Council archive · source document
RFI - Engineering Response · MCU26/0001
Our Reference: 2613
15 May 2026
Noosa Shire Council
PO Box 141
Tewantin QLD 4565
Attention: Georgina Schramm
Dear Georgina,
RE: APPLICATION FOR A DEVELOPMENT PERMIT FOR A MATERIAL CHANGE OF
USE AND OPERATIONAL WORKS
DEVELOPMENT APPLICATION NO. MCU26/0001 & OPW26/0002
17 BOTTLEBRUSH AVENUE, NOOSA HEADS
LOT 143 ON RP88934
FOR MADE ONE Pty Ltd
INFORMATION REQUEST RESPONSE (Engineering)
In reference to the Information Request issued by Noosa Shire Council, dated 9 April
2026, we provide the following responses to the Civil Engineering items. The following
supporting documentation is attached to this response:
• Appendix A – Revised Civil Engineering Drawings, prepared by Barlow Shelley
The civil design supporting the application has been revised by Barlow Shelley in
response to the matters raised. The stormwater management outcomes established in
the Stormwater Management Plan prepared by RECOR Consulting Engineers (Ref:
P0433-25-001, dated 7 January 2026) have been retained and implemented in this
redesign, including the 8kL on-site detention tank sized to attenuate post-development
peak flows to pre-development levels for all storm events up to and including the 1%
AEP.
STORMWATER
• Item 6 – Revised Drainage Design
Items have been addressed - refer to amended Civil Engineering drawings
included in Appendix A. The stormwater drainage design has been revised to
address the matters raised and to demonstrate compliance with Performance
Outcomes PO3 and PO4 of the Water Quality and Drainage Code. Refer to the
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 3 pages
Page 2
Revised Civil Design Drawings included in Appendix A. The existing gully pit
surround and lids are proposed to be replaced in accordance with Noosa Shire
Council Standard Drawing 9223A and previous gully pit 2/1 has been removed
/ deleted.
EXISTING INFRASTRUCTURE
• Items 7-9 – Existing Stormwater Infrastructure
The existing Council stormwater line located along the western side of the
property has been identified from available Council records and considered in
the proposed development layout. This alignment is indicative only and needs
to be confirmed through locator services during the construction phase.
The intent of the development is to retain and protect the existing stormwater
infrastructure in its current alignment. Detailed structural design, footing design
and temporary works associated with the basement construction will be
undertaken by the project structural engineer.
The structural engineer will be required to demonstrate that the development
does not impose additional loading on the stormwater asset and that the
proposed footings and excavation works are appropriately designed relative to
the zone of influence of the existing infrastructure. Required protection and
support of the infrastructure will need to be designed and certified by the
structural engineer in accordance with QDC MP1.4 and relevant engineering
standards.
If deemed appropriate through the delivery of the work, the stormwater line may
need to be replaced on the existing alignment.
The proposed development maintains an open-to-sky setback adjacent to the
western boundary to preserve future access to the stormwater infrastructure for
inspection, maintenance and potential replacement works. Accordingly, the
development is intended to maintain the ongoing function and maintainability of
the Council asset.
RAINWATER RETENTION
• Item 10 – Rainwater Storage for Non-Potable Reuse
A single 3,000L rainwater tank is proposed for the development, to be use for
non-potable purposes, being predominantly the irrigation of the on-site
landscaped areas.
Compliance is demonstrated against Performance Outcome PO2, which
requires that development "maximises water efficiency on site by incorporating
2613 – 17 Bottlebrush Ave, Noosa Heads – RFI Response Letter –15.05.2026 2
TB
Page 3
rainwater collection and reuse measures for non-potable purposes such as
irrigation".
To demonstrate that the proposed 3,000L tank maximises water efficiency on
site, a Water Balance Model has been prepared for the development. The model
assesses the capture of rainwater from a 242m² roof catchment and its reuse
for irrigation of 158m² of landscaped area at an irrigation rate of 548 mm/year,
using historical daily rainfall data for the Noosa locality (Bureau of Meteorology
Station 040908).
The Water Balance Model demonstrates that the single 3000L tank meets 93% of
the irrigation demand in the 2023 design year (based on historical data) and 80%
of the irrigation demand across the assessed 10-year rainfall record. In accordance
with SC6.7 PSP6 This confirms that the tank is appropriately sized to the available
roof catchment and the intended non-potable reuse, and that it is highly effective
in capturing and reusing rainwater on site. Given the limited roof catchment area
available, a larger combined storage volume would yield only marginal additional
reuse relative to the increase in tank size.
On this basis, the proposed 3,000L rainwater tank is considered to maximise water
efficiency on site and to satisfy Performance Outcome PO2 of the Sustainable
Building Design Code and has been implemented into the architectural design.
2613 – 17 Bottlebrush Ave, Noosa Heads – RFI Response Letter –15.05.2026 3
TB
Page 4
The hydraulic consultant will be responsible for the design and implementation of
the tank, with overflow connected to the stormwater drainage system.
ACCESS
• Item 11 – Footpath / Driveway Grade
Items have been addressed - refer to amended Civil Engineering drawings included
in Appendix A. The location of the existing footpath (immediately behind the kerb)
is non-standard and arguably is used for bin collection rather than a pedestrian
thoroughfare. Regardless, to achieve compliance for the frontage of the proposed
development, a new footpath is proposed on a standard alignment which crosses
the driveway crossover maintaining a maximum 2.5% crossfall. Temporary infill
triangles of concrete are proposed to taper the footpath back to the existing
alignment on both sides of the development, thus allowing future direct connection
as each adjoining property if developed.
PARKING
• Item 11 – Forward Gear Manoeuvring
Items have been addressed - refer to amended Civil Engineering drawings included
in Appendix A. The architectural design proposes the use of a vehicle turntable,
which will be designed and documented by others. Utilising this, vehicle swept path
assessments have been undertaken to demonstrate that the vehicle can enter and
leave the site in a forward gear for all parking spaces in accordance with the
AS2890.1.
Should you have any queries with respect to the above, please contact the
undersigned.
Yours Sincerely,
TIM BURKE
RPEQ (25245)
For and on behalf of:
BARLOW SHELLEY PTY LTD
2613 – 17 Bottlebrush Ave, Noosa Heads – RFI Response Letter –15.05.2026 4
TB
Used in these records
RFI - Engineering Response.pdfRelated documentApplication case desk ↗
About this file
- File size
- 489 KB (small file)
- File type
No other editions are linked here.