Skip to the record
Trusted by locals. Built for Noosa.

Council archive · source document

08/0215 - Op Works - Landscaping, Sediment & Erosion, Frontage Stormwater, Filling, Car Parking & Acess [As Published] · 142008.215

of 47

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

2,590

810 970 810

4.810 ‘

 

 

 

1,810 .

 

 

 

 

 

 

 

2,410
2,110

 

 

 

 

 

 

 

N
oltward
opening
fg fg

 

 

 

 

 

 

 

 

2.410
SS +
eS

2.710 -

 

 

 

 

 

 

2,410

 

 

 

 

 

fg

 

 

 

 

rebate slab 30mm for sill

alum framed fixed
louvre doors

CD2

alum framed entry/exit
door with lever handle

CD1

, 1,410 ,

with cl

-/60/30 FRL door
in folded steel frame,

. 3,210 ,

rebate slab 50mm for silt; provide sub-sill as required

timber framed sliding doors
with 10.38mm lam glass

1D1, 2D1

joser

CD3

, 770 4

-/60/30 FRL door
in folded steel frame,
with closer

1D2, 2D2

. 1,370 .

rebate siab 50mm for sill; provide sub-sill as required

timber framed sliding door
with 10.38mm lam glass

1D3, 2D3

, 820 1

 

 

 

 

 

 

 

 

 

 

 

milky white
glass

rebate slab 50mm for sill; provide sub-sill as required

 

 

 

 

 

 

 

 

 

 

 

 

milky white
glass

rebate slab 50mm for sill; provide sub-sill as required

timber framed sliding door
with 10.38mm lam glass

1D4, 2D4

alum. framed sliding doors
with 6mm toughened glass

1D5, 2D5

_ 170 4 pe verify on r

ch

solid core cavity
sliding door

1id7, 2id7

2,410
2.110

 

alum framed sliding
wardrobe doors with
cotourbacked glass infil

typical wardrobe door

notes

*“ windows & doors to be quality, aluminium framed
‘Vantage’ or equivalent as selected; except as noted

* aluminium frames to be clear anodise finished to

* all reveals to be plasterboard

* frames & glazing to comply with relevant
Australian Standards

* all clear glazing unless otherwise noted

* builder to verify sizes on site

* Openings in blockwork to be waterproof membraned
before fitting window / door frames.

* door furniture to owner's specification

  
   
  
      
  

 

a)

andraw mekellar
design

PO Box 1222
TEWANTIN Q4565

2.410

 

 

 

timber framed bifolding
plantation louvre doors

1id1, 2id1

solid core door in
timber frame

lid2, 2id2
1id4, 2id4

door schedule

  
   

  
   
  
 
 
    
    

   

Client Location

K. & V. BRACKEN

QBSA reg 65073 181 GYMPIE TERRACE

NOOSAVILLE

 
 
 
     

Project

PROPOSED DUPLEX

Phone/Fax:
(07) 5449 9066

Aa

  

 

 

 

 

 

 

 

 

 

timber framed bifolding
louvre doors

1id3, 2id3

    
  
   
 

Drawing

SCHEDULE

 
 

 
 
   
 
 
  
 

Drawing no.

18.0707.2.1

      
  
 
       

    
  

A

Vy

solid core door in
timber frame

1id5, 2id5,
11d6, 2id6

2,410

 

 
   
 
 

Date

SEPT ‘07

   

 

Used in these records

About this file

File size
5.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0215 - Op Works - Landscaping, Sediment & Erosion, Frontage Stormwater, Filling, Car Parking & Acess [As Published].pdf · 5.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.