Rfi - Ross Crescent Working Drawings

of 22

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 4, section 1. The text section number identifies this passage in the reader.

        1. FALLS, SLIPS, TRIPS                                                       2. FALLING OBJECTS                                                           5. MANUAL TASKS                                                               7. CONFINED SPACES
        a) WORKING AT HEIGHTS                                                          LOOSE MATERIALS OR SMALL OBJECTS                                             Components within this design with a mass in excess of 25kg                   EXCAVATION
                 DURING CONSTRUCTION                                                   Construction, maintenance or demolition work on or around                    should be lifted by two or more workers or by mechanical lifting              Construction of this building and some maintenance on the
                 Wherever possible, components for this building should be             this building is likely to involve persons working above ground              device. Where this is not practical, suppliers or fabricators                 building will require excavation and installation of items within
                 prefabricated off-site or at ground level to minimise the risk        level or above floor levels. Where this occurs one or more of                should be required to limit the component mass.                               excavations. Where practical, installation should be carried out
                 of workers falling more than two metres. However,                     the following measures should be taken to avoid objects falling              All material packaging, building and maintenance components                   using methods which do not require workers to enter the
                 construction of this building will require workers to be              from the area where the work is being carried out onto persons               should clearly show the total mass of packages and where                      excavation. Where this is not practical, adequate support for
                 working at heights where a fall in                                    below.                                                                       practical all items should be stored on site in a way which                   the excavated area should be provided to prevent collapse.
                 excess of two metres is possible and injury is likely to result       1.  Prevent or restrict access to areas                                      minimises bending before lifting. Advice should be provided on                Warning signs and barriers to prevent accidental or
                 from such a fall. The builder should provide a suitable barrier          below where the work is being carried out.                                safe lifting methods in all areas where lifting may occur.                    unauthorised access to all excavations should be provided.
                 wherever a                                                            2. Provide toeboards to scaffolding or work platforms.                       Construction, maintenance and demolition of this building will                ENCLOSED SPACES
                 person is required to work in a situation where falling               3. Provide protective structure below the work area.                         require the use of portable tools and equipment. These should                 For buildings with enclosed spaces where maintenance or                             designers
                 more than two metres is a possibility.                                4.    Ensure that all persons below the                                      be fully maintained in accordance with manufacturer’s                         other access may be required:
                 DURING OPERATION OR MAINTENANCE                                            work area have Personal Protective Equipment (PPE).                     specifications and not used where faulty or (in the case of                   Enclosed spaces within this building may present a risk to
                 For houses or other low-rise buildings where                                                                                                       electrical equipment) not carrying a current electrical safety
                                                                                       BUILDING COMPONENTS                                                                                                                                        persons entering for construction, maintenance or any other
                 scaffolding is appropriate:                                                                                                                        tag. All safety guards or devices should be regularly checked                 purpose. The design documentation calls for warning signs
                                                                                       During construction, renovation or demolition of this building, parts
                 Cleaning and maintenance of windows, walls, roof or                                                                                                and Personal Protective Equipment should be used in                           and barriers to unauthorised access. These should be
                                                                                       of the structure including fabricated steelwork, heavy panels and
                 other components of this building will require persons                                                                                             accordance with manufacturer’s specification.                                 maintained throughout the life of the building. Where workers
                                                                                       many other components will remain standing prior to or after
                 to be situated                                                                                                                                                                                                                   are required to enter enclosed spaces, air testing equipment
                                                                                       supporting parts are in place. Contractors should ensure that
                 where a fall from a height in excess of two metres is                                                                                                                                                                            and Personal Protective Equipment should be provided.               PO Box 262
                                                                                       temporary bracing or other required support is in place at all times
                 possible. Where this type of activity is required, scaffolding,
                                                                                       when collapse which may injure persons in the area is a                    6. HAZARDOUS SUBSTANCES                                                         SMALL SPACES
                                                                                                                                                                                                                                                                                                                      Noosa Heads QLD 4567
                 ladders or trestles should be used in accordance with                                                                                              ASBESTOS
                                                                                       possibility.                                                                                                                                               For buildings with small spaces where maintenance or other          Telephone         07 5447 5633
                 relevant codes of practice,                                                                                                                        For alterations to a building constructed prior to 1990:                      access may be required:                                             Mobile            0419 758 478
                 regulations or legislation.                                           Mechanical lifting of materials and components during                        If this existing building was constructed prior to:                           Some small spaces within this building will require access by
                 For buildings where scaffold, ladders, trestles are not               construction, maintenance or demolition presents a risk of falling           1990 - it therefore may contain asbestos                                      construction or maintenance workers. The design                     [email protected]
                 appropriate: Cleaning and maintenance of windows, walls,              objects.                                                                     1986 - it therefore is likely to contain asbestos                             documentation calls for warning signs and barriers to
                 roof or other components of this building will require persons to     Contractors should ensure that appropriate lifting devices are               either in cladding material or in fire retardant insulation material.                                                                             www.kiddco.com.au
                                                                                                                                                                                                                                                  unauthorised access. These should be maintained throughout
                 be situated                                                           used, that loads are properly secured and that access to areas               In either case, the builder should check and, if necessary, take              the life of the building. Where workers are required to enter
