BUILDING WORKS SETOUT GENERAL NOTES TERMITE PROTECTION WALL & FLOOR LEGEND
Building Works to be setout by Licensed Surveyor. Toilet doors are to open outwards or be fitted with lift off The building shall be protected from subterranean termites
hinges in accordance with part 3.8.3.3 of BCA Housing by approved physical and/ or chemical barriers in RC Block
Identification and height verification survey to be carried Provisions. accordance with AS3660.1.
out once fascia/gutter and ridge to roof has been erected Reinforced Concrete
to confirm no works encroach boundaries and the building All glazing in buildings to comply with the requirements of The precise method of protection shall be determined by
has been constructed in accordance with approved plans part 3.6 of BCA2006 Housing Provision and AS1288/2005. the owner/ s and/ or builder only after consultation with a Timber Framed Wall
and height does not exceed 9.0m height limit as per the A glazing certificate from the manufacturer for compliance licensed pest control operator.
local planning scheme. with AS1288 must be provided on completion. FFL 3.500 Finished Floor Level generally designers
This information then shall be advised to the Local
Where existing crossover is modified the builder shall Government or Licensed Certifier prior to, or at the time of Structural Floor Level generally
ENERGY EFFICIENCY construct Kerb & Channel to match adjacent and to local lodgement of the Building Permit Application.
SFL 3.500
REQUIREMENT authority requirements. +SL 3.500 Spot Level
Pro Therm "Reflecta Cell" 7mm insulation to be installed to Thereafter, the owners shall ensure that any physical
all roof spaces (excluding decks) to manufacturer's All Balustrading to Decks shall be engineer certified. barriers are kept clear of garden beds and/ or soil build up, RL 3.500 Reduced Level
direction. that any chemical barriers remain undisturbed and that PO Box 262
Builder to allow for disposal from site all waste annual inspections (plus eradication as necessary ) are TOW 3.500 Top of Wall level Noosa Heads QLD 4567
Pro Therm "Reflecta Shield" 4mm insulation to be installed materials during demolition and construction period. carried out thoughout the life of the building by a licensed
pest control operator in accordance with AS3660.1.
GFA Telephone
Mobile
07 5447 5633
0419 758 478
to all exterior framed walls and framed floors in HOUSE AREAS
accordance with manufacturer's direction Smoke alarms must comply with AS 3786 and be
LOWER 209m2 [email protected]
All external doors and windows to be fitted with a seal to connected to the consumer mains power. Smoke alarms On the completion of the building prior to the final
UPPER 187m2
restrict air infiltration must be located in accordance with part 3.7.2.3 of the inspection by the licensed Building Certifier, a licensed www.kiddco.com.au
Total 396m2
building code of Australia. Pest Controller is to inspect and confirm that the termite
system installed has not been bridged or breached and the This drawing is to be read in
Hot water systems shall be fitted with a heat trap within BASEMENT 264m2 conjunction with Engineers Drawings &
required visual barrier has been maintained.
one metre of the outlet of the heater and before the first TANKING OF HABITABLE AREAS Site Cover Reports
branch. All steps in floors where retaining walls have been Site Area 607.04m2
Construction to comply
installed or where retaining walls are used as external
SUB-FLOOR VENTILATION Site cover 242.67m2(39.99%) with all relevant SAA &
All exhaust fans to conditioned spaces to be fitted with a walls of habitable rooms are to be waterproofed by an Note: The sub-floor space beneath the suspended floor of BCA Codes & standard
self closing damper. approved tanking system and installed by an accredited a building must be designed and constructed in Bldg By-law 1975 & as
accordance with Part 3.4.1.2 of BCA 2007 Housing amended
installer. Verify all dimensions on
Provisions.
EXCAVATIONS site prior to commencement
Sheet Piling to be designed and certified by RPEQ so as The approved system is to be certified for compliance of any works. These
upon completion. drawings are not to be
to support likely imposed loads and not cause or allow used for scaling
damage to adjacent building works or land. Copyright for design &
WATER PROOFING WET AREAS drawings remain the
property of the authors.
