Council archive · source document
RFI - RECOR RFI Response · MCU22/0197
12. Provide a Geotechnical Engineer report demonstrating the proposed works will
have no adverse effects on the existing slope stability conditions of the subject site or
any of the adjoining properties. The report must be prepared by a suitably qualified
person (RPEQ – Registered Professional Engineer of Queensland) and include
construction methodology, foundation recommendations etc.
13. Provide additional detail demonstrating how the proposed earthworks will not
undermine the structural integrity of adjoining properties.
A geotechnical report has been attached detailing the assessment of the proposed
development on the site’s slope stability. The construction methodology for the
development will incorporate the recommendations of the geotechnical report and will
be overseen by suitably qualified person/s during construction, to minimise any potential
impacts to adjoining properties.
We believe the revised design addresses the requirements of the RFI and should further
information be required please contact this office.
Yours faithfully,
RECOR Pty Ltd
Jaro Bauleka
Civil Engineer
RPEQ: 20693
P +61 7 5211 1003 A 37 Mary St, Noosaville Qld 4566 E [email protected] recorconsulting.com
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
RFI - RECOR RFI Response.pdfRelated documentApplication case desk ↗
About this file
- File size
- 35 KB (small file)
- File type
No other editions are linked here.