                 where a fall from a height in excess of two metres is                 below the load is prevented or restricted.                                   appropriate action before demolishing, cutting, sanding, drilling                                                                                 This drawing is to be read in
                                                                                                                                                                                                                                                  small spaces they should be scheduled so that access is for
                 possible. Where this type of activity is required, scaffolding,                                                                                    or otherwise disturbing the existing structure.                                                                                                   conjunction with Engineers Drawings &
                 fall barriers or Personal Protective Equipment (PPE) should         3. TRAFFIC MANAGEMENT                                                                                                                                        short periods. Manual lifting and other manual activity should
                                                                                                                                                                                                                                                                                                                      Reports
                 be used in accordance with relevant codes of practice,                For building on a major road, narrow road or steeply sloping                 POWDERED MATERIALS                                                            be restricted in small spaces.
                 regulations or legislation.                                           road: Parking of vehicles or loading/unloading of vehicles on this           Many materials used in the construction of this building can cause          8. PUBLIC ACCESS                                                      Construction to comply
                                                                                       roadway may cause a traffic hazard. During construction,                     harm if inhaled in powdered form. Persons working on or in the                Public access to construction and demolition sites and to areas
        b) SLIPPERY OR UNEVEN SURFACES                                                                                                                              building during construction, operational maintenance or
                                                                                                                                                                                                                                                                                                                      with all relevant SAA &
                 FLOOR FINISHES Specified                                              maintenance or demolition of this building designated parking for                                                                                          under maintenance causes risk to workers and public. Warning        BCA Codes & standard
                                                                                       workers and loading areas should be provided. Trained traffic                demolition should ensure good ventilation and wear Personal                   signs and secure barriers to unauthorised access should be          Bldg By-law 1975 & as
                 If finishes have been specified by designer, these have
                                                                                       management personnel should be responsible for the supervision of            Protective Equipment including protection against inhalation while            provided. Where electrical installations, excavations, plant or     amended
                 been selected to minimise the risk of floors and paved areas
                                                                                       these areas.                                                                 using powdered material or when sanding, drilling, cutting or                 loose materials are present they should be secured when not         Verify all dimensions on
                 becoming slippery when wet or when walked on with wet
                                                                                       For building where on-site loading/unloading is restricted:                  otherwise disturbing or creating powdered material.                           fully supervised.                                                   site prior to commencement
                 shoes/feet. Any changes to the specified finish should be
                 made in consultation with the designer or, if this is not             Construction of this building will require loading and unloading of          TREATED TIMBER                                                              9. OPERATIONAL USE OF BUILDING                                        of any works. These
                 practical, surfaces with an equivalent or better slip                 materials on the roadway. Deliveries should be well planned to               The design of this building may include provision for the inclusion                                                                               drawings are not to be
                                                                                       avoid congestion of loading areas and trained traffic management             of treated timber within the structure. Dust or fumes from this               RESIDENTIAL BUILDINGS                                               used for scaling
                 resistance should be chosen.
                                                                                       personnel should be used to supervise loading/unloading areas.               material can be harmful. Persons working on or in the building                This building has been designed as a residential building. If it,   Copyright for design &
                 FLOOR FINISHES By Owner
                                                                                       For all buildings:                                                                                                                                         at a later date, it is used or intended to be used as a             drawings remain the
                 If designer has not not been involved in the selection of                                                                                          during construction, operational maintenance or demolition should
                                                                                       Busy construction and demolition sites present a risk of collision                                                                                         workplace, the provisions of the Work Health and Safety Act         property of the authors.
                 surface finishes, the owner is responsible for the selection of                                                                                    ensure good ventilation and wear Personal Protective Equipment
                                                                                       where deliveries and other traffic are moving within the site. A traffic                                                                                   2011 or subsequent replacement Act should be applied to the
                 surface finishes in the pedestrian trafficable areas of this                                                                                       including protection against inhalation of harmful material when
                                                                                       management plan supervised by trained traffic management                                                                                                   new use.
                 building. Surfaces should be selected in accordance with AS                                                                                        sanding, drilling, cutting or using treated timber in any way that
                 HB 197:1999 and AS/NZ 4586:2004.                                      personnel should be adopted for the work site.                               may cause harmful material to be released. Do not burn treated
                 STEPS, LOOSE OBJECTS AND UNEVEN SURFACES                            4. SERVICES                                                                    timber.                                                                     10.OTHER HIGH RISK ACTIVITY
                 Due to design restrictions for this building, steps and/or                                                                                                                                                                       All electrical work should be carried out in accordance with
                                                                                       GENERAL                                                                      VOLATILE ORGANIC COMPOUNDS
                 ramps are included in the building which may be a hazard              Rupture of services during excavation or other activity creates a                                                                                          Code of Practice: Managing Electrical Risks at the
                                                                                                                                                                    Many types of glue, solvents, spray packs, paints, varnishes
                 to workers carrying objects or otherwise occupied. Steps              variety of risks including release of hazardous material. Existing                                                                                         Workplace, AS/NZ 3012 and all licensing requirements.
                                                                                                                                                                    and some cleaning materials and disinfectants have dangerous