All boundary works, including temp. works not to encroach Waterproofing of wet areas to comply with AS3740-2004.
over boundary. A certificate including bathrooms, WC and laundry from an
approved waterproofing applicator will be required before
Builder to make allowance to prop, shore and retain the a final certificate can be issued.
sides of all excavations required for building construction.
The builder shall satisfy himself as to employ prior to
commencing 'any' excavation. Any slippage or damage STORMWATER
caused as a result of excavation shall be made good by Roof & surface stormwater to be disposed of in
builder. Adequate retention methods are the full accordance with local authority requirements
responsibility of the builder.
SEWERAGE
SURFACE WATER DRAINAGE Connection of house drains to sewer main to be carried
The ground beneath suspended floors must be graded so out in accordance with local authority requirements
that the area beneath the building is above the adjacent Project
external finished ground level and surface water is Proposed House
prevented from ponding under the building. Refer figure WATER SUPPLY
3.1.2.3 of BCA 2007 Housing Provisions. Water Supply: Connect to estate mains in accordance with Location
development approval and local authority requirements 15 Ross Crescent
The external finished ground level surrounding the building Sunshine Beach
must be graded to a slope not less than 50mm over the If mains water pressure exceeds or could exceed 500kPa, Client
first 1.0m from the building in accordance with Figure a water pressure limiting device shall be installed to
3.1.2.2 of BCA 2007 Housing Provisions. ensure that the maximum operating pressure at any outlet
Mark Bain
Drawing Title
within the boundaries of the property does not exceed 500 COVER SHEET
The finished ground level is to be a minimum of 150mm kPa.
below ground floor level. Scale Date
as shown @A3 22.03.16
Drawn By Job No:
JLK 1801
Drawing No. Issue No.
GSPublisherVersion 0.81.100.100
WD.101 S1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of sections 2 to 6 (of 22)
Section 2
designers
PO Box 262
Noosa Heads QLD 4567
ROSS
Telephone 07 5447 5633
Mobile 0419 758 478
[email protected]
www.kiddco.com.au
This drawing is to be read in
conjunction with Engineers Drawings &
KB 36
SH36
.607
Reports
240o00'00"
.735
KB 36 SH36
.684 .298
EO 36
240°00'00"
S .693
40.233
SH36
Construction to comply
.058
TE 36
EO 36 LE .271
S .614
40.233
37
SH36 BL 37
.083 D .2
with all relevant SAA &
SH35 SH36 49
EO 36 TE 36 .999 .117 SH36
S .315 LE .290
.15
.00
8 SH37
.256
EO 36 SH36
S .14 .837 SH37
2 .325
BCA Codes & standard
SH37 SH37 TW37
.276 .322 .5
03
SH37 SH36
SH35 .342 .354
.968
SH37
Bldg By-law 1975 & as
SH37 .246
EO 36 .326
S .14
2 SH37
.469 SH37
.252
SH37
amended
.372
SH36
.082
SH37 SH37
.604 .351
KB 36EO 36 EO 36 SH37
.428
S .460 S .324 .482 FL 40
Verify all dimensions on
EO 36 SH36 .084 SH37
S .17 .693 .281
1
KB 36 SH37
.465 .365 SH37
EO 36 .433
S .251 SH37
site prior to commencement
.496
CRESCENT
SH36 EO 36
.345 S .381 EO 37
S .201
PATHWAY
EO 36
S .726
of any works. These
SH37
.16
9
TO 35 EO 36
B .997 S .17
3 SH37 SH37
drawings are not to be
.269 .222
57
TO 36
B .078
SH35
EO 36
S .257 SH37
.225
used for scaling
330°00'00"
330°00'00"
.851 EO 36
SH35 S .417
.750
Copyright for design &
building
Existing
SH36
Ross Crescent
.13
7
1
SH37
15.088
15.088
EO 36 .388 SH37
SH35 S .376 .507
.584
36
SH36
.431
drawings remain the
.00
TO 36
B .031 EO 36
property of the authors.
