08/0215 - Op Works - Landscaping, Sediment & Erosion, Frontage Stormwater, Filling, Car Parking & Acess [As Published] · 142008.215
INTEGRATED PLANNING ACT 1997 Part E, Version 2.1, 18 June 2007
Form 1 Development Application
‘Operational &/or building work
assessable against a local government's planning scheme
Completion of all question on Part E is mandatory for ail applications involving the assessment of operational work and/or building work assessable
against a local government's planning scheme (including detailed engineering plans and other plans, detailed engineering plans for subdivisional works and conceptual
design plans for engineering & building work when the application does not involve assessment of a material change of use of premises at the same time).
Nature of the works 1. The application is seeking approval of (tick one (1) or both if applicable):
The types of work that are assessable against C Building work assessable against a planning scheme - provide details of the aspects of building
a planning scheme are determined by the work (@.9. building height greater than 8.5m; building work on high landslip risk area)
scheme for a particular local govemment and
will vary across the State. [
To determine the types of work that are I Operational work assessable against a planning scheme - provide details of the nature of the
assessable under a particular planning
operational work (e.9. roadworks; landscaping; drainage works; stormwater, water infrastructure; sewerage
scheme, contact the relevant local pe (eo png 39 "9
infrastructure; earthworks; clearing vegetation; signage)
goverment. > - 7 TT: 7
The infomation in Q2 is necessary for pannscaping. Sediment & Erosion Control, Frontage, Stormwater, Filling, Car Parking &
statistical and planning purposes. CCESS
2. Is the application for operational work involving the creation of new lots?
No (11 YES - specify number of new lots to be created below
3. Does the proposal involve the construction of a canal that is associated with reconfiguring a lot?
&no YES
Nature of the application 4. This application is for: (tick one (1) or both if applicable)
A development permit authorises (2 Preliminary approval - provide details of the type of work eg. roadwork, stormwater, water and sewerage
development to occur, while a preliminary
a fi infrastructure, etc
approval is a step in the approval process |
and does not authorise development to occur.
4
[K] Development permit - provide details of the type of work eg. roadwork, stormwater, water and sewerage
infrastructure, etc
Landscaping, Sediment & Erosion Control, Frontage, Stormwater drainage, Filling, Car
Parking & Access
5. Are the works subsequent to a previous development permit or preliminary approval?
OONo (X] YES - provide details of all previous approvals
List of approval reference/s Date approved Date approval lapses
APPEAL NO. MD 2470F 24] 31/03 / 2006 21 1031210
Portable Long Service Leave levy (f {6. Is payment of a Portable Long Service Leave (PLSL) levy applicable to the proposal?
applicable) | [X] YES - complete Q7
Prior to issuing a development permit for the
works, the assessment manager is required LINO - a7, 8&9 do not apply
by law to “sight” an approved form, issued by .
Qleave, which signifies that the PLSLlevy |7. Has the PLSL levy been paid?
has been paid. - YES - complete 08
For further information refer to
htto ww. gleave.qid.gov.au Xl NO - the applicable levy must be paid before a development permit can be given for the works
8. How much was paid?
|
9, Whatis the receipt number of the payment?
L |
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0215 - Op Works - Landscaping, Sediment & Erosion, Frontage Stormwater, Filling, Car Parking & Acess [As Published]Related documentApplication case desk ↗
About this file
- File size
- 5.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.