Skip to the record
Noosa's #1 Council Tracker.

Council archive · source document

S1301229_Submission-docs_070920 · OPW20/0145

of 4

Text shows just the words. Original shows the document exactly as it was published.

 PROJECT DATA CHECKLIST
Energex Project Number                                S1301229
Project Description                                   23 LOT C & I SUBDIVISION
Consultant Details
Name                                                  Peter Eustace & Associates               Telephone        (07) 5596 1425
Contact Name                                          AARON PRUSS


                           Checklist                                                                       Check Note

            1              Parameters - Residential or Commercial/Industrial
                                                    - ADMD complies with Planning Manual
                                                    - LV ties available
                                                    - Voltage drop calculations are included
                                                    - Line profiles are included with the design                                  N/A
                                                    - Commissioning Plan
            2              HV Planning Issues
                                                    - 11kV planning/switching issues have been clarified
                                                    - Environmental issues have been clarified                                    N/A
                                                    - Conflicts with adjacent subdivisions resolved                               N/A
                                                    - Issues regarding PMT equity resolved                                        N/A
                                                    - All other issues resolved and design detailed
            3              Design Lodgement Fee (ex. GST)
                                                    - N/A
                                                    - 0-5 Lots ($438.00)
                                                    - 6-25 Lots ($1,146.00)                                                      23 LOTS
                                                    - 26-50 Lots ($1,483.00)
                                                    - >50 or complex project ($1,815.00)
                                                    - Resubmission ($165.00 per hour)
            4              Subdivision Details Sheet

            5              Council approvals                                                                                      TBC

            6              Switching Fees

            7              Materials List

            8              Live line construction work and Live Line pricing spreadsheet                                          N/A



Submitted By Consultant
Name                                                  AARON PRUSS
Company Name                                          Peter Eustace & Associates


Signature                                                                                      Date             7/09/2020




It is the user’s responsibility to check currency of issue at time of use.
Revision: 24/04/2020

Used in these records

About this file

File size
433 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

S1301229_SUBMISSION-DOCS_070920.pdf · 433 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.