S .629
SH36
SH37 .10
.13 5
SH35 0
KB 36 .481
.15
7 SH37
SH37 SH37 .17
.296 5
.211
330o00'00"
330o00'00"
TO 36
37
B .19 SH36 .00
1 .939
R
EO 37 SH37
N
S .267 .449
SH35
.937
15.088
15.088
P4
EO 37
S .094 FL 37
.527
SH35
.958
Section 3
81
TO 36
B .253
.00
SH35 TO 35
.846 B .984
36
12
SH35
.281
SH35
.735 SH37
SH35 .471
.565 TO 35
B .999
SH36 SH37
SH35 .776 .10
.222 0
SH35
.406 SH37
.563 SH36
US42 .990
SH35 .3 65
KB 35 .286
36 0.00 .892 PP 35
.15 SH35
7 .254
SH37
.296 SH37
SH35 SH37 .18
.356 .557 5
SH37
.379
SH35
.080
SH37
SH37 .15
.267 6
SH37 SH37
.455 .351
SH35
.14
240°00'00"
9
SH37 SH37
SH35 .459 .578
.677
SH36 SH37
.17 .006
8
37.00
SH37
36.00
SH35 SH34 SH36 SH36 SH37 .019 SH37
.076 .956 SH35 .453 SH37 SH37 SH37 SH37
40.233
SH35 SH36 .906 .286 .268 .224 .10 .034 .077 SH
W37
.15 .326 .021 TW38 TW388.
TW3 5 TW38 L37
.0.5
240o00'00"
PP 35 3 .450 .243 .230 9507
SH35 .351 435
.579
SH35
.034
40.233
Site Survey
- 1:200 Project
Proposed House
REAL PROPERTY DESCRIPTION
Location
Lot: 571 15 Ross Crescent
Parish: Weybe Sunshine Beach
County: March Client
Address:15 Ross Crescent Mark Bain
Sunshine Beach Drawing Title
QLD 4567 SITE SURVEY PLAN
Site Area: 607.04m2 Scale Date
as shown @A3 22.06.28
Drawn By Job No:
JLK 1801
Drawing No. Issue No.
GSPublisherVersion 0.81.100.100
WD.102 S1
[OCR of page images]
Ross Crescent
Site Survey
1:200
REAL PROPERTY DESCRIPTION
Lot: 571
Parish: Weybe
County: March
Address:15 Ross Crescent
Sunshine Beach
QLD 4567
Site Area: 607.04m?
240°00'00"
40.233 |.
Bulpling
Bunsixy
=d
330°00'00"
15.088
200000" .
40.233
kidd
+CO
designers
PO Box 262
Noosa Heads QLD 4567
Telephone 07 5447 5633
Mobile 0419 758 478
[email protected]
www.kiddco.com.au
This drawing is to be read in
Conjunction with Engineers Drawings &
Reports
Construction to comply
with all relevant SAA &
BCA Codes & standard
Bldg By-law 1975 & as
amended
Verify all dimensions on
site prior to commencement
of any works. These
drawings are not to be
used for scaling
Copyright for design &
drawings remain the
property of the authors.
NV
Project
Proposed House
Location
15 Ross Crescent
Sunshine Beach
Client
Mark Bain
Drawing Title
SITE SURVEY PLAN
Scale Date
as shown @A3_ 22.06.28
Drawn By Job No:
JLK 1801
Drawing No. Issue No.