                 should be clearly marked with both visual and tactile                 services are located on or around this site. Where known, these                                                                                            All work using Plant should be carried out in accordance
                                                                                                                                                                    emissions. Areas where these are used should be kept well
                 warning during construction, maintenance, demolition and              are identified on the plans but the exact location and extent of                                                                                           with Code of Practice: Managing Risks of Plant at the
                                                                                                                                                                    ventilated while the material is being used and for a period after
                 at all times when the building operates as a workplace.               services may vary from that indicated. Services should be                                                                                                  Workplace. All work should be carried out in accordance
                                                                                                                                                                    installation. Personal Protective Equipment may also be
                 Building owners and occupiers should monitor the                      located using an appropriate service (such as Dial Before You                                                                                              with Code of
                                                                                                                                                                    required. The manufacturer’s recommendations for use must be
                 pedestrian access ways and in particular access to areas              Dig), appropriate excavation practice should be used and,                                                                                                  Practice: Managing Noise and Preventing Hearing Loss at
                                                                                                                                                                    carefully considered at all times.
                 where maintenance is routinely carried out to ensure that             where necessary, specialist contractors should be used.                                                                                                    Work. Due to the history of serious incidents it is
                 surfaces have not moved or cracked so that they become                Locations with underground power:
                                                                                                                                                                    SYNTHETIC MINERAL FIBRE                                                       recommended that particular care be exercised when
                                                                                                                                                                    Fibreglass, rockwool, ceramic and other material used for thermal or          undertaking work involving steel construction and concrete
                 uneven and present a trip hazard. Spills, loose material,             Underground power lines MAY be located in or around this site.
                 stray objects or any other matter that may cause a slip or                                                                                         sound insulation may contain synthetic mineral fibre which may be             placement. All the above applies.
                                                                                       All underground power lines must be disconnected or carefully                                                                                                                                                                  Project
                 trip hazard should be cleaned or removed from access                  located and adequate warning signs used prior to any
                                                                                                                                                                    harmful if inhaled or if it comes in contact with the skin, eyes or other
                                                                                                                                                                    sensitive parts or the body. Personal Protective Equipment including                                                                              Proposed House
                 ways.                                                                 construction, maintenance or demolition commencing.
                                                                                                                                                                    protection against inhalation of harmful material should be used              THESE NOTES MUST BE READ AND UNDERSTOOD
                 Contractors should be required to maintain a tidy work                Locations with overhead power lines:
                 site during construction, maintenance or demolition to                Overhead power lines MAY be near or on this site. These pose a               when installing, removing or working near bulk insulation material.           BY ALL INVOLVED IN THE PROJECT.                                     Location
                 reduce the risk of trips and falls in the workplace.                  risk of electrocution if struck or approached by lifting devices or          TIMBER FLOORS                                                                 THIS INCLUDES (but is not excluded to):
                 Materials for construction or maintenance should be                   other plant and persons working above ground level. Where there              This building may contain timber floors which have an applied finish.                                                                             15 Ross Crescent
                 stored in designated areas away from access ways and                  is a danger of this occurring, power lines should be, where                  Areas where finishes are applied should be kept well ventilated               OWNER, BUILDER, SUB-CONTRACTORS,                                    Sunshine Beach
                 work areas.                                                           practical, disconnected or relocated. Where this is not practical            during sanding and application and for a period after installation.           CONSULTANTS, RENOVATORS,                                            Client
                                                                                       adequate warning in the form of bright coloured tape or signage              Personal Protective Equipment may also be required. The
                                                                                       should be used or a protective barrier provided.                             manufacturer’s recommendations for use must be carefully
                                                                                                                                                                                                                                                  OPERATORS, MAINTAINERS,                                             Mark Bain
                                                                                                                                                                    considered at all times.                                                      DEMOLISHERS.                                                        Drawing Title
                                                                                                                                                                                                                                                                                                                      OHS

                                                                                                                                                                                                                                                                                                                      Scale                   Date
                                                                                                                                                                                                                                                                                                                      as shown @A3 22.06.28
                                                                                                                                                                                                                                                                                                                      Drawn By                Job No:
                                                                                                                                                                                                                                                                                                                      JLK                     1801
                                                                                                                                                                                                                                                                                                                      Drawing No.             Issue No.


GSPublisherVersion 0.81.100.100
                                                                                                                                                                                                                                                                                                                      WD.104 S1
Log in to download the original file

RFI - ROSS CRESCENT WORKING DRAWINGS.pdf · 1.6 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.