercial or industrial development in a designated urban development area? \fyou answered YES to Q7, your application is not subject to wild river requirements. Provided xl NO | YES there are no other aspects of this development that require assessment against the relevant wild| 8 |f NO, does the application for residential, commercial or industrial development involve: ter dectaration or Wild Rivers Code, you do not ; | . need to complete the remaining questions in O i) a material change of use made assessable in a local government planning scheme . ensure you have completed Part D of Form 1); or Section 2 you h leted Part D of Form 1 'fyou answered NO to Q7 and ticked either box os . . . . i) or ii) in Q8, the assessing agency is the i ii) operational works associated with reconfiguring a lot (ensure you have completed Part F relevant local government. The application must of Form 1), be assessed against and must comply with the Wild Rivers Code. Animal husbandry activities 9, Does the application involve a material change of use for animal husbandry activities (as defined Ifyou answered YES to Q9 your application under the Wild Rivers Act 2005) in a PA? requires assessment against and must comply with the Wild Rivers Code. & NO O YES (ensure you have completed Part R of Form 1) The assessing agency is NRW. Note: Applications for animal husbandry activities will not be accepted if proposed in a HPA, For more details and a definition of animal husbandry activities see the Wiki Rivers Act 2005 and refer to Guide 27. Agricultural activities 10. Does the application involve agricultural activities (as defined under the Wild Rivers Act 2005) in tfyou answered YES to Q10, your application a PA? fequires assessment against and must com wih the Wild Rivers Cole. vy &X) NO O YES (ensure you have completed Part Q of Form 1) The assessing agency is NRW. 11. If YES is the application for: Note: Applications for agricultural activities will Not be accepted if proposed ina HPA. For more details and a definition of agricultural activities see the Wiki Rivers Act 2005 and refer to Guide 27. The production of fodder in a PA, and pasture improvement using low impact soil disturbance techniques is not an agricultural activity as defined under the Wild Rivers Act 2005. For More information see Guide 27. (J i) a material change of use; or (J ii) operationat works. Page 12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0215 - Op Works - Landscaping, Sediment & Erosion, Frontage Stormwater, Filling, Car Parking & Acess [As Published]Related documentApplication case desk ↗
About this file
- File size
- 5.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.