WD.102 (s1)
Section 4
ARCHITECTURAL DRAWING SET
Set No. Name
WD.101 COVER SHEET
WD.102 SITE SURVEY PLAN
240o00'00"
40.233 WD.103 SITE COVER PLAN
WD.201 BASEMENT FLOOR PLAN
1,500
Landscape Landscape Landscape
2,000
WD.202 LOWER FLOOR PLAN
WD.203 UPPER FLOOR PLAN
5,895
Driveway 6,200 WD.204 ROOF PLAN designers
27,035 WD.205 BASEMENT FLOOR DIMENSION PLAN
8,595
Ross Crescent
WD.206 LOWER FLOOR DIMENSION PLAN
WD.207 UPPER FLOOR DIMENSION PLAN
13,050 WD.501 ELEVATIONS
WD.502 ELEVATIONS
WD.601 SECTIONS PO Box 262
330o00'00"
330o00'00"
Visitor Lot 571 WD.602 SECTIONS Noosa Heads QLD 4567
15.088
15.088
parking RP48112
WD.603 SECTIONS Telephone 07 5447 5633
WD.901 DOOR SCHEDULE Mobile 0419 758 478
4,000 WD.902 DOOR SCHEDULE [email protected]
8,735
WD.903 DOOR SCHEDULE
www.kiddco.com.au
WD.904 WINDOW SCHEDULE
2,000
Landscape
Landscape
WD.905 WINDOW SCHEDULE This drawing is to be read in
240o00'00" conjunction with Engineers Drawings &
WD.906 WINDOW SCHEDULE
40.233 Reports
Landscaping = 203.14m2
Construction to comply
with all relevant SAA &
1. Site Plan BCA Codes & standard
Bldg By-law 1975 & as
- 1:200 amended
Verify all dimensions on
site prior to commencement
of any works. These
drawings are not to be
used for scaling
Copyright for design &
drawings remain the
240o00'00" property of the authors.
40.233
GFA
HOUSE AREAS
N
LOWER 209m2
UPPER 187m2
Ross Crescent
Total 396m2
BASEMENT 264m2
242.79 m2
330o00'00"
330o00'00"
Lot 571 Site Cover
15.088
15.088
RP48112 Site Area 607.04m2 Project
Site cover 242.67m2(39.99%) Proposed House
Edge of building
Location
15 Ross Crescent
Eaves
Sunshine Beach
240o00'00"
40.233 Client
Mark Bain
Drawing Title
SITE COVER PLAN
Site Cover Scale Date
as shown @A3 22.06.28
- 1:200
Drawn By Job No:
JLK 1801
Drawing No. Issue No.
GSPublisherVersion 0.81.100.100
WD.103 S1
Section 5
1. FALLS, SLIPS, TRIPS 2. FALLING OBJECTS 5. MANUAL TASKS 7. CONFINED SPACES
a) WORKING AT HEIGHTS LOOSE MATERIALS OR SMALL OBJECTS Components within this design with a mass in excess of 25kg EXCAVATION
DURING CONSTRUCTION Construction, maintenance or demolition work on or around should be lifted by two or more workers or by mechanical lifting Construction of this building and some maintenance on the
Wherever possible, components for this building should be this building is likely to involve persons working above ground device. Where this is not practical, suppliers or fabricators building will require excavation and installation of items within
prefabricated off-site or at ground level to minimise the risk level or above floor levels. Where this occurs one or more of should be required to limit the component mass. excavations. Where practical, installation should be carried out
of workers falling more than two metres. However, the following measures should be taken to avoid objects falling All material packaging, building and maintenance components using methods which do not require workers to enter the
construction of this building will require workers to be from the area where the work is being carried out onto persons should clearly show the total mass of packages and where excavation. Where this is not practical, adequate support for
working at heights where a fall in below. practical all items should be stored on site in a way which the excavated area should be provided to prevent collapse.
excess of two metres is possible and injury is likely to result 1. Prevent or restrict access to areas minimises bending before lifting. Advice should be provided on Warning signs and barriers to prevent accidental or
from such a fall. The builder should provide a suitable barrier below where the work is being carried out. safe lifting methods in all areas where lifting may occur. unauthorised access to all excavations should be provided.
