Skip to the record
Trusted by locals. Built for Noosa.

Council archive · source document

08/0215 - Op Works - Landscaping, Sediment & Erosion, Frontage Stormwater, Filling, Car Parking & Acess [As Published] · 142008.215

of 47

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

colourbond custom orb roofing on R2.0 insulation blanket. 20° roof pitch 5° roof pitch
38x75 hw roof battens @ 900crs

Prefabricated timber roof trusses @ 900crs to manuf design ——
10mm plasterboard ceiling on 35x42 battens @ 450crs

|

'

i

i

i

i
i
|
\
|
|
|
i
\
i
i
|

_ Qe" TZ-Om Max height Tine

 

alignment

600

alignment

cotourbond custom orb roofing on R2.0 insulation blanket
38x75 hw roof battens @ 900crs
120x45 MGP12 rafters @ 900 crs to eng. detali

|
|

  
  
  
   
 
 
 
 
 
   
 
 
 
 
  
  
   

Hardie Linea weatherboards on sarking
to manuf $pecification

colourbond apron flashing
50x100hw top piate bolted to

blockwork
lockworl 230x85 17C lam in plate of trusses

PVC downpipe
all brackets & fixings to be stainless steel

 

colourbond quad gutter & folded
colourbon# fascia

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
 
   
     
 
  

 

90/90/90 FRL ceiling .

2 layers 16mm Gyproc Fyrchek |. fibrecement eaves lining

to CSR 876 specification 15° roof
top floor
10mm plasterboard linings on

init toon ava 100 15mm plapterboard battens @ 450 crs

. |

end of block wall to bear on (wall shaded by eaves)

top landing |
selected carpet over 15mm plywood substrate,

fa adhesive ree & screwed to slab
oO
SL 8.00 @
. ©) rebate slap 50mm for blockwork;
rsy—
N ive) 190mm reinforced blockwork
5 solid corejfilled to eng. detail
: . N
stair details:
18R per floor @ 175mm
P @ SY 30mm plasterboard battens @ 450 crs.
16T per floor @ 250mm provide 39mm insulation between battens.

      
 
 
 

 

 

reinforced concrete stair to
engineer's detail with

900h powdercoated alum
balustrading

3,150

U 15° roof pitch total R value for core filled, rendered wall:

= R14

\| ye tat oa ard hing on

ae |\|

A a Vy

— Vy)
Z

al by

_2,950

  

 
 
 
 
 

35x45 timber battens screwed to slab
provide + insulation batts between battens

 
 

concrete.
stair to be 1000mm min
clear width

 
        
  

 

 

  

 
 

 

 

 

colourbond custom orb roofing on foil sarking
38x75 hwlroof battens @ 900crs
timber rafters @ 900 crs to eng. detail

waterproof skimcoat render
& acrylic 4rmour paint finish

| 600 |

 
  

-/60/- rated glass bricks
Glass Bricks Australia ‘
‘Newave' or equiv |

      

—F

 
   
 

 

325 t

    
  

MOONEE eae

 
 

suspended concrete slab to
engineer's detail.

  
  
  
 
   
     
      
  

 

SSS OQOIAY

Ww

    

 

 

 

 

 

 

 

 

o off-form finish to soffit
al - Z
Doki gk pa YT
oO ® he ~ - Y Y garage ee ala, detail
y y concrete exposed aggregate driveway
|
SL 1.65 y y
—+ ——— 2
7,

NOTES:

protect against white ants to AS 3660.1.
Kordon or equivalent

.
Alt applications to manufacturer's written se ( ti O Nn E
specification

   
  
  
     

 
 
 
     

 
  

 
   
  
   

andrew mekellar Client

Drawing Drawn

AM

Location

K. & V. BRACKEN SECTION

 

design QBSA reg 65073

PO Box 1222 Phone/Fax:
TEWANTIN Q4565 (07) 5449 9066

181 GYMPIE TERRACE
NOOSAVILLE

 
   
 

   
 
  
  

 
  
 
   

Project

PROPOSED DUPLEX

Drawing no.

18.0707.3.5

Date

SEPT ‘07

   
   
 

Used in these records

About this file

File size
5.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0215 - Op Works - Landscaping, Sediment & Erosion, Frontage Stormwater, Filling, Car Parking & Acess [As Published].pdf · 5.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.