wherever a 2. Provide toeboards to scaffolding or work platforms. Construction, maintenance and demolition of this building will ENCLOSED SPACES
person is required to work in a situation where falling 3. Provide protective structure below the work area. require the use of portable tools and equipment. These should For buildings with enclosed spaces where maintenance or designers
more than two metres is a possibility. 4. Ensure that all persons below the be fully maintained in accordance with manufacturer’s other access may be required:
DURING OPERATION OR MAINTENANCE work area have Personal Protective Equipment (PPE). specifications and not used where faulty or (in the case of Enclosed spaces within this building may present a risk to
For houses or other low-rise buildings where electrical equipment) not carrying a current electrical safety
BUILDING COMPONENTS persons entering for construction, maintenance or any other
scaffolding is appropriate: tag. All safety guards or devices should be regularly checked purpose. The design documentation calls for warning signs
During construction, renovation or demolition of this building, parts
Cleaning and maintenance of windows, walls, roof or and Personal Protective Equipment should be used in and barriers to unauthorised access. These should be
of the structure including fabricated steelwork, heavy panels and
other components of this building will require persons accordance with manufacturer’s specification. maintained throughout the life of the building. Where workers
many other components will remain standing prior to or after
to be situated are required to enter enclosed spaces, air testing equipment
supporting parts are in place. Contractors should ensure that
where a fall from a height in excess of two metres is and Personal Protective Equipment should be provided. PO Box 262
temporary bracing or other required support is in place at all times
possible. Where this type of activity is required, scaffolding,
when collapse which may injure persons in the area is a 6. HAZARDOUS SUBSTANCES SMALL SPACES
Noosa Heads QLD 4567
ladders or trestles should be used in accordance with ASBESTOS
possibility. For buildings with small spaces where maintenance or other Telephone 07 5447 5633
relevant codes of practice, For alterations to a building constructed prior to 1990: access may be required: Mobile 0419 758 478
regulations or legislation. Mechanical lifting of materials and components during If this existing building was constructed prior to: Some small spaces within this building will require access by
For buildings where scaffold, ladders, trestles are not construction, maintenance or demolition presents a risk of falling 1990 - it therefore may contain asbestos construction or maintenance workers. The design [email protected]
appropriate: Cleaning and maintenance of windows, walls, objects. 1986 - it therefore is likely to contain asbestos documentation calls for warning signs and barriers to
roof or other components of this building will require persons to Contractors should ensure that appropriate lifting devices are either in cladding material or in fire retardant insulation material. www.kiddco.com.au
unauthorised access. These should be maintained throughout
be situated used, that loads are properly secured and that access to areas In either case, the builder should check and, if necessary, take the life of the building. Where workers are required to enter
where a fall from a height in excess of two metres is below the load is prevented or restricted. appropriate action before demolishing, cutting, sanding, drilling This drawing is to be read in
small spaces they should be scheduled so that access is for
possible. Where this type of activity is required, scaffolding, or otherwise disturbing the existing structure. conjunction with Engineers Drawings &
fall barriers or Personal Protective Equipment (PPE) should 3. TRAFFIC MANAGEMENT short periods. Manual lifting and other manual activity should
Reports
be used in accordance with relevant codes of practice, For building on a major road, narrow road or steeply sloping POWDERED MATERIALS be restricted in small spaces.
regulations or legislation. road: Parking of vehicles or loading/unloading of vehicles on this Many materials used in the construction of this building can cause 8. PUBLIC ACCESS Construction to comply
roadway may cause a traffic hazard. During construction, harm if inhaled in powdered form. Persons working on or in the Public access to construction and demolition sites and to areas
b) SLIPPERY OR UNEVEN SURFACES building during construction, operational maintenance or
with all relevant SAA &
FLOOR FINISHES Specified maintenance or demolition of this building designated parking for under maintenance causes risk to workers and public. Warning BCA Codes & standard
workers and loading areas should be provided. Trained traffic demolition should ensure good ventilation and wear Personal signs and secure barriers to unauthorised access should be Bldg By-law 1975 & as
If finishes have been specified by designer, these have
management personnel should be responsible for the supervision of Protective Equipment including protection against inhalation while provided. Where electrical installations, excavations, plant or amended
been selected to minimise the risk of floors and paved areas
these areas. using powdered material or when sanding, drilling, cutting or loose materials are present they should be secured when not Verify all dimensions on
becoming slippery when wet or when walked on with wet
For building where on-site loading/unloading is restricted: otherwise disturbing or creating powdered material. fully supervised. site prior to commencement
shoes/feet. Any changes to the specified finish should be
made in consultation with the designer or, if this is not Construction of this building will require loading and unloading of TREATED TIMBER 9. OPERATIONAL USE OF BUILDING of any works. These
practical, surfaces with an equivalent or better slip materials on the roadway. Deliveries should be well planned to The design of this building may include provision for the inclusion drawings are not to be
avoid congestion of loading areas and trained traffic management of treated timber within the structure. Dust or fumes from this RESIDENTIAL BUILDINGS used for scaling
resistance should be chosen.
personnel should be used to supervise loading/unloading areas. material can be harmful. Persons working on or in the building This building has been designed as a residential building. If it, Copyright for design &
FLOOR FINISHES By Owner
For all buildings: at a later date, it is used or intended to be used as a drawings remain the
If designer has not not been involved in the selection of during construction, operational maintenance or demolition should
Busy construction and demolition sites present a risk of collision workplace, the provisions of the Work Health and Safety Act property of the authors.
surface finishes, the owner is responsible for the selection of ensure good ventilation and wear Personal Protective Equipment
where deliveries and other traffic are moving within the site. A traffic 2011 or subsequent replacement Act should be applied to the
surface finishes in the pedestrian trafficable areas of this including protection against inhalation of harmful material when
management plan supervised by trained traffic management new use.
building. Surfaces should be selected in accordance with AS sanding, drilling, cutting or using treated timber in any way that
HB 197:1999 and AS/NZ 4586:2004. personnel should be adopted for the work site. may cause harmful material to be released. Do not burn treated
STEPS, LOOSE OBJECTS AND UNEVEN SURFACES 4. SERVICES timber. 10.OTHER HIGH RISK ACTIVITY
Due to design restrictions for this building, steps and/or All electrical work should be carried out in accordance with
GENERAL VOLATILE ORGANIC COMPOUNDS
ramps are included in the building which may be a hazard Rupture of services during excavation or other activity creates a Code of Practice: Managing Electrical Risks at the
Many types of glue, solvents, spray packs, paints, varnishes
to workers carrying objects or otherwise occupied. Steps variety of risks including release of hazardous material. Existing Workplace, AS/NZ 3012 and all licensing requirements.
and some cleaning materials and disinfectants have dangerous
should be clearly marked with both visual and tactile services are located on or around this site. Where known, these All work using Plant should be carried out in accordance
emissions. Areas where these are used should be kept well
warning during construction, maintenance, demolition and are identified on the plans but the exact location and extent of with Code of Practice: Managing Risks of Plant at the
ventilated while the material is being used and for a period after
at all times when the building operates as a workplace. services may vary from that indicated. Services should be Workplace. All work should be carried out in accordance
installation. Personal Protective Equipment may also be
Building owners and occupiers should monitor the located using an appropriate service (such as Dial Before You with Code of
required. The manufacturer’s recommendations for use must be
pedestrian access ways and in particular access to areas Dig), appropriate excavation practice should be used and, Practice: Managing Noise and Preventing Hearing Loss at
carefully considered at all times.
where maintenance is routinely carried out to ensure that where necessary, specialist contractors should be used. Work. Due to the history of serious incidents it is
surfaces have not moved or cracked so that they become Locations with underground power:
SYNTHETIC MINERAL FIBRE recommended that particular care be exercised when
Fibreglass, rockwool, ceramic and other material used for thermal or undertaking work involving steel construction and concrete
uneven and present a trip hazard. Spills, loose material, Underground power lines MAY be located in or around this site.
stray objects or any other matter that may cause a slip or sound insulation may contain synthetic mineral fibre which may be placement. All the above applies.
All underground power lines must be disconnected or carefully Project
trip hazard should be cleaned or removed from access located and adequate warning signs used prior to any
harmful if inhaled or if it comes in contact with the skin, eyes or other
sensitive parts or the body. Personal Protective Equipment including Proposed House
ways. construction, maintenance or demolition commencing.
protection against inhalation of harmful material should be used THESE NOTES MUST BE READ AND UNDERSTOOD
Contractors should be required to maintain a tidy work Locations with overhead power lines:
site during construction, maintenance or demolition to Overhead power lines MAY be near or on this site. These pose a when installing, removing or working near bulk insulation material. BY ALL INVOLVED IN THE PROJECT. Location
reduce the risk of trips and falls in the workplace. risk of electrocution if struck or approached by lifting devices or TIMBER FLOORS THIS INCLUDES (but is not excluded to):
Materials for construction or maintenance should be other plant and persons working above ground level. Where there This building may contain timber floors which have an applied finish. 15 Ross Crescent
stored in designated areas away from access ways and is a danger of this occurring, power lines should be, where Areas where finishes are applied should be kept well ventilated OWNER, BUILDER, SUB-CONTRACTORS, Sunshine Beach
work areas. practical, disconnected or relocated. Where this is not practical during sanding and application and for a period after installation. CONSULTANTS, RENOVATORS, Client
adequate warning in the form of bright coloured tape or signage Personal Protective Equipment may also be required. The
should be used or a protective barrier provided. manufacturer’s recommendations for use must be carefully
OPERATORS, MAINTAINERS, Mark Bain
considered at all times. DEMOLISHERS. Drawing Title
OHS
Scale Date
as shown @A3 22.06.28
Drawn By Job No:
JLK 1801
Drawing No. Issue No.
GSPublisherVersion 0.81.100.100
WD.104 S1
Section 6
200 22,198
designers
C
A
B
3,000
Shoring to engineers detail
36.25 36.5 36.75 37.00 37.25 240o00'00"
40.233
1,504
1,500
landscaped retaining wall Ventalation location
200
W66 W67 W68 W69 W70 W71 W72
PO Box 262
200
Grated drain Noosa Heads QLD 4567
Telephone 07 5447 5633
5,899
Basement Mobile 0419 758 478
3,000
D01
Fall F
RL 35.100 37.50 37.25
4,196
[email protected]
www.kiddco.com.au
6,095
5,694
Fall Fall
This drawing is to be read in
Sump Drain conjunction with Engineers Drawings &
landscaped retaining wall Shoring to engineers Reports
Fall detail
Construction to comply
13,092
200
Lift shaft to with all relevant SAA &
3,000 manufacturers 37.25 BCA Codes & standard
200
11,587
11,195
2,800
2,499
2,899
up Bldg By-law 1975 & as
Storage detail
amended
1 2 3 4 5 6 7 8 9 10 11 12 13
FFL 35.100 E
Verify all dimensions on
1 2 3 4 5 6
D02
300 site prior to commencement
of any works. These
drawings are not to be
200
1,000
Visitor R.C coloumn to
engineers details
D03
Pool Over used for scaling
Copyright for design &
W65
Parking Slab over
reducing ceiling Lift 1,000 drawings remain the
330o00'00"
FFL 35.700
5,492
height to 2m property of the authors.
Powder coated
15.088
W64
4,093
aluminium slats
4,293
Ventalation location
up
N
W63
Stair
Pool Over
200
37.50
2,000
240o00'00"
34.95 35.25 35.50 35.75 36.00 36.5 36.75 37.00 37.25 40.233 37.25
36.25 Shoring to engineers detail
Project
C
B
200 3,020 200 12,000 200 2,600 200 6,000 200 799 200 Proposed House
A
Location
3,220 21,398 1,000 15 Ross Crescent
Sunshine Beach
Client
1. Carpark Plan Mark Bain
Drawing Title
- 1:100 BASEMENT FLOOR PLAN
Scale Date
as shown @A3 22.06.28
Drawn By Job No:
JLK 1801
Drawing No. Issue No.
GSPublisherVersion 0.81.100.100
WD.201 S1
The text continues on section 7.